HomeMy WebLinkAboutSDP202200010 Action Letter 2022-04-14Cameron Langille
Principal Planner, Planning
County of Albemarle blangille@albemarle.org
Community Development Department - Department Telephone: (434) 296-5832 ext. 3432
Memorandum
To: Scott Collins, P.E., scott@collins-engineering.com; Alan Taylor, alan@riverbenddev.com
Date: April 14, 2022
Re: SDP202200010 Brookhill Block 11) Initial Site Plan - Conditional Approval Action Letter
Dear Applicant:
The Agent for the Board of Supervisors hereby grants conditional administrative approval to the above referenced
site plan. All comments contained in the attached comment letter must be addressed prior to final site plan
approval.
This approval shall be valid for a period of five (5) years from the date of this letter, provided that the developer
submits a final site plan for all or a portion of the site within one (1) year after the date of this letter as provided in
section 32.4.3.1 of Chapter 18 of the Code of the County of Albemarle, and thereafter diligently pursues approval
of the final site plan.
In accordance with Chapter 18 Section 32.4.2.8 Early or Mass Grading may be permitted after the following
approvals are received:
1. Engineering approval of a VSMP plan meeting the requirements of Chapter 17 of the Code of the County
of Albemarle.
2. Approval of all easements for facilities for stormwater management and drainage control.
The final site plan will not be considered to have been officially submitted until the following items are received:
1. A final site plan that satisfies all of the requirements of section 32.6 of Chapter 18 of the Code.
2. Applicable fee.
Please submit 11 copies of the final plans to the Community Development Department. The assigned Lead
Reviewer will then distribute the plans to all reviewing agencies (for ACSA, please submit 3 copies of construction
plans directly to them, as stated in their comments). Once you receive the first set of comments on the final site
plan, please work with each reviewer individually to satisfy their requirements.
The Department of Community Development shall not accept submittal of the final site plan for signature until
tentative approvals for the attached conditions from the following agencies/reviewers have been obtained:
Sincerely,
Cameron Langille
Principal Planner
WWW,ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
Albemarle County Planning Services (Planner) - Cameron Langille, blangille@albemarle.org - Comments to be
addressed prior to initial site plan approval:
1. Total fees for this project are $5,501.15. The County has received payment of $5,293.80. The remaining balance
of $207.35 must be paid by Friday April 22, 2022 in order for the initial site plan to be approved. Comment
addressed. Fee submitted and received on April 14, 2022.
Comments to be addressed prior to final site plan approval:
2. [Parking reduction] A parking reduction request was received with the initial site plan submittal. Based on
comments #18-19 below, the amount of parking provided will likely need to be adjusted in order to account for
other Zoning Ordinance requirements for parking areas. The reduction request will need to be re -submitted with
the final site plan once a more finalized parking count has been determined by the applicant.
3. [Advisory Comment] The Total Project Area note on Sheet 1 states that the area of Blocks 2 and 3 are being
increased and decreased, respectively. The acreage reductions are within the 15% area adjustment allowed by the
Code of Development (COD). Blocks 2 and 3 are required to have a minimum of 37 and 34 total dwelling units,
respectively. Staff asks the applicant to keep this in mind as the acreages/layouts of Blocks 1-3 are designed
further so that adequate area is available for building streets and residential units/lots in Blocks 2 and 3.
4. [General comment] Please be sure that the table on Sheet 3 is updated with accurate figures prior to final site plan
approval of Block 1D. There are many site plans and plats under review within Brookhill, and some of those may
be approved prior to the Block 1D final site plan.
a. The map on Sheet 3 does not show the proposed phase lines of Block 1D. Please be sure that Block 1D is
shown, and the Block limits of Blocks 2, 3, and 5 are accurately depicted.
