HomeMy WebLinkAboutSDP201700070 Correspondence Final Site Plan and Comps. 2018-11-07 COUNTY OF ALBEMARLE
ALk4, Department Community Development
$'1®_• Planning Services Division
,��. 401 McIntire Road North Wing• Charlottesville, Virginia 22902-4596
Phone: (434)296-5823 • Fax: (434)972-4035
Transmittal
From: Paty Saternye Date: 11/7/18
To: ORichard Nelson-ACSA 0
OMargaret Maliszewski - ARB 0
0E rPeh1-Eng .ZVkr. Aryvied see. 0
ORebecca Ragsdale-Zoning 0
0 0
JOB #/FILE NAME:SDP-2017-70 HTC Hotel- Comfort Inn - Final Site Plan •
We are sending you the following items: ® Attached or ❑ Under separate cover
® Copy of Letter ❑ Prints ® Plans
❑ Plats ❑ Specifications ❑ Other
#of Date Description
Copies
1 11/1/18 Final Site Plan - HTC Hotel
1 11/1/18 (If applicable) Comment response letter (if one was sent specifically for
your review)
These are transmitted as checked below:
® For review and comments ® For approval ❑ Other
Remarks: For your review comments or approval. THANKS :)
Comments are due in City View or email by: 11/20/18 Signature: Paty Saternye
II .,IF: PROJECTL,,, AGEMENT
CIVIL ENGINEERING
LAND PLANNING
ENGINEERINGa
November 6th, 2018
'sty Saternye
Senior Planner
Albemarle County
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: SDP 201700070 HTC Hotel —Comfort Inn— Final Site Plan
Dear Ms. Saternye,
Please find attached three (3) copies of the Final Site Plan for the HTC Hotel, per your request.
If you have any questions please feel free to contact me via e-mail at Michael@shimp-engineering.com or
Justin Shimp at Justin@shimp-engineering.com or by telephone at 434-227-5140.
Sincere) ,
Michael Chandler
Shimp Engineering, P.C.
n
Z
-0 c ran
m o
PROJECT GEMENT
sHimp CIVIL ENGINEERING
LAND PLANNING
ENGINEERING )
November 5th, 2018
PPaty Satemye r
Senior Planner
Albemarle County
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: SDP 201700070 HTC Hotel—Comfort Inn—Final Site Plan
Dear Ms. Saternye,
Please find attached four(4) copies of the Final Site Plan for the HTC Hotel project along with our responses to
County Planning, Zoning and Engineering comments.
If you have any questions please feel free to contact me via e-mail at Michael@shimp-engineering.com or
Justin Shimp at Justin@shimp-engineering.com or by telephone at 434-227-5140.
Sincerely,
Michael Chandler
Shimp Engineering, P.C.
•
PROJECT MANAGEMENT
SHIMP CIVIL ENGINEERING
LAND PLANNING
ENGINEERING
)
November 1st, 2018
Paty Saternye,
County of Albemarle
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, VA 22902
Regarding: SDP 201700070 HTC Hotel—Comfort Inn—Final Site Plan
Dear Ms. Saternye,
Thank you for your ARB review of the final site plan for HTC Hotel. We have reviewed and revised the plan
per your most recent comments dated August 3, 2018. See below for detailed responses to each of your comments. Comment
response has been shortened by removing addressed comments for your convenience.
2. A site plan meeting all the requirements of section 32.6 of Chapter 18 of the Code.
FINAL. Comment not fully addressed. See comments below.
Acknowledged
3. A site plan meeting all the requirements of ZMA 2001-20, its Application Plan, its Code of Development(C.O.D), and
SP2003-30.
FINAL. Comment not fully addressed See comments below
Acknowledged
7. [32 5 2(b)]
FINAL: Comment not fully addressed. See Zoning comment#1.
II. If the required amount of parking is not to be provided submit the appropriate request and justification for the parking
reduction.
Rev. 1: Comment not fully addressed.A request for reduced parking was submitted and was received by zoning.
Insufficient information was provided. See the attached zoning comments.
Rev.2: Comment not fully addressed. See zoning comments and address this comment.
-Parking has been added to the site plan for a total of 81 spaces for 81 hotel rooms. No reduction
request is proposed at this point.
