RE: SDP 04-030 Albemarle Baptist Church Final Site Plan
The Albemarle County Department of Planning and Community Development will approve the
above-mentioned final site plan when the following items have been addressed satisfactorily.
Please note that the following conditions are those that have been identified at this time.
Additional conditions may be added or eliminated based on further review. [Where appropriate,
comments are preceded by the applicable reference]:
�1. [SP 01-047, #1 J Administrative approval of all conditions of the Architectural Review
Board's Certificate of Appropriateness.
2. [SP 01-047, #4] Virginia Department of Health must grant approval of the proposed well
and septic systems.
3. [SP 01-047, #9] The Virginia Department of Transportation must grant approval of the
entrance and any other improvement related to the public road rights-of-way.
Mylars will not be accepted for signatures until all departments have granted final tentative
approval. In accordance with Section 32.6.1,mylar copies of the site plan must be sealed, signed
and dated by an architect,professional engineer, land surveyor, or certified landscape architect
when submitted for final approval.
Please contact me at your earliest convenience if you have any questions or require further
assistance.
Copy: File SDP 04-030
Of A
8 Mire
tipr
COUNTY OF ALBEMARLE
Department of Planning&Community Development
401 McIntire Road,Room 218
Charlottesville,Virginia 22902-4596
(434)296-5823
Fax(434)972—4012
July 13,2004
Dex Sanders
Sanders Architect,PC
16102 Raccoon Ford Road
Culpeper,VA 22701
RE: ARB-2004-19 and 2004-57: Albemarle Baptist Church
Dear Mr. Sanders,
I have reviewed your plans with revision date of June 15, 2004 for the above-referenced project. I have
the following comments:
1. You have shown tree protection fencing in this revision, but the extent of fencing stills needs to
be adjusted. I have included a highlighted copy of the drawing to indicate our expectations for
the extent of the tree protection fencing. Please adjust the extent of the tree protection fencing
on your drawings.
2. On the revised landscape plan,you have noted a 6"limit on the size of scrub to be removed. This
revision has been approved.
A Certificate of Appropnateness from the ARB is required pnor to final site plan approval from the
Community Development Department. The described changes to the plan are required to receive a
Certificate of Appropriateness.
Please submit 2 copies of revised drawings addressing these comments at your earliest convenience.
Include a memo indicating how each condition has been satisfied. If changes other than those requested
have been made, identify those changes in the memo also. When staff's review of this information
indicates that all conditions of approval have been met,a Certificate of Appropriateness may be issued.
If you have questions, feel free to contact me.
Sincerely,
Amy Arnold
Landscape Planner
Cc: ARB fil
pF AL
COUNTY OF ALBEMARLE Engineering Plan Review Comments
Department of Community Development x,+�1( ,.�
Current Development Group '
t I
Project: Albemarle Baptist Church
oik
Plan pre parer: Dex A. Sanders,Architect (540) 829-2591 ,e'
P P [fax ] ,t
Muncaster Engineering[fax 973-0249] 96
Owner or rep.: Albemarle Baptist Church [none given] i `_l,
Plan received date: 25 Mar 2004(fsp, swm ecp),6 May 2004(fsp),29 Jun 2004(fsp),
6 Jul 2004(swm,ecp) W
su Date of comments: 23 Apr 2004 fs swm ec 24 May2004 fs 3 Jul 210' (fsp) ftli-
P (fsp, P), ( P),
Review Engineer: Glenn Brooks
A. Road and drainage plan:
1. Please provide drainage computations; for the spread in the parking area,the entrance culvert,and
proposed channels [18-32.6.6d, 32.7.4,DM902B4]
2. VDOT approval of right-of-way and entrance improvement is required. [DM902B]
B. Stormwater management plan: (computations were received and reviewed via e-mail the week
of 19 May 2004. Other comments are unchanged.)
1. Please provide easements of the storm -r facility and access.
2. Please show the dam with a mini •. top width of 8' (DSM 503.1E4&909.2A VSMH3.01)
lilA A 3. Please enlarge the barrel pip- . a minimum of 15"(DSM503.1E).
601111w 4. Please provide an adequ. - stormwater conveyance channel from the South West corner of the parking lot
to the stormwater m. agement facility ending in an apron on the top of the soil mix.
5. A Stormwater r agement Facilities Maintenance Agreement is required. Please submit the latest version,
*r dated August 1.99,typed and signed in black ink by the owner,along with the $16 recordation fee. Note:
The plan cannot be approved until the Maintenance Agreement has been received,approved and recorded.
C. Erosion and sediment control plan: (Comments are unchanged. Revisions have not been received.)
Narrative:
.The existing site conditions shall have the following added: "The site gently slopes towards Hydraulic Road
in two directions. The majority of the site currently drains through an existing 24"RCP under Roslyn
Ridge Road and into a drainage swale on the parent parcel. The remainder of the site enters an existing
storm sewer system on Hydraulic Road and will not be disturbed as a part of this plan."
2.The" l asre "should rep shall :
a) Erosion A Temporary Pavedu Cons ctlion Entranceort the shall bedevices installedbe at the beginningthis of the project. The
installation
Contro of thMee entran willo require thehow removal of a portion of the existing
on concrsiteete ditch where an
18"RCP will be inst ed with transitions to the existing concrete ditch on either end. This will allow
the off-site clean ter to continue to pass through the site without treatment for sediment loads.
Construction a ance activities may require additional silt fence installation along the length of the
entrance to protect the existing conveyance channel from sediment deposition.
b) Silt fence will be installed along both side of the existing concrete ditch as shown on the E&SC plan
sheet to prevent sediment leaving the site. Additional silt fence may be required in the area of the
proposed signage for this site.
) Cleanwater Diversion shall be installed to reduce the drainage area required for sediment trap
sizing. The cleanwater diversion shall be installed and stabilized according to detail pnor to site
grading and sediment trap installation.
Engineering Plan Review Comments
Page 2 of 2
A sediment trap shall be constructed for the remaining 0.31 acres drainage area and must be
installed and stabilized prior to site grading.
Outlet Protection shall be installed on both outlet pipes as shown on the E&SC plan immediately
after installation.
Inlet protection shall be installed on the yard drain in the future lawn/patio area immediately after
installation to prevent sediment compromising the capacity of the structure.
g Dust Control measures shall be utilized to prevent the movement of dust from exposed soil surfaces
and reduce the presents of airborne substances which may present health hazards,traffic safety
problems or harm animal and plant life.
Plan sheet:
3.Remove the 1"=30' scale from the corner of the plan sheet unless it refers to one of the details on the plan
sheet.
4.Vicinity map is required.
5.Please update the Paved Construction entrance detail i.e. Remove reference to stone entrance and show
pavement requirements.
The E&SC portion of the Water Protection bond is$23,000.00 and shall become a part of the whole Water
Protection Bond amount. Please submit 4 copies of the E&SC plan and narrative for the pre-construction
meeting to be held in this office.
Copy: file SDP200400030
File:E3_fsp,swm,ecp_GEB_Albemarle Baptist at Roslyn.doc
COUNTY OF ALBEMARLE
Department of Community Development,Current Development Division
Engmeermg Plan Review
To: Jim Kesterson,VDOT
From: Glenn Brooks
Subject: Albemarle Baptist Church
Date: 13 July 2004
Please find attached 2 copies of the latest site plan revision for your review and approval. Thanks.
Copy: file SDP-2004-00013
File:memo.doc