5. [ZMA201500007] Per the maps within the COD and the Application Plan, Blocks 2, 3, and 5 are located to the
east of Block 1D. The layout of streets and parking areas shown on the Block 1D site plan do not depict how
Blocks 2, 3, and 5 will be accessed. Please provide information on how the developer intends to access those
blocks for future development.
6. [ZMA201500007] The site plan for Block 113 identifies 2,650 sq. ft. of non-residential square footage being
provided in the building at the intersection of Stella Lane/Archer Avenue. The combined non-residential square
footage of Block 1C and 1D is 130,000 sq. ft. which is the maximum that can be developed in the entirety of
Brookhill. On the final site plans for each sub -block of Block 1, the square footages of non-residential uses will
need to be adjusted so that they do not exceed 130,000 total sq. ft. total in Block 1. As proposed, the non-
residential sq.ft. that counts against the maximum is 132,650 sq. ft.
7. [General Comment] The open space note on Sheet 1 states that the greenway area has already been dedicated to
the County. However, the greenway has only been subdivided and has not yet been dedicated. The instrument
number referenced in the note will need to be revised if the greenway is dedicated to the County prior to final site
plan approval.
8. [32.5.2 (a) and ZMA201500007] Please clarify the total project area note on Sheet 1 for Block 1D. The Acreage
Per Phases of the Village Center note says that Block 1D will measure 17.49 acres, but the Total Proposed Acreage
note states that all of Block 1 will only measure 13.49 acres. Please verify the accurate area of Block 1.
a. Per footnote #2 under Table 2, block areas listed in the table are exclusive of greenway areas. Please
verify what the actual proposed acreage of Block 1 and Block 1D are and update any acreage figures as
necessary.
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
9. [32.5.2 (a) and ZMA201500007] The proposed hotel is 4 stories, and the block regulations for Block 1 (page 16 of
the COD) state that buildings greater than 3 stories must step back a minimum of 15' after the third story or
provide a minimum 15' front or side setback adjacent to a street. Please either provide notes and labels identifying
how the building will meet the minimum 15' step back requirement or demonstrate how the building meets the
minimum 15' setback.
10. [32.5.2 (a)] Please revise the required open space note on Sheet 1 so that it identifies the required open space for
Block 1 alone. Currently, it states Blocks 1-3.
11. [32.5.2 (a)] Please label all setback lines on the final site plan.
12. [32.5.2 (b)] Per page 9 of the COD, 1 bicycle rack is required for every 5,000 sq. ft. of retail space. On the final site
plan, lease provide a calculation stating the amount of bicycle racks required within Block 1D, and show their
location on the plans.
13. [32.5.2 (d)] Please see Engineering comment #7 and provide an exhibit for the proposed change of Preserved
Slopes to Managed Slopes based on field run topography.
14. [32.5.2 0)] Please show all existing water, sewer and drainage facilities and easements within the property. Label
easements by type, state dimensions, and state the recorded instrument number that created the easement.
15. [32.5.2 (k)] Please show all proposed water, sewer, drainage, and stormwater easements on the final site plan and
state the easement type and width.
16. [ZMA201500007] Per Section 2.2.1(page 9) of the COD, primary entrances for buildings in Block 1 must be
located on the front or side of the buildings. Please address the following:
a. Label primary entrances on all buildings.
b. Add sidewalks connecting the primary entrances to existing and/or proposed sidewalks along Stella Lane
as necessary.
17. [32.5.2 (n)] Per Section 3.3. of the COD (page 33), the streetscape for the main street must feature furniture, such
as benches and trash receptacles. Currently, none are shown. Benches and trash receptacles should be provided
along the Stella Lane adjacent to the sidewalk on the final site plan.
