Loading...
HomeMy WebLinkAboutARB202100107 Application 2021-08-30 i ''�;<� CommunityDevelopmentDecartr : . +,:;r: Albemarle COUl'l 401h4 ;Road Chatiottesvilie.V,A22902-4696 13 ;—IH 'du„....(434)295-6832 Fax.(434,972-4126 f;' Planning Application PARCEL / OWNER INFORMATION IMP 056A2-01-00-02900 Owner(s): CROZET CENTER PARTNERS LLC Application# ARB2021 i O107 PROPERTY INFORMATION Legal Description I ACREAGE CROZET SHOPPING CENTER Magisterial Dist, LVhite Hall Land Use Primary Commercial - Current AFD Not in A/F District Current Zoning Primar, Downtown Crozet District �., APPLICATION INFORMATION Street Address 15760 THREE NOTCH'D RD CROZET,22932 1 Entered By Jennifer Smith .,f 'PPlication Type Architectural Review Board ivI i s;31/2021 Project SIGN - CROZET VAPE Received Date 108/30/al. Received Date Final 1 1 Submittal Date 09/07/21 Total Fees 135.2 Closing File Date Submittal Date Final Total Paid 135.2 Revision Number Comments Legal �d [---------- , 1SUB APPLICATION(s) SIGN 09t"07/21 APPLICANT /CONTACT INFORMATION n _, ContectType I Te. �.. Address 1 Cib St=t= Ptxane Ph neCell - - - )=:C'E = LEH 74THFEE ii_T'H FE _F"7ET . v-_;_ =6i_7__ L__-__a-= CROZET CENTER PARTNERS LLC P 0 E3`-:610 A-:e`iNESBORO E=,3 :,,-na-y Ccnts ,N.ABIL AMERI i 5734 THREE NOTCH RD. i CROZET,VA 22 ii 32 `43443130206 i Signature of Contractor or Authorized Agent Date r Application and Checklist for Sign Permit Part A: Applicant and Parcel Information Project Name: � �(���(� Address: ��5 7 3 t r� (?-� ROI Tax map and parcel(s):F�y�►� ((rinn ? Tor)J Zoningmhi wt1 trG t Contact(Who should we call w/questions )Name 001 vl Art()qt'2 Business Name C(o Z Unp-ie Address �j iIfP{ DJO4c City C D1 °d State VA Zip Daytime Phone (1)4 13 020(, Fax#( ) E-mail J4 04{i 1-1.-e-Q9 nut , 0.0-70 Contractor Name: • Business Name: Address City State Zip Daytime Phone( ) Fax#( ) E-mail Business Owner Name: 16(6.0E) C/1 k Business Name ero e-I- ✓('. Address_5`73(f /i,reL iO1'_ii-Cl R d% City Cro'"ye State '✓A\ Zip 3 9— Daytime Phone(1-t3'() B]Z a 71 Fax#( ) E-mail t CLLc Q0 1233 'x4Loa,to- Part B: Determining application requirements and fees (includes 4% Technology Surcharge) NOTE: Fees are calculated PER SIGN. If you have-2 or more signs,fill out separate applications for each sign. 1. Sign Permit—Please indicate which sign type you are applying for: ❑ Freestanding or Monument Sign. $123.30 ❑ If a footing is required,an additional fee is required: $54.06 Wall Sign(Including property,awning,fuel pump canopy signs) Up to three wall signs per establishment may $123 30 he included on one permit meeting applicable size requirements Only one fee for all three wall signs will be assessed ❑ Sign Refacing- $85.60 2. Electrical Permit— Will the sign be illuminated? Yes (Illuminated signs require an electrical permit and an electrical schematic) $73 14 ❑ No $ 0.00 3. ARB Review—Will the permanent sign(s)be constructed in an Entrance Corridor? (Go to https//www albemarle org/govemment/community-development/advisorv-boards/architectural-review-board for more information) ❑ Yes (Review by Architectural Review Board See ARB requirements next pages) $147.68 iEr Yes (Review by ARB Staff See ARB requirements next pages $135.20 ❑ Yes Resubmittal of a sign application $67 60 ❑ No (This sign will not be constructed in an Entrance Corridor) $0.00 FEE TOTAL(Please add all the amounts checked in sections 1 —3). $ FOR OFFICE USE�,{{ ONLYn BP#o UQQ-I -I""l ��� R:# c=k3a 1- I01-- Fee Amount$J�''�4 Date Paid 0 3l! By whop ►l1i.i.lall I Ke. i •! I(Y3� ri ck# l Wkt By County of Albemarle Community Development Department 401 McIntire Road Charlottesville,VA 22902 Voice: (434)296-5832 Fax: (434)972-4126 www albemarle org 08/2021 Page 1 of 4 SECTION 2:WALL SIGNS • A. Submittal Requirements ❑ A drawing,to scale,showing dimensions of the sign(length,height,depth). ❑ Elevation drawing(s)or modified photograph of the entire building,to scale and in color,showing ❑ The sign location on the building,sign height above grade,and the length of building frontage. (Be sure to also include these dimensions on the diagrams provided in Appendix B.) ❑ Sign lettering and/or graphics in their proposed location 11 Entrance Corridor Requirements: If the sign is to be constructed in an Entrance Corndor,consult the Entrance Corridor Sign Guidelines at www.albemarle.org/arb for design requirements.Provide a color illustration of the front and side elevations of the sign showing: 1 Indication of sign type(channel letters,cabinet,panel,etc.) o Indicate on the drawings the proposed materials and colors. Include standard color identification numbers (Pantone,Benjamin Moore,Acrylic,etc.)for all materials,text,graphics,faces,trim caps,etc. For channel letter signs,indicate on the drawing that the raceway color shall match the color of the wall to which the raceway is attached. o If colors other than Pantone equivalents are identified,provide accurate physical samples of all colors proposed in the sign,preferably in the material proposed (Paint chips that accurately reflect the proposed colors are acceptable) o If externally illuminated,indicate the location of proposed light fixtures and provide manufacturer's cut sheets descnbing illumination type,intensity,style,shielding,color,and height.All lighting must meet ordinance requirements as outlined in Section 4.17. o For internally illuminated signs,indicate which areas of the sign are opaque and which are illuminated.