Loading...
HomeMy WebLinkAboutWPO202100064 Bond Estimates 2022-04-12Project Name: DS Tavern WPO/VSMP Plan Amendment WPO file number: WP02021-00064 TMP(s): 05900-00-00-015A1, 05900-00-00-015AO Date Estimate Completed: 4-12-2022 Erosion & Sediment Control Plan Bond Estimate 4/12/2022 Item Item No. Unit Unit Cost Cost Number installed i stablization (PS, TS) 0.7 acres $5,000.00 $3,300.00 z silt fence (SF) 151.0 it $5.00 $755.00 3 safety fence (SAF) 20.0 it $5.00 $100.00 3 Tree protection (TP) 200.0 it $5.00 $1,000.00 4 diversion (DD, FD, RWD) 0.0111t $13.00 $0.00 5 temporary slope drain (TSD) pipe length -ft pipe diameter 0 in $0.00 $0.00 39 silt fence inlet protection (IP) 18 $100.00 $1,800.00 40 stone inlet protection (IP) 0 $200.00 $0.00 41 outlet protection (OP) length It width 3 0 1 $121.50 $121.50 42 outlet protection (OP) length It width 0 0 0 $0.00 $0.00 43 channel (SCC, matted) length It oft width 0 0 0 $0.00 44 check dam depth in channel channel width 0 0 0 $0.00 $0.00 45 construction entrance (CE) 0 $2,500.00 $0.00 46 wash rack 1 $2,000.00 $2,000.00 47 paved construction entrance 1 $3,500.00 $3,500.00 48 rip -rap, placed depth ft length 28.0 0 49 width (tons) lz.11. $60.00 $724.50 50 51 survey and layout (price per 0.1 mi.) acres traps and basins lirr- 0 $0.00 52 mobilization $2,500.00 cost sum $15,801.00 WP0202100MADS Tavern Amendment_041222 contingency $1,580.10 Total $17,390 4/12/2022