Loading...
HomeMy WebLinkAboutSDP202100030 Correspondence 2022-04-18 (3)PAGE 1 OF 3 VIRGINIA DEPARTMENT OF TRANSPORTATION CODES: COMMENT CATEGORIES: PROJECT REVIEW A. AACCEPT COMMENT —WILL BE 1. REQUIREMENT COMMENT AND RESOLUTION SHEET CORRECTED, ADDED, OR CLARIFIED. B. DESIGNER WILL EVALUATE. 2 RECOMMENDATION C. DELETE COMMENT 3. CLARIFICATION D. DEPARTMENT TO EVALUATE. VDOT PROJECT NUMBER: N/A UPC NUMBER: N/A REVIEWER(S): MICHAEL A. JACOBS, P.E. DATE: 8/3/2021 DESCRIPTION: SCOTT'S Ivy EXXON REVIEW PHASE & TYPE: DESIGN DISCIPLINE: LOCATION & DESIGN CRM(4): (IF REQUIRED) WAIVER REQUEST ITEM DWG. COMMENTS COMMENT CODE(2) RESPONSE(2) DATE: XX/XX/XXXX FINAL DISPOSITION(3) No. No.0) CATEGORY The LD-448 should be addressed to Michael A. 1 LD-448 Jacobs, P.E., District Location and Design 1 En ineer 2 LD-448 The Minimum VDOT GS Standard is GS-6 1 The Minimum VDOT Standard is "Left turn lanes 3 LD 448 required when warrants are met" 1 The VDOT Reference location is "RDM 4 LD-448 Appendix F, pages F-65 thru F-80" 1 j LD-448 The Design Speed is 35 mph 1 Please provide crash history for the past 3 6 1 ears. (1) Indicate drawing no./page no. or use "G' for general comment. Note: This form is to be used by the Project Development Team to provide comments or concerns (2) To be filled out by Project Manager in conjunction w/ Designer. Date of Response is required. associated with the design at the major design phases or when requested by the project (3) To be determined in comment resolution meeting/discussion. Final disposition is required for all re- manager. Comments shall be provided to the PM prior to the Project Meeting and the submittals. The Project Manager is responsible for the final disposition of all comments. actual meeting time will be used to discuss/ resolve any outstanding issues or conflicting (4) Comment Resolution Meeting Date if applicable. comments. REVIBEO DECEMBER, 2012 PAGE 2 OF 3 VIRGINIA DEPARTMENT OF TRANSPORTATION CODES: PROJECT REVIEW A. AACCEPT COMMENT —WILL BE COMMENT CATEGORIES: 1. REQUIREMENT COMMENT AND RESOLUTION SHEET CORRECTED, ADDED, OR CLARIFIED. B. DESIGNER WILL EVALUATE. 2 RECOMMENDATION C. DELETE COMMENT 3. CLARIFICATION D. DEPARTMENT TO EVALUATE. VDOT PROJECT NUMBER: N/A UPC NUMBER: N/A REVIEWER(S): MICHAEL A. JACOBS, P.E. DATE: 8/3/2021 DESCRIPTION: SCOTT'S Ivy EXXON REVIEW PHASE & TYPE: DESIGN DISCIPLINE: LOCATION & DESIGN CRM(4): (IF REQUIRED) WAIVER REQUEST ITEM No. DWG. No.0) COMMENTS COMMENT CATEGORY CODE(2) RESPONSE(2) DATE: XX/XX/XXXX FINAL DISPOSITION(3) Please provide an itemized cost estimate to support the statement that the cost to meet the standard is $2.5M. The itemized estimate should be based on a more detailed drawing that shows the limits of pavement widening and 7 other improvements (e.g. guardrail, drainage 1 structures, etc.) that would be needed to install a left turn lane. The plan should also show the limits of the existing VDOT right of way along the south side of US 250 and any existing utilities that would have to be relocated. 8 Please provide any mitigation that will be 1 provided to further support or justify the request. Please provide a drawing showing the intersection sight distance sight triangles in plan 9 view and confirm that intersection sight distance 1 will not be obstructed by existing guardrail or proposed landsca in . (1) Indicate drawing no./page no. or use "G' for general comment. Note: This form is to be used by the Project Development Team to provide comments or concerns (2) To be filled out by Project Manager in conjunction w/ Designer. Date of Response is required. associated with the design at the major design phases or when requested by the project (3) To be determined in comment resolution meeting/discussion. Final disposition is required for all re- manager. Comments shall be provided to the PM prior to the Project Meeting and the submittals. The Project Manager is responsible for the final disposition of all comments. actual meeting time will be used to discuss/ resolve any outstanding issues or conflicting (4) Comment Resolution Meeting Date if applicable. comments. REVIBEO DECEMBER, 2012 PAGE 3 OF 3 VIRGINIA DEPARTMENT OF TRANSPORTATION CODES: PROJECT REVIEW A. AACCEPT COMMENT —WILL BE COMMENT CATEGORIES: 1. REQUIREMENT COMMENT AND RESOLUTION SHEET CORRECTED, ADDED, OR CLARIFIED. B. DESIGNER WILL EVALUATE. 2 RECOMMENDATION C. DELETE COMMENT 3. CLARIFICATION D. DEPARTMENT TO EVALUATE. VDOT PROJECT NUMBER: N/A UPC NUMBER: N/A REVIEWER(S): MICHAEL A. JACOBS, P.E. DATE: 8/3/2021 DESCRIPTION: SCOTT'S Ivy EXXON REVIEW PHASE & TYPE: DESIGN DISCIPLINE: LOCATION & DESIGN CRM(4): (IF REQUIRED) WAIVER REQUEST ITEM No. DWG. No.0) COMMENTS COMMENT CATEGORY CODE(2) RESPONSE(2) DATE: XX/XX/XXXX FINAL DISPOSITION(3) The proposed one-way entrance on the west side of the site is shown to be 28 ft. wide but page F-103 of the VDOT Road Design Manual (Appendix F) states that the maximum width is 10 20 feet for a one-way drive. A Design Waiver 1 will be required if this one-way entrance is wider than 20 ft. Please review and revise as appropriate. The proposed two-way entrance on the east side of the site is shown to be 43 ft. wide but page F-103 of the VDOT Road Design Manual (Appendix F) states that the maximum width is 11 40 feet for a two-way drive. A Design Waiver will 1 be required if this two-way entrance is wider than 40 ft. Please review and revise as appropriate. (1) Indicate drawing no./page no. or use "G' for general comment. Note: This form is to be used by the Project Development Team to provide comments or concerns (2) To be filled out by Project Manager in conjunction w/ Designer. Date of Response is required. associated with the design at the major design phases or when requested by the project (3) To be determined in comment resolution meeting/discussion. Final disposition is required for all re- manager. Comments shall be provided to the PM prior to the Project Meeting and the submittals. The Project Manager is responsible for the final disposition of all comments. actual meeting time will be used to discuss/ resolve any outstanding issues or conflicting (4) Comment Resolution Meeting Date if applicable. comments. REVIBEO DECEMBER, 2012