HomeMy WebLinkAboutWPO201800027-64655-Full Inspection ReportV
NOTICE TO COMPLY
Hand delivered
Project: WP0201800027
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
MARTHA JEFFERSON HOSPITAL APARTMENTS - VSMP
Operator/Contractor: Breeden Construction, LLC
MARTHA JEFFERSON HOSPITAL ATTN: TAX DEPARTMENT
Issued Date: 4/21 /2022
Under section § 17-900 of the Albemarle County Code, this is your NOTICE TO COMPLY with
the requirements of the Land Disturbance Permit (or Agreement in Lieu of a Plan) for the
referenced project and to immediately take corrective measures to address erosion and sediment
control deficiencies on this property. This Notice to Comply is being issued because of the
following deficiencies:
Deficiency: Need to stablize all slopes with seed and straw mat
Corrective Action:
Deficiency: All denuded areas must be covered in a vegetative ground cover to inhibit erosion
Corrective Action:
Deficiency: Any stockpiles must be covered with stabilizing cover
Corrective Action:
Deficiency: Basins and diversions need to be reestablished with ground cover
Corrective Action:
Deficiency: Perimeter controls need maintenance
Corrective Action:
Deficiency: Confirm all structures are correct
Corrective Action:
Deficiency: Stablize all slopes
Corrective Action:
Deficiency: Multiple inlets needing replacement or repair
Corrective Action:
Deficiency: Stablize all with seed and straw mat
Corrective Action:
Deficiency: At time of visit signs of sediment leaving containment, internal roads heavily coated
with mud and no wash rack being used
Corrective Action:
Deficiency: As site presented at time of visit site is a high risk to downstream property and
waterways
Corrective Action:
Deficiency: Perimeter controls need maintenance, large areas of denuded land not protected
Corrective Action:
No actively used cleanout for this observed
Corrective Action:
Deficiency: No wash facility present or in use
Corrective Action:
Deficiency: Only cleanout found needs repair. Actively pouring and forming concrete
Corrective Action:
Deficiency: Loose construction debris all over the site. Trash containers not protected from
adverse weather
Corrective Action:
Unless subsequently amended in writing by this office, it is expected all of these corrective
measures will be completed by.
Reinspections as a result of this notice to verify corrective measures will incur a $170 fee for the first
reinspection and $270 for each subsequent reinspection for single-family dwelling units (§ 17-207).
Reinspections as a result of this notice to verify corrective measures will incur a $283 fee for the first
reinspection and $383 for each subsequent reinspection for VESCP and VSMP permits (§ 17-207 and
§ 17-208). Failure to take effective corrective measures will result in a Stop Work Order upon
reinspection. A 4% technology fee is due with each payment.
County Inspector Name: Geoff Elsie
County Inspector Phone Number: (434) 296-5832
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902-4596
Phone (434) 296-5832 Fax (434) 972-4126
VSMP/VESCP PERMIT SITE INSPECTION REPORT
Project Name:
MARTHA JEFFERSON HOSPITAL
project/WPO Number:
WP0201800027
APARTMENTS -VSMP
Project Address:
cprojectAddress»
DEQ Permit Number (if
applicable):
VAR100263
Project Operator:
Breeden Construction, LLC
Operator Telephone #:
(804) 364-4600
Project Contact:
MARTHA JEFFERSON HOSPITAL
Contact Telephone #:
ATTN: TAX DEPARTMENT
Contact E-Mail:
Qualified Personnel (QP):
Delton Banton
Inspector:
Geoff Elsie
Qualified Personnel (QP)
Email:
ccqualifiedPersonnelEmail»
Disturbed Acreage:
Weather (Wet/Dry/Rain):
Single -Family:
Inspection Date & Time:
4/21/2022
Stage of Construction: Grading
Re -Inspection: No
COVERAGE & POSTING REQUIREMENTS
Compliant?
Reviewed during re -inspection? No
Comments/Description
1
Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A)
(9VAC25-870-31 0)(Al b. Co. Code §17-300, 17-302)
2
A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3
applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 & 3)
SWPPP AVAILABILITY AND CONTENTS
Compliant? Reviewed during re -inspection? No
Comments/Description
4
The SWPPP is on -site or made available during the inspection? (CGP
Part II D.1 & 2)(9VAC25-870-54.G)
5
The SWPPP contains a signed copy of the registration statement?
(CGP Part II A.1.a)
6
The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.1.b & c)
The SWPPP includes a narrative description of the nature of the
7
construction activity, including the function of the project? (CGP Part II
A.1.d)
The SWPPP includes a legible site plan identifying all appropriate
8
measures and that includes the locations of support activities and the
onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7))
Page 1 of 6
9
The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel" conducting inspections? (CGP Part II A.6)
10
The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.B)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11
existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ II.0 ❑
12
The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of
13
concern, exceptional waters and the additional controls measures
applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b))
14
Delegation of Authority is provided and signed in accordance with Part III
K? (CGP Part 11 A.7)
15
The SWPPP is signed and dated in accordance with Part III K? (CGP Part
11 A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES
Compliant?