(Opaque materials don't allow light to pass through.When lit only from behind,the color of an opaque matenal cannot be detected nor can objects be seen through it.Internally illuminated cabinets must have opaque backgrounds.) B. Inspection Requirements for Wall or Projecting Signs Eall and projecting signs are required to have electrical inspections if illuminated (Scheduled by applicant) ❑ Wall and projecting signs are required to have final building and zoning inspections. (Scheduled by applicant) SECTION 3: ILLUMINATION REQUIREMENTS A. If the proposed sign is to be illuminated,the applicant must provide the following: aellectncal permit ❑ Electrical schematic ❑ The location of proposed light fixtures identified on a plan and/or elevation ❑ Manufacturer cut sheets describing illumination type,mtensity,style,shielding,color,and height.All lighting must meet ordinance requirements as outlined in Section 4 17 of the Zoning Ordinance. 6/30/21 Page 3 of 4 Part C: Submittal Items Required Note.Submittal packages must contain 4 collated copies of all information unless otherwise indicated. Additional submittal materials may be required if review by the Architectural Review Board is necessary Applicants will be notified if additional materials or ARB review are required. SECTION 1: FREESTANDING, SUBDIVISION OR DIRECTORY SIGNS A. Submittal Requirements ❑ Site plan or latest approved plat showing,to scale,the proposed location of the sign(s)with dimensions. ❑ Distance from the sign to the property lines and/or edge of the VDOT right-of-way ❑ A footing/foundation diagram showing how the base or pole will be anchored in the ground. ❑ If the sign will be located in an easement,a letter of approval from the easement holder will be required. ❑ A to-scale color illustration of the proposed sign showing ❑ Dimensions of the sign.including overall height from the ground;cabinet size,length,width and depth;base size,etc (Be sure to also include these dimensions on the diagrams provided in the Sign Permit Application packet) ❑ Proposed lettering and/or graphics in their proposed location ❑ Entrance Corridor Requirements:If the sign is to be constructed in an Entrance Corridor,consult the Entrance Corridor Sign Guidelines at www albemarle org/arb for design requirements.Provide a color illustration of the front and side elevations of the sign showing: o If internally illuminated,indicate which areas of the sign are opaque and which are illuminated. Internally illuminated cabinet signs must have opaque backgrounds.(Opaque materials don't allow light to pass through. When lit only from behind,the color of an opaque material cannot be detected nor can objects be seen through it.) o Identification of proposed materials and colors.Include standard color id numbers(Pantone,Benjamin Moore, Acrylic,etc.)for all materials,text,graphics,base,faces,trim caps,returns,etc. o If colors other than Pantone equivalents are identified,provide accurate physical samples of all colors proposed, preferably in the material proposed.(Paint chips that accurately reflect the proposed colors are acceptable) o Provide a site plan showing proposed landscaping around the sign,including botanical names and planting sizes. o Additional submittal materials may be required if review by the Architectural Review Board is necessary.(The applicant will be notified if this requirement applies.) B. Inspection Requirements for Freestanding,Subdivision or Directory Signs ❑ Applicant must mark the location of the property lines and the location of the sign with stakes in preparation for a preliminary zoning inspection. (All four corners of the sign must be marked with stakes that are easily visible to all inspectors.) ❑ A preliminary zoning inspection must be completed to venfy the location of the sign before the permit can be issued. ❑ Freestanding signs are required to have footing inspections. (scheduled by applicant) ❑ Freestanding signs are required to have electrical inspections if illuminated. (scheduled by applicant) ❑ Freestanding signs are required to have final building and zoning inspections. (scheduled by applicant) 6/30/21 Page 2 of 4 f SECTION 4: WORK VALUATION I1, A. Work Valuation S 10 ,ry, . f Part D: Applicant Agreement Applicant must read and sign • Each application package must contain 4 folded copies of all plans and documents being submitted. Only 1 set of matenal/color samples is required. All submittal items become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies in their own files. • The application package is not complete without this checklist,completed,signed,and included with the required submittal materials indicated on the checklist. I hereby certify that the information provided on this application and accompanying information is accurate, true and correct to the best o my knowledge and belief and contains all information required by these checklists -7 h r)/- ) Signature of perso completing checklist Date tAb t �1 me/C1 30 C9 Printed Name/Title Daytime phone number of Signatory County of Albemarle Department of Community Development 401 McIntire Road,North Wing,Charlottesville,VA 22902-4596 (434)296-5832 Tel,(434)972-4126 Fax www.albemarle org 6/30/21 Page 4 of 4