18. [32.5.2 (n)] The commercial retail/restaurant parking calculations on Sheet 1 do not reflect the calculation for
either use as stated in Section 18-4.12 of the Zoning Ordinance. The amount of parking required may need to be
adjusted pending applicant response to this comment.
a. Restaurant parking requirements: 13 spaces per 1,000 square feet of gross floor area including areas for
accessory dancing
b. Retail use not otherwise identified: one space per each 100 square feet of retail sales area for the first
5,000 square feet and one space per each 200 square feet of retail sales area above 5,000 square feet. For
purposes of this paragraph, "retail sales area" shall be deemed to be: (1) 80 percent of the gross floor area;
or (2) at the request of the applicant, the actual retail sales floor area as shown on floor plans submitted by
the applicant delineating the actual retail sales area, which plans shall be binding as to the maximum retail
sales area used.
19. [32.5.2 (n)] Per Section 18-4.12.13 (c), loading space requirements are as follows: (1) one space for the first 8,000
square feet of retail gross leasable area, plus one space for each additional 20,000 square feet of retail gross leasable
area; (2) one space for the first 8,000 square feet of office space plus one space for each additional 20,000 square feet of
office space.
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
a. Four loading spaces are required to serve the 60,000 sq.ft. of office space in Block 1D.
b. Three loading spaces are required to serve the 50,000 sq.ft. of commercial retail/restaurant space shown
in Block 1D.
c. Please revise the loading space calculation on Sheet 1 so that it states how many loading spaces are
required in Block 1D.
d. Provide the amount of required loading spaces within Block 1D. Currently, there are only three loading
spaces proposed.
e. [4.12.13 (a)] Loading spaces shall be provided on the same lot with the use to which it is appurtenant and
shall be adjacent to the structure it serves. The final site plan will need to depict loading spaces adjacent to
the office and retail/restaurant buildings, not at the end of Stella Lane as currently shown.
20. [32.5.2 (n)] Please see attached comments from Inspections Division. ADA accessible access aisles and access
routes must be provided within the site.
21. [32.5.2 (n)] Please provide sidewalks around all sides of the proposed hotel.
22. [32.5.2 (n)] There is only one dumpster pad area shown within the limits of Block 1D. Although this appears to
meet the minimum Ordinance requirements, staff asks the applicant to consider providing more
dumpsters/dumpster pads since there are potentially several restaurants that could occupy the buildings in Block
1D.
a. Be sure to provide plan and profile view construction detail of the dumpster pad enclosure(s) in order to
meet the screening requirements specified by Section 18-4.12.19 (c). If landscaping will be used to screen
the dumpster pad, landscaping must meet screening requirements specified by Section 18-32.7.9.7.
23. [32.5.2 (n)] Please provide dimensions for all buildings, sidewalks, walkways, walls, etc.
a. Be sure to dimension and label the community center and pool deck. Dimensions are currently missing for
this area on Sheet 7. The outdoor deck and pool area must be a minimum of 5,000 sq.ft., per page 22 of
the COD.
24. [32.5.2 (n)] On the final site plan, please depict all proposed improvements and amenities within the 42,000 sq.ft.
recreational area behind the 10,000 sq.fL restaurant building.
a. [ZMA201500007] The recreation note on Sheet 1 lists different sq.ft. of the recreational area from the
labels on other sheets. Please be aware that the Neighborhood Amenity Center/Linear Park/Civic Space
#1 required in Block 1 must measure 50,000 sq.ft. See page 22 of the COD for exact dimensions and area
requirements for Civic Space #1.
25. [32.5.2 (r)] Please provide a legend on each drawing.
26. [32.5.2 (u)] Please see attached ARB comments. Prior to final site plan approval, a Certificate of Appropriateness
is needed. This will require building elevations for all proposed structures.
27. [32.6] Prior to approval, the final site plan must address all applicable requirements of Section 32.6 and 32.7 of the
Zoning Ordinance.
28. [32.7] Prior to final site plan approval, a road plan application must be submitted, reviewed, and approved to verify
that all proposed streets and other means of vehicular access to the site comply with all County and VDOT road
design requirements.