Reviewed during inspection? No
Comments/Description
Is the SWPPP being amended whenever there is a change in the design,
16
construction, operation, or maintenance that has a significant effect on the
discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870-
54.G)
Has the SWPPP been amended if inspections or investigations by the
17
operator's qualified personnel, or by local, state or federal officials find that
existing control measures are ineffective in minimizing pollutants in
discharges? (CGP Part II B(2))(9VAC25-870-54.G)
18
Contractor(s) that will implement and maintain each control measure are
identified? (CGP Part 11 B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19
grading activities occur, construction activities temporarily or permanently
cease on a portion of the site or stabilization measures are initiated? (CGP
Part 11 B.4(a))(9VAC25-870-54.G)
20
Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part 11 B.4(b))(9VAC25-870-54.G)
21
Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22
legal control of the operator and the dates on which the operator no longer
had legal control over each property? (CGP Part II B.4(d))(9VAC25-870-
54.G)
Does the SWPPP identify the date of any prohibited discharges, the
23
volume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part 11 B.4(e-f)) (9VAC25-870-54.G)
24
mendments, modifications, or updates to the SWPPP are signed in
accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS
Compliant?
Reviewed during inspection? No
Comments/Description
Inspections required by the SWPPP are conducted at the required
25
frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26
Inspection reports are completed and signed in accordance with CGP
Part 11 F (3-4)? (CGP Part 11 F (3-4))
Page 2 of 6
27
Corrective actions are taken consistent with the requirements of the
CGP? (CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? Yes
Comments/Description
28
Have stream buffers and steep slopes been protected as shown on the
No
Need to stablize all slopes with seed and straw mat
plan?
Sequencing of the project is implemented in accordance with the
Need stabilizing, wash rack, basins installed properly,
29
approved erosion and sediment control plan and stormwater management
O
No
perimeter controls maintained.
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization
All denuded areas must be covered in a vegetative
been stabilized, and have stabilization requirements for impaired waters,
ground cover to inhibit erosion
30
approved TMDL(s), pollutants of concern and exceptional waters, when
No
applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25-
880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected
NOAny
stockpiles must be covered with stabilizing cover
31
with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II
A.2(c)) (9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform,
NIA
32
mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land
NO
Perimeter controls need maintenance, large areas of
33
disturbance activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP II
denuded land not protected
E(1-2)) (9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
No
Basins and diversions need to be reestablished with
34
(9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
ground cover
54.6)
Are sediment traps and basins installed in accordance with MS-6 and the
NO
Confirm all structures are correct
35
approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct
No
Stablize all slopes
36
excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1-
2)) (9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate
N/A
37
permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II
A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B)
Is adequate drainage or other protection provided for water seeps?
N/A
38
(9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Do all operational storm sewer inlets have adequate inlet protection?
No
Multiple inlets needing replacement or repair
39
(9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-
54.13)
Are stormwater conveyance channels adequately stabilized with channel
N/A
Stablize all with seed and straw mat
40
lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in -stream construction conducted using measures to minimize channel
N/A
41
damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are temporary stream crossings of non -erodible material installed where
N/A
42
applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
43
Is necessary restabilization of in -stream construction complete? (9VAC
N/A
25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B)
Are utility trench operations conducted and stabilized in accordance with
N/A
44
MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are soil and mud kept off paved or public roads to minimize the transport
t time of visit signs of sediment leaving containment,
45
of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))
No
internal roads heavily coated with mud and no wash
(9VAC25-870-54.B)
rack being used
Page 3 of 6
Have all temporary control structures that are no longer needed been
46
removed and disturbed soil resulting from their removal permanently
N/A
stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54. B )
Are properties and waterways downstream from development adequately
As site presented at time of visit site is a high risk to
47
protected from erosion, sediment and damage in accordance with the
No
downstream property and waterways
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48
Permanent control measures included in the SWPPP are in place?
N/A
(9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION
Compliant?
Reviewed during inspection? Yes
Comments/Description
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i) procedures for expeditiously stopping, containing,
N/A
49
and cleaning up spills, leaks, and other releases; and (ii) procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
N/A
50
and chemicals from vehicle fueling and maintenance activities? (CGP Part II
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
No actively used cleanout for this observed
51
detergents, and wash water from construction materials, including the
No
clean-up of stucco, paint, form release oils, and curing compounds? (CGP
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
No
No wash facility present or in use
52
and equipment washing, wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53
Concrete wash water is directed into a leak -proof container or leak -proof
No
Only cleanout found needs repair. Actively pouring
and forming concrete
settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
No
Loose construction debris all over the site. Trash
54
storage, handling, and disposal of construction products, materials, and
containers not protected from adverse weather
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
yes
55
petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
N/A
56
pollutant -generating activities not addressed above, when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Page 4 of 6
Notes:
CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT
REQUEST FOR CORRECTIVE ACTION
Project Name: Permit Number (if applicable): Date:
Regulatory
Occurrence
Observation/Recommended Corrective Action
Checklist #
Citation/Legal
requirement'
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
Observation:
Recommended Corrective Action:
1 Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and
Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for
Discharges of Stormwater from Construction Activities (9VAC25-880).
