Loading...
HomeMy WebLinkAboutWPO202000014 Bond Release 2021-12-03Nternot Uae Vole Dote Received; % 2/3 Z/ Fee NidaQ-1 -32 Received by: 4-- Auk. Fm a to Angnw Ads l.&qn BOND INSPECTION REQUEST APPROVED PLAN #: WPO202000014 PROJECT NAME (including Phase #): Avon Industrial Park (As listed on the approved plan) This form is used to request a reduction or release of a bond. A tee is required for each inspection. Please check dlc appropriate box below for the requested inspection(s). Fees includes 4% Technology Fee. Inspections for the purposes of bond reduction or release will require a separate fee for each bond. ® VSMPNESCP Erosion Control, Stormwater Management and/or Mitigation per Water Protection Ordinance sections 17-207 & 17-208 S294.32 ❑ Reduction ® Release ❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14-435 & 14-438 S307.84 ❑ Reduction ❑ Release ❑ Water & Sewer bond per Subdivision Ordinance section 14-435 S307.84 ❑ Reduction ❑ Release ❑ Site Development Performance bond (Incomplete Site Work & Landscaping) S344.24 ❑ Reduction (site work only) ❑ Release TOTAL FEES 294-32 Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville, VA 22902, Attention: Management Analyst — Phone 434-296-5832; Fax 434-972-4126. All roads and stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts, certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures). Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and County's published procedures. A minimum 20% of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded site work, a request for reduction should only be made once all landscaping is complete. If all required documentation is not received within 30 days of receipt of this request, this application shall be deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will be required. Applications may be withdrawn for a full refund within 30 days of receipt. If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner. Please provide contact information. EMAIL: duanesnow@gmail.com OR REGULAR MAIL ADDRESS: �gnature of Owner/Developer Duane Snow Dunns sNali✓ g•�. Zo2� Print Name Date Revised 7/152014, 7/20/2015, 11/32015, 8/14/2017, 1282020, vl/2021 12/2121, 3:54 PM Shimp Engineering, P.C. Mail - Fwd: Payment Submitted �Oi G CT'f a Fwd: Payment Submitted 1 message Odria Diaz <odria@shimp-engineering.com> To: Stephanie Yusif <stephanie@shimp-engineering.com> Stephanie Paul <stephanie@shimp-engineering.com> ---------- Forwarded message --------- From: Albemarle County - VA - Tax <no-reply@sturgiswebservices.com> Date: Fri, Aug 20, 2021 at 11:30 AM Subject: Payment Submitted To: <ODRIA@shimp-engineering.com> Albemarle County -VA - Tax PAYMENT SUBMITTED! Transaction ID 3UE293127Y485145L Total Paid $302.17 Thu, Dec 2, 2021 at 3:54 PM Item Amount Item Number: AFC5AD $294.32 Type: Community Development WPO/VSMP Notes: Project Name: Avon Industrial Park Bond inspection: (VSMP/VESCP ) WPO 202000014 As -built Sh Transaction Fee $7.85 Total $302.17 This email has been sent to you by Albemarle County - VA - Tax (or its subsidiary). Click here to unsubscribe. You will stop receiving any a -mails including bill notifications and payment receipts. https://mall.google.com/mail/u/0/?ik=af51 e637aO&view=pt&search=all&permthid=thread-f°/u3Al7l8O69185874053253&simpl=msg-f%3A17180691858... 1/1