29. [32.7.4] Prior to final site plan approval, a Water Protection Ordinance Plan (WPO) must be submitted, reviewed,
and approved. See Engineering comments for further information.
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
30. [32.7] Prior to final site plan approval, an easement plat application must be submitted, reviewed, approved, and
recorded for all proposed easements.
a. [32.7.4.1] The easement plat must show all proposed stormwater and drainage easements. Prior to
approval of the final site plan, all stormwater and drainage easements created by the easement plat will
need to be shown, labeled, and identified as public/private, state the width/size of the easement, and state
the recorded instrument number of the plat that created the easements.
b. [32.7.5] The easement plat must show all proposed water and sewer easements. Prior to approval of the
final site plan, all water and sewer easements created by the easement plat will need to be shown, labeled,
and identified as public/private, state the width/size of the easement, and state the recorded instrument
number of the plat that created the easements.
31. [32.7.9] The final site plan will need to include a landscaping plan that meets the following requirements:
a. [32.7.9.5] Street trees along all streets. Sizes and spacing requirements must be met.
b. [32.7.9.6] Parking lot landscaping requirements.
c. [32.7.9.7] Screening for parking spaces and dumpster areas.
d. [32.7.9.8] Minimum tree canopy of 10% must be provided within the site. Provide a calculation of the tree
canopy area provided, and state the tree canopy area proposed.
e. Provide a landscape schedule identifying the following information for proposed landscaping: state the
species name, common name, quantity, size/height at time of installation, canopy area per species, and
total canopy area for each species of landscaping material provided.
f. All proposed landscaping must be tree and shrub species specified on the Albemarle County
Recommended Plants List.
g. Canopy figures for all species can be obtained from the Plant Canopy Calculations list.
32. [32.5.2 (n)] Any proposed outdoor lighting must be shown on the site plan. A photometric plan and lighting cut
sheets must be provided with the final site plan. Proposed lighting must comply with requirements of Sections
32.7.8 & Section 4.17 of the Zoning Ordinance. In addition to meeting all lighting requirements a standard lighting
note will be required.
33. [ZMA201500007 and ZMA2018000011] The greenway parcel (currently identified in County records as Tax Map
Parcel 46-19139) created through the plat recorded in DB 5512 page 282 is owned by the Brookhill HOA. Per
correspondence with the developer when that subdivision plat application (SUB202000189) was under review, the
developer was going to submit an easement plat to dedicate a public easement over the greenway at a future date.
Per the COD and proffers, a public greenway easement must be dedicated to Albemarle County over the
greenway area sometime after the 5001' certificate of occupancy is issued within Brookhill. Please provide an
update on when the developer intends to provide the easement.
Please contact Cameron Langille in the Planning Division by using blaneille@albemarle.ore or 434-296-5832 ext.3432 for
further information.
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
Comments from Other Reviewers.
Albemarle County Engineering Division - Emily Cox, ecox2@albemarle.org - Requested changes, see attached.
Albemarle County Architectural Review Board (ARB) - Margaret Maliszewski, mmaliszewski(o)albemarle.ore - See
attached recommendation.
Albemarle County E911 Services - Elise Kiewra, ekiewra@albemarle.org - Requested changes, see attached.
Albemarle County Building Inspections - Betty Slough, bslough@albemarle.org - Requested changes, see attached.
Albemarle County Department of Fire & Rescue - Howard Lagomarsino, hlagomarsino@albemarle.org - Requested
changes, see attached.
Albemarle County Service Authority (ACSA) - Richard Nelson, rnelson@serviceauthoritv.or¢ - Requested changes, see
attached.
Virginia Department of Transportation (VDOT) - Max Greene, max.greene@vdot.virginia.gov - No objection, see
attached.
Rivanna Water and Sewer Authority (RWSA) - Dyon Vega, dve¢a(@rivanna.ore - Requested changes, see attached.
Virginia Department of Health (VDH) - Alan Mazurowski, amazurowski@vdh.vireinia.gov - No objection, see attached.
