Loading...
HomeMy WebLinkAboutWPO201800056 Checklist - Project Closeout (Administrative) 2022-03-24 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND AGING CENTER INSTRUCTIONS RELEASE) CHECKLIST The Inspector/Management Analyst is to complete this form? � {;;, :o of release;place the completed form in the WPO folder and forward to the AP Imaging LaserFiche. Once items have been placed in LaserFiche,Imaging Centerpro Center ject completion and/or bond �g staff will forward to Centralized Fr digital closeout lilin' WPO# 2 DES` PROJECT TITLE Wau)O i—//zz___ FULL NAME INSPECTOR�0O1-), / CountyView- FINAL ACTION DATE: -�'( � . ty ' ❑Status/Status Date updated IIardcopy-File Folder Closeout: _____-i---- `�� chronological order(latest on top). All items listed should be placed in,pioject folder,in reverse Please check each item included in this folder. To indicate that an item is not a ' next to the check box. The Inspector/Management Analyst has the discretion to inc de anyitem provide clarity to the file,please indicate that• � pplic�ble to this file,place an"N/A" item on the"Other"lines provided. Iuu deemed necessary to Digital gital Closeout Instructions: Below each item please indicate if Ima or,if the document is already in digital format,can be'saved to LaserFiche. Please Center is to scan the document; (path/name)of the document in the space pr • ed, de the digital location 0 Preconstruction Meeting Fo ❑ Scan Saved location i ❑ Grading Permit ❑ S 0 Saved location ' ❑ Inspec • Requests Scan ❑ Saved location spection Results(Include any inspection tickets,memos,photos,etc.) 1 ❑ Scan 0 Saved location &1113ond Reduction/Bond Release Notices from Inspector to Mann A Scan Bement Analyst ❑�Saved location ❑ Co s ervation Checklist • • Scan 0 Saved location 1 ❑ As-built onstruction Plans a can ❑ Saved location ❑ Other(Please ex s ain) ❑ Scan 0 Saved location ❑ Other Plans - At the I s ector's discretion, copies of unapproved may be placed in the file if they lend clarity to the revie at a later date. If such plans are included, the should plans/plats unapproved and contain a n 1 .• clarifying why it was included. be clearly marked as • ❑ Scan 0 Sa'-. location NOTES: wP0 project folders will be accepted by the Imaging Center when the following items ar 1) Checklist is completed and included in folder; a complete:___________ omplete:N -__ 2) Documents are Acco-fastened(except plats/plans),and in chronological order(latest documents 3) Documents are sufficiently identified as to which need to be scanned or saved to erFiche. If the above items are not complete,Imaging P on top); Engineer for corrective action. g Center staff will circle the incomplete item a d return folder to the County I Draft 12-5-2013 I I