HomeMy WebLinkAboutSDP200400030 Correspondence 2004-06-28 .....�+�+1 i A. va t-a..mLLIvx-11WL of AL Review Submission Form
Department of Community Develc tt •1i
401 McIntire Road,Room 227 �; ��
Charlottesville,Virginia 22902-4596
(434)296-5832
Fax(434)972-4126 3:Jp—C&i _
Project Name: A\ m ( � ao(e h
From(Name or Firm): Ze'2(, Q nr1�rS
Date: (..D '01st Opt
(Please separate plans for review by different individuals)
❑ EROSION & SEDIMENT CONTROL PLAN or PLAN AMENDMENT
❑ First Submittal ❑ Revision ❑ Additional copies only
-narrative(2 copies) - narrative(2 copies) (usually after approval)
-plan(2 copies) - plan(2 copies)
- application and fee
❑ STREAM BUFFER MITIGATION PLAN
❑ First Submittal ❑ Revision
-plan(2 copies) - plan(2 copies)
-application and fee
❑ STORMWATER MANAGEMENTBMP PLAN
❑ Conceptual Plan ❑ First Submittal ❑ Revision
-plan(2 copies) - plan(2 copies) -plan(2 copies)
-computations;water quality -computations;water quality, -computations as revised
(2 copies) hydrology,hydraulics,map(2 copies) (2 copies)
-application and fee
❑ ROAD PLAN (PUBLIC OR PRIVATE) (all items, 2 copies for private roads, 5 copies for public)
❑ First Submittal ❑ Revision ❑ As-built
-plan -plan -plans
-pavement design sheets -pavement sheets -plats
-computations(&maps) computations
IN ITE PLAN OR AMENDMENT (First Submittals are to the Development Process Manager)
evision
-plans(3 copies,incl.retaining walls if applicable)
-computations as revised(2 copies)
❑ CERTIFIED ENGINEERS REPORT (addressing each performance criteria of the Zoning Ordinance)
❑ First Submission ❑ Revision
-letter and documentation
-plans or sketches
❑ CBR REPORTS
❑ Public Roads ❑ Private Roads
-pavement design sheets -pavement design sheets
(4 copies) (1 copy)
❑ TRAFFIC STUDIES
❑ Public Roads ❑ Private Roads
(2 copies) (1 copy)