WWW.ALBEMARLE.ORG
401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579
�$ County of Albemarle
m COMMUNITY DEVELOPMENT DEPARTMENT
Memorandum
To: Cameron Langille
From: Emily Cox
Date: 04/10/2022
Subject: Brookhill Block 1D Final Site Plan (SDP202200010)
401 McIntire Road, North Wing
Charlottesville, VA 22902-4579
Telephone: 434-296-5832
WWW.ALBEMARLE.ORG
The Brookhill Block 1D final Site Plan has been reviewed by Engineering. The following
comments will need to be addressed before approval:
1. WPO plan must be submitted and approved before final site plan can be
approved. Water quantity and quality was not evaluated with this plan. Sheet 9
did not appear to be updated for this project. Please remove reference to
WP0201800086. This plan was withdrawn.
2. Road plan must be submitted, approved, and built or bonded before final site plan
can be approved.
3. [Sheet 3] Please accurately show blocks. There is no block 1D shown.
4. Signed and sealed retaining walls plans will be necessary before final site plan
approval.
5. Please ensure all existing easements are labeled with the DB & PG or the
instrument number.
6. Please measure and show the stream buffer and greenway. Ensure they meet
Brookhill Code of Development and County Code requirements. Code of
development:
the community The Greenway encompasses the land within the 100 foot stream buffer along
the perennial streams and wetlands and all land located within the f oodplam. This Greenway
County code: The stream buffer shall be no less than 100 feet wide on each side
of any perennial stream and contiguous nontidal wetlands, measured
horizontally from the edge of the contiguous nontidal wetlands, or the top of
the stream bank if no wetlands exist
a. Two example locations:
7. Please provide the exhibit for the changing of preserved slopes in accordance
Engineering Review Comments
Page 2 of 2
with County Code 30.7.4.b.1.h.
8. There appears to be proposed grading in the buffer and preserved slopes. This is
not allowed per the Code of Development and County Code.
9. Ensure all proposed drainage easement widths meet the requirements in the
Design Standards Manual, page 15:
https://www.albemarle.org/Home/ShowDocument?id=270 Also, please show
proposed SWM facility easement.
10. All grading must meet county code 18.4.3.3.
11. Please provide a dumpster pad detail.
Review Comments for SDP202200010 Initial Site Plan
Project Name: BROOKHILL- BLOCK 1D - SrrE PLAN - DIGITAL
Date Completed: Friday, March 25, 2022 Department/DivisiordAgency: Review Status:
Reviewer: Margaret Maliszewski —E CDD ARB Approved
Staff recommends approval of the Initial Site Plan.
Note that a Certificate of Appropriateness is required prior to final site plan approval. Submit an application for a Countywide
Certificate of Appropriateness for buildings located 750' or more from the EC street. The following items and all items on the
submittal checklist must be addressed:
1. Provide architectural designs for the 3- and 4- story buildings with the final site plan submittal. Show how visibility of
equipment will be eliminated.
2. Add the standard equipment visibility note to the site and architectural plans.
3. Provide a complete lighting plan with the next submittal.
4. Provide a complete landscape plan with the next submittal.
5. Eliminate all tree/pipe conflicts.
6. Provide trees along pedestrian ways.
7. Provide interior and perimeter parking lot trees at the quantities and spacing required by the EC Guidelines.
Page: � County of Albemarle Printed On: 04/07/2022
�1 OF AL8
County of Albemarle
GEOGRAPHIC DATA SERVICES OFFICE
COMMUNITY DEVELOPMENT DEPARTMENT
PLAN REVIEW COMMENTS - E911
APPLICATION#: SDP202100098
TMP: 04600-00-00-018A1
MM.
4/4/22
Elise Kiewra
ekiewra@albemarle.org
tel: 434-296-5832 ext. 3030
fax: 434-972-4126
Per site plan SDP202100098 please label the blue travelway below ]ada Ln.
