HomeMy WebLinkAboutSDP202200027 Correspondence 2022-04-18® COLLINS ENGINEERING
March 2, 2022
Cameron Langille
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: Avon Court Industrial Building— Initial site plan (SDP2021-00003)
200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902
��434.293.3719 PH 434.293.2813 FX
www.collins-eng ineeri ng.com
Thank you for your comments dated February 22, 2021 on the above referenced project. Below are our responses to the remaining
comments on the site plan.
Planning (Cameron Langille):
1. Attached is the steep slope analysis based on field run topo. Much of the existing preserved steep slopes remained preserved
steep slopes. The layout has been updated to remove the impacts of the preserved slopes in this area. The plans match the
steep slope analysis and the impacts to the preserved steeps slopes have been removed. The improvements and the grading
on the plans have been updated, and there are no proposed impacts to the preserved slopes on the property.
2. The front setbacks on the site layout have been updated to state SO' front setback, as requested.
3. Dimensions have been provided for the proposed structure.
4. The zoning note on sheet 1 has been updated to state EC instead of ARB. And the note has been updated to state this lies
within Preserved and managed slope area
5. The proposed note on sheet 1 has been updated for the primary use and stating the retail use is a subordinate use permitted by
right, as noted in the comment.
6. This comment will be addressed with the final site plan.
7. The existing conditions have been updated to identify the existing wooded areas.
8. The existing conditions have been updated to identify the existing wooded areas.
9. The effective date on the FEMA floodmap has been updated.
10. The circulation plan has been updated to ensure 20'travelway minimum around the building, allowing for 2 way traffic
circulation.
11. This comment will be addressed with the final site plan.
12. This comment will be addressed with the final site plan.
13. This comment will be addressed with the final site plan.
14. The grass overhangs have been graphically shown on the site plan.
15. This comment will be addressed with the final site plan.
16. Sidewalk connections have been added from Avon court to the parking lot and to the building.
17. The comment is acknowledged.
18. This comment is acknowledged.
19. This comment is acknowledged.
20. This comment is acknowledged
21. This comment will be addressed with the final site plan.
22. This comment will be addressed with the final site plan.
ARB:
No comments, not part of the EC overlay review
Engineering (John Anderson):
1. The effective date on the FEMA floodmap has been updated.
2. Attached is the steep slope analysis based on field run topo. Much of the existing preserved steep slopes remained
preserved steep slopes. The layout has been updated to remove the impacts of the preserved slopes in this area. The
plans match the steep slope analysis and the impacts to the preserved steeps slopes have been removed. The
improvements and the grading on the plans have been updated, and there are no proposed impacts to the preserved
slopes on the property.
3. Portions of comment #3 have been addressed, such as ensuring a 20' drive aisle around the building. The remaining
portions of this comment will be addressed with the final site plan.
4. This comment will be addressed with the final site plan.
5. This comment will be addressed with the final site plan.
6. This comment will be addressed with the final site plan.
7. This comment will be addressed with the final site plan.
8. This comment will be addressed with the final site plan.
9. This comment will be addressed with the final site plan.
10. This comment will be addressed with the final site plan.
11. This comment will be addressed with the final site plan.
12. This comment will be addressed with the final site plan.
13. This comment will be addressed with the final site plan.
14. This comment will be addressed with the final site plan.
15. This comment will be addressed with the final site plan.
16. This comment will be addressed with the final site plan.
17. VDOT details are no longer allowed to be included on plan sets, per VDOT and copyright requirements.
E911:
No comments
Building Inspections:
The note has been added to the cover sheet
Fire/Rescue:
These comments will be addressed with the final site plan
ACSA:
These comments will be addressed with the final site plan
VDOT:
These comments will be addressed with the final site plan
RWSA:
These comments will be addressed with the final site plan
Should you have any questions, please feel free to contact Scott Collins at scott@collins-engineering.com
Sincerely,
Scott Collins, PE