Loading...
HomeMy WebLinkAboutSDP201000001 Checklist - Project Closeout (Administrative) 2010-02-04 SUBDIVISION/SITE PLAP FILE CLOSEOUT CHECKLIST Please complete this form and place in SDP/SUB folder. SD '. UB# .200-obi PROJECT TITLE at la;1 -Iva / - 0.w LEAD REVIEWER d1 •__ S Ani ftTS CLOSE-OUT DATE: 2. /. /0 __________ PL TS TO BE SIGNED: z_This plat is ready to be signed This plat is ready to be signed once the following conditions have been met: ❑ Owner signature ❑ Notary ❑ Surveyor's seal&signature ❑ Other ❑ Other ? O Other --------------------------------________________________________ Coun View— Application,Page 2 Data Entered 4-Staff Report, Ground Water and other documents placed in"Docs&Pics" Hardcopy—File Folder: When closing SDP/SUB files, all items should be grouped and placed in the folder based on the list below. Please check each item included in this folder. To indicate that an item is not applicable to this file, place an "N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. yilk—Engineering Folder-Information/documentation ,,,,,-Application YptifNotification records/Abutting Owner correspondence Applicant Correspondence(to/from—including emails) Complete set of printed Review Comments(ARB, Engineering,Zoning,VDOT,etc.) pproved plan/plat(Plan/Plat that is signed,or stamped"Approved"with Planner/Engineer name) Action Letter(Administrative Approval) ilk—White Envelope-PC/BOS Meeting Package- Staff Report(include plan/plat presented),Action Letter Ground Water Assessments ZZOther Items(Please explain) At the planner's discretion, copies of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and lends clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. Additional Information on this file: ♦ Planning Commission Minutes—may be obtained online or by contacting PC Recording Secretary ♦ Board of Supervisor Minutes—may be obtained online or by contacting the Clerk of BOS 4 Construction Documents—will be added to this folder after completion of project. Prior to completion documents may be obtained by contacting the County Engineer. — NOTES: Central Operations Development Intake/Support Specialist will; 1)"QC"CountyView for correct status and date—update CountyView if required,2)place a label on the outside of the folder to reflect the appropriate status and date,3)Acco-Fasten documents(not maps/plans),and 4)check the approved plan/plat item on above list if required. 0 Central Filing Intake/Support Specialist will confirm that information on this list is in the folder. If a folder does not have a completed form,or if items are missing,folders will be returned to the Lead Reviewer or the Chief of Current Development for corrections. Issued 7/7/2008 Revised 4/1/2008