HomeMy WebLinkAboutSDP200400030 Review Comments 2004-07-27 OF A
'COUNTY OF ALBEMARLE Engineering Plan Review Comments
Department of Community Development 6_3%gam;:
=��
Current Development Group
Project: Albemarle Baptist Church
Plan preparer: Dex A. Sanders,Architect[fax(540) 829-2591]
Muncaster Engineering[fax 973-0249]
Owner or rep.: Albemarle Baptist Church [none given] p)'
Plan received date: 25 Mar 2004(fsp, swm ecp),6 May 2004(fsp),29 Jun 2004(fsp),
6 Jul 2004(swm,ecp), 1 Jul 2004(fsp)
Date of comments: 23 Apr 2004(fsp,swm,ecp),24 May 2004(fsp), 13 Jul 2004(fsp),
27 Jul 2004(fsp)
Review Engineer: Glenn Brooks
A. Road and drainage plan:
1. Please provide drainage computations;for the spread in the parking area,the entrance culvert, and
proposed channels [18-32.6.6d,32.7.4,DM902B4]
B. Stormwater management plan:
1. A Stormwater Management Facilities Maintenance Agreement is required. Please submit the latest version,
dated August 1999,typed and signed in black ink by the owner,along with the$16 recordation fee.Note:
The plan cannot be approved until the Maintenance Agreement has been received,approved and recorded.
C. Erosion and sediment control plan: (Comments are unchanged. Revisions have not been received.)
1. The erosion control plan and narrative have been approved. The E&SC portion of the Water Protection
bond is$23,000.00 and shall become a part of the whole Water Protection Bond amount. Please submit 4
copies of the E&SC plan and narrative for the pre-construction meeting to be held in this office.
Copy: file SDP200400030,WP0200400017
File:E4_fsp,swm,ecp_GEBAlbemarle Baptist at Roslyn.doc
A X
COUNTY OF ALBEMARLE A a I.Rn
OF Plan Review Comments
Department of Engineering&Public Works �®
(434)296-5861 Fax(434)972-4035 .41t11 1:
�IRGINIP
wvvw.albemarle.org/engineer
Project: Albemarle Baptist Church
Plan preparer: Muncaster Engineering(973-0249),Dex A. Sanders(540.829.2591)
Owner or rep.: Albemarle Baptist Church(Fax#Not Provided)
Plan received date: 06 Jul 2004
Date of comments: 21 Jul 2004
Lead Engineer: Glenn Brooks
A. Stormwater management plan comments: (Mark Chambers, Water Resources
Reviewer/Inspector)
1. All comments have been addressed. The stormwater management plan can be approved when the stormwater
management facilities maintenance agreement has been submitted and approved. The stormwater management
portion of the water protection bond is$15,000.00. Please contact Pam Shifflett for additional information
concerning the bond.
2. A Stormwater Management Facilities Maintenance Agreement is required.Please submit the latest version,
dated August 1999,typed and signed in black ink by the owner,along with the$16 recordation fee. Note: The
plan cannot be approved until the Maintenance Agreement has been received,approved and recorded.
Attachment: (none)
Copy: WP0200400018
File:Plan Review/Final Plan Review Form Letter.doc