Loading...
HomeMy WebLinkAboutSDP200400030 Review Comments 2004-06-17 C! 7/45/o gay oo AL friRGjNP COUNTY OF ALBEMARLE Department of Planning&Community Development 401 McIntire Road,Room 218 Charlottesville,Virginia 22902-4596 (434)296-5823 Ext.3385 Fax(434)972-4012 MEMORANDUM (FAX) TO: Dex Sanders (540-829-2591) FROM: Stephen B. Waller AICP, Senior Planner DATE: June 17, 2004 RE: SDP 04-030 Albemarle Baptist Church Final Site Plan The Albemarle County Department of Planning and Community Development will approve the above-mentioned final site plan when the following items have been addressed satisfactorily. Please note that the following conditions are those that have been identified at this time. Additional conditions may be added or eliminated based on further review. [Where appropriate, comments are preceded by the applicable reference.]: [SP 01-047, #1] Administrative approval of all conditions of the Architectural Review Board's Certificate of Appropriateness. 2 [SP 01-047, #4] Virginia Department of Health approval of the proposed well and septic systems. 3. [SP 01-047, #8] Please provide a note on the cover sheet to clarify that this proposal is only being reviewed for the improvements identified as part of Phase I. Future phases will require amendment(s) showing alterations to the limits of clearing, as well as revisions to erosion and sediment control plans, landscaping and other relevant aspects of the current plan. [SP 01-047, #9] The Virginia Department of Transportation must grant approval of the entrance and any other improvement related to the public road rights-of-way. In comparing the revised plan with the original proposal, it appears that the trees addressed in VDOT comments, dated April 5, 2004,have not been adjusted to address concerns for site distance. 5. [32.7.9.8.c(3)] Show the locations of any ground-based HVAC equipment or any other similar utilities. Please note that such items are considered to be objectionable feature that must be screened from adjacent rural and residential properties and public roads. Albemarle Baptist Final June 17, 2004 Page 2 Mylars will not be accepted for signatures until all departments have granted final tentative approval. In accordance with Section 32.6.1,mylar copies of the site plan must be sealed, signed and dated by an architect,professional engineer, land surveyor, or certified landscape architect when submitted for final approval. Please contact me at your earliest convenience if you have any questions or require further assistance. Copy: File SDP 04-030