HomeMy WebLinkAboutARB202200008 Correspondence 2022-04-21 (2)BOHLERI County of Albemarle Community Development Department - Planning 401 McIntire Rd, North Wing Charlottesville, VA 22902 Attn: Khris Taggart Dear Mr. Taggart: 9100 Arboretum Parkway, Suite 360 Richmond, VA 23236 804.893.8200 April 20, 2022 Via Electronic Mail Re: ARB2022-08 ARB Final Site Plan 1s' Review Response RST Residences Multi -Family Residential Development Seminole Trail & Ashwood Blvd Charlottesville, VA 22911 Albemarle County BE # V192076 Bohler is pleased to submit on behalf of RST Development, LLC the revised ARB Final Site Plan Review 2nd Submission for the Multi -Family Residential Development in Charlottesville, Virginia. The following is our comment response letter addressing comments received from Community Development Department. Each comment is addressed and responded to as follows: Comment 1: Consider a more muted color substitute for the white fiber cement. Response 1: Updated colors will be provided separately. Comment 2: Revise the building elevation drawings to include a material and color schedule that is keyed to the sample board. Provide accurate material/color notations along the building elevations. Response 2: Updated elevations will be provided separately. Comment 3: Revise the lighting plan to eliminate spillover in excess of .5fc. Response 3: Lighting plan has been revised to eliminate spillover in excess of 0.5fc. Comment 4: Revise the lighting plan to include details on wall light fixture type and style. Response 4: Wall lighting details have been added to sheet C-714. Comment 5: Revise the lighting plan to indicate that the plan was calculated using an LLF of 1.0 for all fixtures and revise the photometrics accordingly. Response 5: The light loss factor has been updated to 1.0 as shown in the luminaire schedule on sheets C-710 — C-713. w . BohlerEngineering.com Khris Taggart BOHLER ARB Final Site Plan 151 Review Response April 20, 2022 Page 2 of 3 Comment 6: Revise the color temperature of the proposed lighting to indicate a warm white light with a temperature in the range of 2000K-3000K. Response 6: The notes on sheets C-710 — C-713 were updated to note all fixtures are 3000K. Comment 7: Revise the luminaire schedule to indicate the color of the pole -mounted fixtures. Response 7: The luminaire schedule has been updated to include the pole color on sheets C-710 — C-713. Comment 8: Revise the plan to indicate the fixture heights will not exceed 20' including the base. Response 8: Note 1 on sheets C-710 — C-713 was updated for clarity on the height. Comment 9: Revise the lighting plan to include fixture locations and illumination values for the wall -mounted lights. Response 9: Wall- mounted lights are now shown on the plans. These were not included in the calculations for the illumination values because they do not emit enough light to be modeled. Note 6 was added to sheets C-710 — C-713. Comment 10: Provide the frontage street trees at 3'/2" caliper. Response 10:The trees proposed along the street frontage, Seminole Trail Rte-29 and Ashwood Blvd Rte-1670, have been upsized to be 3 '/2" caliper as requested. See the Offsite Landscape Schedule on the Overall Landscape Plan, sheet C- 703. Comment 11: Planting size of the exterior and interior parking lot trees may be 1 ''/2" caliper. Response 11:The exterior and interior parking lot trees are proposed at 1 %" caliper. See the Landscape Schedules on the various Landscape Plan sheets, C-703 — C- 707. Comment 12: Revise the landscape plan to show shrubs, 24" at time of planting, along the south and west sides of the large parking lot. Response 12: A row of 24" tall shrubs has been added along the Western and Southern edges of the large parking lot. The Landscape Schedules and Tree Canopy Compliance charts have been revised accordingly. See the Landscape Plan on sheet C-705 and the Landscape Compliance on sheet C-707. Comment 13: Revise the landscape plan to show shrubs, 24" at time of planting, along the west side of the dumpster enclosure. Response 13: A row of 24" tall shrubs has been added along the Western side of the trash enclosure near the large parking lot. The Landscape Schedules and Tree Canopy Compliance charts have been revised accordingly. See the Landscape Plan on sheet C-705 and the Landscape Compliance on sheet C- 707. Comment 14: Show tree protection fencing on, and coordinated throughout, the grading, landscaping, and erosion and sediment control plans. Response 14:Tree protection fencing is now shown on grading, landscaping, and erosion plans. w . BohlerEngineering.com Khris Taggart BOHLERI ARB Final Site Plan 1st Review Response April 20, 2022 Page 3 of 3 Should you have any questions regarding this project or require additional information, please do not hesitate to contact me at (804) 893-8200. Sincerely, Bohler Engineering VA, LLC LZMk Ryan Yauger, P.E. RY/je H:\19\V192076\Administrative\Letters\ARB\220420 RST ARB 2nd Review Response CRL.doc www. BohlerEng i neering. corn