Page 5 of 6
Corrective Action Deadline:
Re -Inspection Date:
Comments:
The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently
constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for
ensuring compliance on the above project.
Page 6 of 6
Construction General Permit Site Inspection Report
Request for Correction Action
Check
Regulatory Citation/Legal
Occur.
Observation
Recommended Corrective
List #
Requirement*
Action
28
Need to stablize all slopes
with seed and straw mat
30
(9VAC 25-840-40.1)
All denuded areas must be
(9VAC25-870-54.B)
covered in a vegetative
(9VAC25-880-60) (CGP
ground cover to inhibit erosion
Part I F.1(a)) (CGP Part
11 A.5.b(1)) (CGP Part 11
A.2.c (8)) (CGP 11 E(1-2))
31
(9VAC 25-840-40.2)
Any stockpiles must be
(CGP Part 11 A.2(c))
covered with stabilizing cover
(9VAC25-870-54.B)
34
(9VAC 25-840-40.5)
Basins and diversions need to
(CGP Part 11 A.2(c))
be reestablished with ground
(CGP 11 E(1-2))
cover
(9VAC25-870-54.B)
33
(9VAC 25-840-40.4)
Perimeter controls need
(CGP Part 11 A.2(c))
maintenance
(CGP 11 E(1-2))
(9VAC25-870-54. B )
35
(9VAC 25-840-40.6)
Confirm all structures are
(CGP Part 11 A.2.c (9))
correct
(CGP Part 11 A.2(c))
(CGP 11 E(1-2))
(9VAC25-870-54.B)
36
(9VAC 25-840-40.7)
Stablize all slopes
(CGP Part 11 A.2(c))
(CGP 11 E(1-2))
(9VAC25-870-54.B)
39
(9VAC 25-840-40.10)
Multiple inlets needing
(CGP Part 11 A.2(c))
replacement or repair
(CGP 11 E(1-2))
(9VAC25-870-54.B)
40
(9VAC 25-840-40.11)
Stablize all with seed and
(CGP Part 11 A.2(c))
straw mat
(CGP 11 E(1-2))
(9VAC25-870-54.B)
45
(9VAC 25-840-40.17)
At time of visit signs of
(CGP Part 11 A.2(c))
sediment leaving
(CGP 11 E(1-2))
containment, internal roads
(9VAC25-870-54.B)
heavily coated with mud and
no wash rack being used
47
(9VAC 25-840-40.19(a-
As site presented at time of
n))
visit site is a high risk to
downstream property and
waterways
33
(9VAC 25-840-40.4)
Perimeter controls need
(CGP Part II A.2(c))
maintenance, large areas of
(CGP II E(1-2))
denuded land not protected
(9VAC25-870-54.B)
51
(CGP Part II A.4.e(3))
No actively used cleanout for
(9VAC25-870-56)
this observed
52
(CGP Part II A.4.e(4))
No wash facility present or in
(9VAC25-870-56)
use
53
(CGP Part II A.4.e(5))
Only cleanout found needs
(9VAC25-870-56)
repair. Actively pouring and
forming concrete
54
(CGP Part II A.4.e(6))
Loose construction debris all
(9VAC25-870-56)
over the site. Trash containers
not protected from adverse
weather
Recommended 5/4/2022
Corrective Action
Deadline:
Targeted Re- 5/6/2022
Inspection Date:
Comments: Site in general needs serious attention to the Pollution prevention plan and the
erosion and sediment control plan. Multiple incidents of pollution and erosion non
conformance.
*Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control
Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from
Construction Activities (9VAC25-880).
Construction General Permit Site Inspection Photo Log
Photos for Item 2
Photos for Item 4
Photo Description:
Photos for Item 10
Photo Description:
Photos for Item 30
Ti mePhoto_20220421 _115354.jpg.j pg
783.84KB
Photo Description: Example of area in need of stablizing
Photos for Item 33
Time P hoto20220421_114859.jpg.j pg 702.66KB
Photo Description: Example of failed maintenance of perimeter controls
TimePhoto_20220421_114928.jpg.jpg 744.27KB
Photo Description: Example of reseeding and siltfence needed
Photos for Item 34
Ti mePhoto_20220421 _115306.jpg.j pg 388.94KB
w
.Y
Photo Description: Example of Basin needing stabilizing
Photos for Item 35
Time P hoto20220421_115306.jpg.j pg 388.94KB
Photo Description: Dewatering device correct? Open orifice with dewatering saddle installed.
Photos for Item 39
Ti mePhoto_20220421 _114731.jpg.j pg 297.98KB
Photo Description: Example of inlet needing maintenance
Ti mePhoto_20220421 _115248.jpg.j pg 874.76KB
Photo Description: Is this a structure that was to be protected?
Photos for Item 45
TimePhoto_20220421 _114719.jpg.jpg
,E
v
i
k 7 peke TMk
Try ko ,TV e 'f
502.18KB
�r11lJx ��`1ilj
9k�O R
Photo Description: Example of current internal road conditions
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902
434 296-5832
Inspection Date: 4/21/2022
County Inspector