Page 1 of 5
III. If parking is to remain on adjoining parcel address issue specified above about the wording of Article VI of the
declaration previously recorded.
Rev. 1: Comment not fully addressed. Portions of two parking spaces still reside on the adjoining parcel. Fully
address the comment stated above. Also, address Article VI of the declaration previously recorded if a shared
parking agreement is requested rather than reduced parking.
Rev.2: Comment not fully addressed.Article VI Construction, Section 6.06 states all parking(as specified in
that article)must be met within the parcel. Address this comment.
-Parking spaces are no longer proposed within the adjoining parcel
IV. If a Boundary Line Adjustment(BLA)will be done in order to address this offsite parking and declaration issues show
this in the site plan If this is to be done a BLA Plat will be required under a separate submission and with appropriate
fees.
Rev. 1: Comment not fully addressed. Since portions of two parking spaces still reside on the adjoining parcel this
comment remains until the issue is resolved. Fully address the comment stated above.
Rev.2: Comment not fully addressed.
-Parking spaces are no longer proposed within the adjoining parcel.
8. [32.5.2(b), 32.5.2(e), 32.5 2(p), 32 6 20)&32 7 9] Provide a full landscape plan that provides all required landscaping,
calculations and meets the buffer& landscaping requirements for 32.7.9 and the ZMA Code of Development Also, address
the following.
b) See ARB comments on landscaping to meet Entrance Corridor requirements.
FINAL. Comment not fully addressed ARB comments will be provided after the 2/12/18 ARB meeting where it will be
reviewed.
Rev. 1: Comment not fully addressed. ARB comments were provided on 5/30/18 and have been attached to these
comments.
Rev.2: Comment not fully addressed. See attached ARB comments from 8/3/18.
-ARB comment response and exhibits have been submitted separately.
10. [32.5.2(i), (n), 32.6.2(f), &(k)]
FINAL. Comment not fully addressed. Address the following.
a) Show the outdoor lighting fixtures on the Utility Plan sheet Ensure that the location of lighting fixtures within existing
and proposed easements will be allowed
Rev. 1: Comment not fully addressed. Easements will be required for the light, and the electrical line going to the
light,since it is on an adjoining property. Provide an easement plat and deeds of easement and maintenance
agreements that will be required for the light fixture to be on the adjoining lot. The plat, deed and any legal
agreements must be reviewed,approved, signed and recorded prior to the final site plan approval.
Rev.2: Comment not addressed. Although an easement plat was submitted it was only for the ACSA utilities
and not for any of the easements that will be required on the adjoining lot.
-Easement Plat that includes all required easements has been submitted for approval.
b) Show the existing access easements, found in DB 2678 PG 425 and D82916 PG 22, on the site plan or provide
documentation specifying that they have been removed There is a"30'Access Easement"and variable width "Cross-
Page 2 of 5
Access Easement"shown on the plats. Also, the 70' Cross-Access Easement could conflict with the building location
and must be addressed
Rev. 1: Comment not fully addressed. DB 2678 PG 425-436 has been submitted to the County Attorney's office for
their review. The language at the bottom of page 1 states"... a perceptual, Easement"which appears to include the
"Drive Lane Construction and Cross-Access Easement"area shown on the plat. This existing easement may conflict
with the building location. If it does the easement or the building location may need to be revised. It is acknowledged
that the"Building Restriction Area" is not the full width of the"Cross-Access Easement". Therefore, legal
interpretation is required.
Rev.2: Comment not addressed.Address this comment. IMPORTANT: The County Attorney's office has
stated that the language at the bottom of page 1 states "...a perpetual, non-exclusive easement and right-of-
way for vehicular ingress and egress..."for the"Access Easement"appears to include the"Drive Lane
Construction and Cross-Access Easement"area shown on the plat.Therefore,this existing easement
conflicts with the building location. Either revise the easement or revise the building location.
-The owner's attorney has reviewed the language of the easement,and the Drive Lane Construction
and Cross-Access Easement will be abandoned with the construction of the travelway on the western
side of the HTC Hotel.
15.[Comment] Provide a copy of all off-site easements,deeds of easements,or letters of intent to grant them from off-site property
owners It appears that there are improvements proposed in the southwest corner of the site plant on an adjoining parcel
FINAL:Comment not addressed.
a) Provide a copy of all off-site easements,deeds of easement,or letters of intent to grant them from off-site property owners.
