Loading...
HomeMy WebLinkAboutWPO202100060 Correspondence 2022-04-10BOHLERI County of Albemarle Community Development Department 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Attn: David James Dear Mr. James, 9100 Arboretum Parkway, Suite 360 Richmond, VA 23236 o.804.893.8200 April 8, 2022 Via Federal Express Re: WPO202100060 Discount Tire — VSMP Permit Plan 2"d Review Response 1636 Seminole Trail Charlottesville, VA 22901 Albemarle County V211201 Bohler Engineering is pleased to submit on behalf of Halle Properties, LLC the revised VSMP Permit Plan 31d Submission for the Discount Tire in Albemarle County, Virginia. The following is our comment response letter addressing comments dated March 11, 2022. Each comment is addressed and responded to as follows: A. Stormwater Pollution Prevention Plan (SWPPP) Comment 1: Section 8 - Complete. (Rev. 1) Please complete prior to pre -con request. Response 1: Acknowledged. Section 8 on the SWPPP will be completed prior to pre - construction request. Comment 2: Section 9 — Sign & date. (Rev. 1) Please complete prior to plan approval. Response 2: Acknowledged. Section 9 on the SWPPP will be completed prior to plan approval. Comment 3: Section 10 — Complete. (Rev. 1) Please complete prior to pre -con request. Response 3: Acknowledged. Section 10 on the SWPPP will be completed prior to pre - construction request. C. Stormwater Management Plan (SWMP) Comment 2: [C-901] Use the 1-year design storm values in your Energy Balance to determine if you meet compliance. 2-yr was used/shown. (Rev. 1) See below and revise values, EB worksheet where needed. Change value from 3.65" to 3.01 ". Response 2: Design storm values have been revised. See Sheet C-901 for revised EB worksheet, pre and post flow rates, and Sheets C-903 — C-906 for updated Hydrograph Reports. w . BohlerEngineering.com BOHLERI David James VSMP Permit Plan 2nd Review Response April 8, 2022 Page 2 of 2 Comment 3: [C-901] Revise Hydrographs: NOAA Atlas 14 lists the 24-hr i(in) as these for the design storms. (Rev. 1) Not addressed. ^_a.hr _ 3A1 3.65 1-.5 - 5.51 1 3 38 _u a t 3 1' S_3 92 6 to Response 3: Design storm values have been revised. See Sheet C-901 for revised EB worksheet, pre and post flow rates, and Sheets C-903 — C-906 for updated Hydrograph Reports. Comment 10: Record the SWM Maintenance agreement. Response: Acknowledged; SWM Maintenance agreement to be approved and recorded prior to plan approval. (Rev. 1) Not addressed. Response 10:SWM Maintenance Agreement coordination and review ongoing; to be approved and recorded prior to plan approval. Comment 11: Note: SWM easement plat & deed will need to be recorded. Response 11: Easement plat to be submitted under separate cover. VSMP plan to be updated with record information upon recordation of plat. Comment 12: Purchase of credits needed prior to permit issuance. Response 12: Acknowledged; Nutrient Credit availability letter for 0.66 credits is shown on Sheet C-908. Nutrient credit purchase and agreement to be finalized prior to permit issuance. D. Erosion and Sediment Control Plan Comment 8: Note: VDOT entrance permit required prior to grading permit issuance. Response 8: Acknowledged. Should you have any questions regarding this project or require additional information, please do not hesitate to contact me at (804) 893-8200. Sincerely, Bohler Engineering Ryan Yauger, P.E. RY/je H:121N2112011Administrative\Letters1220408 VSMP Permit Plan 2nd Review CRL.doc www.BohlerEngineenng.com