Please also submit a road name for the travelway in red in the screenshot below.
S/�DA LA
VWVW.ALBEMARLE.ORG
401 McIntire Road, Suite 228 1 Charlottesville, VA 22902-4596
Review Comments for SDP202200010 Initial Site Plan
Project Name: BROOKHILL- BLOCK 1D - SITE PLAN - DIGITAL
Date Completed: Monday, April 04, 2022 Department/DivisiordAgency: Review Status:
Reviewer: Betty Slough CDD Insoections Requested Changes
The Accessible parking spaces must be per the following:
1106.6 Location.
Accessible parking spaces shall be located on the shortest accessible route of travel from adjacent parking to an accessible
building entrance. In parking facilities that do not serve a particular building, accessible parking spaces shall be located on the
shortest route to an accessible pedestrian entrance to the parking facility. Where buildings have multiple accessible entrances
with adjacent parking, accessible parking spaces shall be dispersed and located near the accessible entrances.
There are about 3-4 buildings where the space locations need to be adjusted.
Pager County of Albemarle Printed On: 04/07/2022
Review Comments for SDP202200010 Initial Site Plan
Project Name: BROOKHILL- BLOCK 1D - SrrE PLAN - DIGITAL
Date Completed: Monday, April 04, 2022 Department/DivisiorvAgency: Review Status:
Reviewer: Howard Lagomarsino Fire Rescue Requested Changes
1) The plans indicate sprinkler systems are to be installed. This requires afire hydrant within 100 feet of the fire department
connections for the systems. Do not see thye locations of the FDC's indicated on the plan, so cannot evaluate if the proposed
hydrants satisfy bthis requirement, please indicate the locationn of FDC's and ensure there are hydrants within 100 feet of
them on the plans.
2) Fire hydrant spacing is based on the needed fire flow. It appears from the information provided on fire flow notes on the
plans, the spacing required will be 500 feet with no building more thanm 250 feet from a hydrant. I have concerns about
hydrant spacing as shown on the plans, though many of the buildings on the west side of the plans appear to fall within this
requirement on hydrant spacing on the east side of the plans. Please ensure the polans indicate hydrants that are appropriate
to meet the spacing requirements.
3) During construction, the following fire prevention steps are required, so please add them as a note on the plan:
a) Smoking shall be prohibited in areas where smoking makes conditions such as to make smoking a hazard and these
areas shall be designated with no smoking signs per Virginia Statewide Fire Prevention Code.
b) Areas where smoking can occur, shall have appropriate receptacles for discarded smoking materials per Virginia
Statewide Fire Prevention Code.
c) Per the Virginia Statewide Fire Prevention Code, vehicular access for firefighting shall be provided at all construction
and demolition sites, provide access to within 100 ft. of temporary or permanent fire department connections, and have no
overhead wiring or other overhead obstructions lower than 13 ft. 6 inches; this access may be via permanent or temporary
road, but shall be capable of supporting fire apparatus in all weather conditions.
d) Contractor shall ensure the street numbers are always plainly visible from the frontage street during construction per the
Virginia Statewide Fire Code
e) An approved water supply for firefighting operations shall be in place and available as soon as combustible materials
arrive on site.
f) Waste and combustible debris shall be removed from the building at the end of each day and disposed of in accordance
with the Virginia Statewide Fire Code
g) Fire extinguishers shall be provided, with not less than one approved fire extinguisher at each stairwell, on all floor levels
where combustible materials have accumulated, in every storage and construction shed and in areas of special, hazards, such
as where flammable and combustible liquids are stored or used, in accordance with the Virginia Statewide Fire Code
h) Operations involving the use of cutting and welding shall comply with the Virginia Statewide Fire Prevention Code and
shall require a permit from the Albemarle County Fire Marshal's Office
Pager County of Albemarle Printed On: 04/07/2022
Review Comments for SDP202200010 Initial Site Plan
Project Name: BROOKHILL- BLOCK I - SITE PLAN - DIGITAL
Date Completed: Wednesday, April 06, 2022 Department/DivisiordAgency: Review Status:
Reviewer: Richard Nelson ACSA See Recommendations
I recommend SDP202200010 Brookhill Block 1 D Initial Site Plan for approval with the following conditions:
Submit water and sewer utility plan to ACSAAATN: Alex Morrison.