It appears that there are improvements proposed in the southwest corner of the site plan on an adjoining parcel Utilities,
utility easements. parking,the dumpster and landscaping for this project is currently shown on the adjoining site
Rev. 1: Comment not addressed. Address comment. Please note that although the comment response letter states "All
easements provided." It does not appear that any easements have been added to the site plan for any of the offsite
improvements, other than utilities that were shown on the previous submission. No linework, labels or notes appear to
address this issue.Address the comments as previously specified.
Rev.2:Comment not addressed.
-Acknowledged.
hl If Boundary Line Adjustment to incorporate that area of the project into the parcel is planned show it on the site plan.
Rev. 1:Comment not addressed.Address the comment.Since off-site improvements have not yet been addressed on the
site plan this comment remains.
Rev 2: Comment not addressed.
-Deed of easement has been provided for the off-site improvements to the north western corner.
c) It there continues to be improvements,and not just easements,shown on the adjoining parcel include the adjoining property
owner in the owner/developer area of the cover sheet
Rev. 1: Comment not address the comment or provide the necessary legal documents for the off-site improvements (and
their perpetual maintenance),access across the adjoining parcel,and construction in the adjoining parcel.
-Please see previous comment.
16. [Comment]Comment not fully addressed. See the attached comments from most of the other reviewers. ARB comments
will be provided after the February 12,2018 ARB meeting in which it will be reviewed Approval of the other reviewers, as well
as planning, is required prior to site plan approval
Rev. 1: Comment not fully addressed. See attached comments. Approval from all SRC reviewers is required prior to
site plan approval.
Page 3 of 5
Rev.2: Comment not fully addressed.See attached comments from most of the reviewers. RWSA comments have
not been received and will forwarded to you when they are available.
-Acknowledged
Additional comments for Final Site Plan
22. [Comment] If the improvements,for parking,dnve aisle, landscaping,dumpster,and utility improvements
continue to be split across two parcels ensure that Tax Map Parcel number and Owners name of the 2nd
'.arcel is appropriately included in the site plan.
Rev. 1: Comment not addressed. Address the comment or provide appropriate deeds, easements and agreements for
off-site improvements, access and construction.
Rev. 2: Comment not fully addressed. See attached comments from most of the reviewers. RWSA comments
have not been received and will forwarded to you when they are available.
-Acknowledged
30. [Rev. 2: NEW COMMENT] The dumpster, as an accessory use to the hotel, being on the adjoining lot
and on a lot that has no primary use may be of an issue. Zoning is researching the issue and the outcome
will be forwarded to you once it is available.
-Acknowledged
31. [Rev. 2: NEW COMMENT] The existing conditions sheet and site plan sheets (all) are missing items.
Address the following:
a) The access easement from Timberwood Blvd. is no longer shown and must be.
-Construction and Access Easement now shown.
b)The Drive Lane and Construction Easement is no long shown and must be.
-Construction and Access Easement now shown.
32. [Rev. 2: NEW COMMENT] According to the plat that was submitted for utilities, it appears that the
existing waterline in different sections was created by two different plats. Ensure all water line easements
deed book and page numbers are correctly labeled.
- We have received the comments for the Easement Plat Submittal in which the same concern is stated. This
revised final site plan is expected by the County for review against Easement Plat. Upon review of the plat,the
determination of whether the easements match will be made by the county. At which point the Easement Plat
revisions will be submitted with matching easements.
33. [Rev. 2: NEW COMMENT] The proposed sewer line easement is not in the same location as that shown
in the submitted utilities easement. Ensure that the two agree and are correct.
-We have received the comments for the Easement Plat Submittal in which the same concern is stated. This
revised final site plan is expected by the County for review against Easement Plat. Upon review of the plat.the
determination of whether the easements match will be made by the county. At which point the Easement Plat
revisions will be submitted with matching easements.
Page 4 of 5
' •
34. [Rev. 2: NEW COMMENT] Ensure the proposed waterline and water line easement on this site plan
matches the easement shown in the submitted utilities easement plat.
-We have received the comments for the Easement Plat Submittal in which the same concern is stated. This
revised final site plan is expected by the County for review against Easement Plat. Upon review of the plat,the
determination of whether the easements match will be made by the county. At which point the Easement Plat
revisions will be submitted with matching easements.
