Loading...
HomeMy WebLinkAboutWPO201700030 Checklist - Project Closeout (Administrative) 2022-03-23 (2) WPO FILE CLOSEOUT CHECKLIST WPO 2D17-30/CA5C4-DlA aor-46 I Purge Unnecessary Files: folder to contain either digital, or hardcopies...not both. Digital files should all be in CV Documents under that WPO with the exception of pipe, and other videos which may be on flash drives and kept in the folder. ,/Approved plan (can be in the PPP). Include all drainage calcs. ,/Copy of SWPPP Copy of Recorded SWM Maintenance Agreement Nutrient Credit Affidavit ( Wee MatoU w o•• 3-0-Z2> As-Built drawings: • Signed &dated professional seal of the engineer/surveyor, and the name &address of the firm on the cover page; • Construction/inspection records by operator to verify dimensions, mtls, & installation of the facility including: Inspection records/photos for pipe trenches, bedding, underdrains; Video of any pipes that are not accessible/viewable; Updated location of all facilities using geo coordinates; Verified drainage area maps for area treated, and areas to facilities; Current surveys of all earthen structures. Ponds shall include a survey to verify pond volumes are pursuant to design; Plantings: location and type; Plans& profiles for all culverts, pipes, risers, weirs and drainage structures including type of structure, culvert/pipe,weir, inlet&outlet end sections, inlet&outlet protection, alignment& invert elevations compared to the plan; Computations for significant deviations from the plan. Computations are required to verify as-built conditions meet, or exceed design criteria; Ditch Lines and Channels shall be displayed as constructed and shall include typical sections and linings; Easements of any platted easements with deed book and page provided. Copies of recorded documents are required; Guardrail,fences&other safety provisions constructed shall be identified on the plan with type, length and end treatments compared to the plan; Materials: provide bioretention/filter media type and depth (bio media to be state-approved mix), stone layers, sand layers, keyways and cores must be verified as to type and depth. Inspection reports, boring/test pit reports, and material certifications; Access Roads: show location, surface treatment, drainage, etc; Compaction Reports are required to verify fill compaction in dams; Manufacturer's Certifications for proprietary BMPs certifying installation and functionality pursuant to the plan j Engineer's Certification (can be on As-Built) ! CGP Notice of Termination (N.O.T.): ( neno✓trn 07 �� �` 3 8-22 • Verify fields have been filled out accurately; • If site utilizes SWM Facility from larger CPD, but is not a "regional" facility, note quality is satisfied by the VAR10#of that CPD permit, and place under"comments" on the N.O.T. - Erosion Erosion Control,or SWM Performance Bond Release: For BIESC the inspector verifies project completion, updates CV review status to "approved/complete". For BISWM the inspector verifies project completion and obtains county engineer's approval before updating CV review status. Inspector completes the bond release form and attaches to file,then places on manager's desk to process. It is the inspector's responsibility to verify all required documents included in this checklist are either in hard copy form and in the folder, or in CV under the WPO#. Manager reviews folder for accuracy, scans the release form and forwards to Ana &cA-e/J}- EAria notifying them that the WPO qualifies for bond release and to process. .- Inspection Reports: A minimum of 2 county inspection reports shall be included. Reports may either be digital and found in CV, or may be hard copy form. One of the reports must be the final bond release inspection report verifying completeness. Outstanding Fees: Applicant is responsible for any/all outstanding fees prior to bond release. Fees shall include re-inspection fees, annual permit maintenance fees, etc. Applicant shall be notified by inspector prior to performing final inspection that there "may" be outstanding fees, but bond shall not be released until all fees have been paid.