RWSA sewer capacity certification will be required.
Block 1 B utilities to are to be constructed, tested, and accepted prior to establishing connection for 1 D.
Thanks,
Richard Nelson
Civil Engineer
Albemarle County Service Authority
168 Spotnap Road
Charlottesville, Virginia 22911
(434)977-4511
Pager County of Albemarle Printed On: 04/07/2022
(Z)
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
Stephen C. Brich, P.E. 1401 East Broad Street
Commissioner Richmond, Virginia 23219
March 10, 2022
Cameron Langille
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Re: SDP-2022-00010- Brookhill — Block 1D — Initial Site Plan
Dear Mr. Langille:
(804) 786-2701
Fax: (804) 786,2940
The Department of Transportation, Charlottesville Residency Transportation and Land Use
Section, has reviewed the above referenced Brookhill — Block 1D - ISP, as submitted by Collins
Engineering dated February 2, 2022 and find it to be generally acceptable.
A VDOT Land Use Permit will be required prior to any work within the right of way. The
owner/developer must contact the Charlottesville Residency land Use Section at (434) 422-9399
for information pertaining to this process.
If you have further questions please contact Max Greene at (434) 422-9894.
Sincerely,
John C. Wilson, P.E.
Assistant Resident Engineer
Land Use
Charlottesville Residency
VirginiaDOT.org
WE KEEP VIRGINIA MOVING
Review Comments for SDP202200010 Initial Site Plan
Project Name: BROOKHILL- BLOCK 1D - SITE PLAN - DIGITAL
Date Completed: Friday, February 25, 2022 Department/DivisiordAgency: Review Status:
Reviewer: Unassigned -E RWSA Requested Changes
RWSA has reviewed the Brookhill Block 1 D initial site plan dated 2/21/2022 by Collins Engineering and has the following
comments.
General Comments:
1. RWSA will require a sewer flow acceptance prior to final site plan approval.
The request will need to be sent to us byACSA and will include the following
• Estimated average daily dry weather sewage flow (ADDWF)
• Point of connection into RWSA system (which manhole)
• Number of units/square footage
• Estimated in-service date
Let me know if you have any questions.
Thanks,
Dyon Vega
Civil Engineer
Rivanna Water & Sewer Authority
(434) 977-2970, Ext. 170
695 Moores Creek Lane
Charlottesville, VA22902
www.rivanna.org
Pager County of Albemarle Printed On: 04/07/2022
Blue Ridge Health District
VIRGINIA DPARtMEN1 OF HEALTH
Cameron Langille, Senior Planner
Albemarle County Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: Brookhill Development, Block 1D
Initial Site Plan
SDP2022-10
Mr. Langille:
ChabMsvMa/Abernade
NeaNh Depadment
1 138 Rose 41 Dive
Chanollesvile, VA 22903
Ofte 434-972-6200 1 fax 434-972-4310
April 8, 2022
As requested, I've reviewed the subject site plan, dated 2/21/2022, for the proposed
development, referenced above. Since both water and sewer will be provided by public
utilities, and there does not appear to be any existing wells or drainfields in the area to be
developed, I have no objection to the initial site plan.
If there are any questions or you wish to discuss, please give me a call, 434-972-4306.
Sincerely,
Alan Mazurowski
Environmental Health Supervisor
Blue Ridge Health District
alan.mazurowski ,vdh.vir i� og_v