If you have any questions or concerns about these revisions please feel free to call me at(434) 227-5140 ext. 5 or email Peter
Russell at peter@shimp-enqineering.com and we can discuss any questions that you may have in further detail.
Best Regards,
Peter Russell
Shimp Engineering, P.C.
Page 5 of 5
PROJECT MANAGEMENT
SHIMP CIVIL ENGINEERING
LAND PLANNING
ENGINEERING
November 1st, 2018
Rebecca Ragsdale
County of Albemarle—CDD Zoning
Department of Community Development
401 McIntire Road, North Wing
Charlottesville,VA 22902
Regarding: SDP 201700070 HTC Hotel—Comfort Inn—Final Site Plan
Comment Response
Dear Ms. Ragsdale,
Thank you for your review of the Final Site Plan for HTC Hotel. We have reviewed and revised the plan per your most
recent comments dated August 1st, 2018. Please see below for detailed responses to each of your comments.
1. Based on the site plan provided, it does not look like the applicant is relying on shared parking but is asking for a parking
reduction for the hotel No request or justification that satisfies Section 4.12 was provided. If shared parking is being relied upon
with Bojangles, a parking study is still required and instrument must be recorded according to Section 4 12.8(e )
Rooms have been removed from the hotel and parking has been added.The required number of spaces have
been provided.
2. Please note that sidewalks and landscaping for the stormwater pond/amenity feature in Block 1 have not been completed
according to the application/plan code of development for Area C. (ZMA 01-20) Show these features on the next site plan
submittal and Proffer 1 or advise if these will be submitted separately?
Acknowledged. Information will be submitted separately.
If you have any questions or concerns about these revisions please feel free to call me at(434) 227-5140 or
email Michael Chandler at michael@shimp-engineering.com and we can discuss any questions that you may
have in further detail.
Best Regards,
Michael andler
Shimp Engineering, P.C.
Page 1 of 1
PROJECT MANAGEMENT
SHIMP CIVIL ENGINEERING
LAND PLANNING'
ENGINEERING
November 1st, 2018
John Anderson
County of Albemarle—CDD Engineering
Department of Community Development
401 McIntire Road, North Wing
Charlottesville,VA 22902
Regarding: SDP 201700070 HTC Hotel—Comfort Inn—Final Site Plan
Comment Response
Dear Mr. Anderson,
Thank you for your review of the Final Site Plan for HTC Hotel. We have reviewed and revised the plan per your most
recent comments dated July 23rd, 2018. Please see below for detailed responses to each of your comments.
1.VSMP plan approval required prior to Final Site Plan Approval.
-(Rev. 1)Applicant acknowledges; requirements for VSMP approval prior to FSP approval.
A revised VSMP Plan has been submitted to the County.
2. Drainage plan including stormwater calculations should be included in FSP
-(Rev. 1)Not addressed. Provide drainage plan, flow patterns and storm sewer calculations. utilize VDOT table format
-(Rev.2)Addressed. As follow-up,for proposed 8"HDPE roof drains (unless UBS or Albemarle County building permit plan
review dictate otherwise):
a. Recommend show 8"roof drains in profile to evaluate potential conflicts with walks or pavement.
b. Assign alphanumeric labels to roof drain pipes.
c. Provide cleanouts at roof drain line bends>45-deg
d. Provide two (2)45-deg bends instead of a 90-deg bend at south corner of hotel.
e. Show 8"roof line at Str. C1, Inv. In Elev.
f. Show 8" roof line tie-in at Ex. Str. 4(Elev).
The roof drain profiles have been provided on Sheet C11 and each of the above changes have been made.
3.Bumper blocks should be provided for parking abutting 5'sidewalks. Bumper blocks are required for any parking abutting
sidewalk<6' in width
-(Rev. 1)Not addressed. Bumper blocks required for 30 typ +3 HC parking spaces fronting hotel and proposed 5'sidewalks
-(Rev.2)Addressed.
4. In the northwestern parking lot, the CG-12 and detectable warning strip should be centered on handicap access isle.
Page 1 of 4
•
The door opens onto an even surface. Rather than have the door open on a sloping surface, the accessible pad was
extended to accommodate the door. The door leads to a laundry room and will have a lip at the entrance. The door is not
required to be accessible as 50%of the first floor doors are accessible.
-(Rev 1)Addressed
5. Stop sign should be provided at intersection of two private travelways. Stop sign should stop cars traveling northeast to
southwest
-(Rev. 1)Partially addressed.; Provide stop signs or stop bars at SW ends of parking aisles, at intersection with private
travelway. Allow thru motion on private travelway with stop required just beyond hotel entrance canopy, and at same location in
47 spy parking lot to the NW.
-(Rev.2)Addressed.
6. Ensure all new existing easements are labeled some easement labels are misaligned or conflict with other labels making them
illegible Please correct.
Easement labels were corrected for clarification If there are additional labels that are obscured please call out specifically.
-(Rev. 1)Addressed
7. Identify/label gutter type to be used along new travelways.
CG-2 note provided
-(Rev. 1)Addressed
8. Curb with gutter should be utilized wherever stormwater is to be conveyed.
Acknowledged
-(Rev 1)Addressed
9. Engineering details for curbing(CG-6, CT-3, etc )should be provided.
Provided on sheet c12
-(Rev 1)Addressed
10.Agreement must be made/provided related to access and construction of private travelways located outside limits of parcel.
ev. 1) r,
-(Rev.2)Comment pending
Approval on improvements will be forwarded when available.
Comments on Exhibit Dated 12/18/17
1 Scaling is incorrect making it difficult to verify contours/slopes. (Rev. 1)Uncertain if addressed; please provide copy
of revised exhibit
(Rev.2)Addressed.
2. Entrances must be a max of 4%grade for the first 40 feet from the intersection (Rev. 1)Uncertain, please provide
(Rev. 2)Comment withdrawn.
New 5/16/18
1. Title Sheet. Recommend revise signature block to read Albemarle County Engineer
(Rev.2)Addressed.
Sheet C4
2. Provide VDOT detail for CG-12, 2-ramp configuration (ramps at termini, ped xing paement markings)
Page 2 of 4
(Rev.2)Addressed.
3 Provided VDOT ref.to pedestrian crossing pavement marking specifications. Provide detail showing bar width. paint
type, etc. (Note' experience with accelerated wear of pavement markings on Meeting Street lends justification to need
for specifications/detail.)
(Rev.2)Addressed
4 Provide Auto-turn for dumpster. Use typ. Local vendor truck wheelbase. Design cannot be approved unless trucks can
access and service dumpster without 3-point turn. Access must be direct, and cause no damage to curb when truck is
reversing Current dumpster orientation appears problematic.
(Rev.2)Addressed. As follow-up:Label open gate width dimensions, dumpster enclosure detail (C10).
The gate width dimension has been included on the C10 dumpster enclosure detail.
5 Identify New GV feature, northernmost parking space. Locate any gas appliance outside parking spaces, for safety and
ease cf(39.rn,''r1"1 New GV is inaccessible if a vehicle if a vehicle occupies this parking space
(Rev.2)Addressed.
C5:
6 Reverse _ un of flow arrow between storm sewer structure B1 and ST7.
(Rev.2)Addressed.
7. New 10' x 6'water vault will not fit in 5'sidewalk; revise to show proper scale
(Rev.2)Withdrawn; review error.
8. Provide bedding detail for HDPE in trafficked conditions; structural backfill should extend (at a minimum)from the top of
the pipe to 6-inch above the pipe
(Rev.2)Addressed.
9. C7: Provide Detail 3 on C7(dumpster pad concrete slab detail) Detail 3 is ref. on sheet 10.
(Rev.2)Addressed.
10. C10. Revise Parking Area Pavement detail. Provide pavement design based on VDOT Pavement Design Guide, rev
Feb 2014. Provide DT3 DP3 using ADT=200. Note. 3"of SM-9.5A and 8"VDOT 21A base stone would satisfy design
criteria and meet VDOT design guidelines. Other options are also available.
(Rev.2)Addressed.
If you have any questions or concerns about these revisions please feel free to call me at (434) 227-5140 or
email Michael Chandler at michaeli. shimp-engineering.com and we can discuss any questions that you may
have in further detail.
Best Regards,
Michael Chandler
Shimp Engineering, P.C.
Page 3 of 4