Loading...
HomeMy WebLinkAboutARB202200029 Action Letter 2022-05-03,S.{.OF AL8 County of Albemarle Community Development Department - Planning ��BGIN�t' May 3, 2022 Jonathan Showalter Timmons Group 608 Preston Avenue, Suite 200 Charlottesville, VA 22903 Khristopher Taggart - Planner ktaggart@al be ma rIe.org Telephone: (434) 296-5832 ext. 3278 RE: ARB-2022-29: TJACH Premier Circle Initial Site Plan (TMP: 061M0-00-00-00600) Dear Mr. Showalter, At its meeting on Monday, May 2, 2022, the Albemarle County Architectural Review Board unanimously voted to forward the following recommendations on the above -noted Initial Site Development Plan to the agent for the Site Review Committee: • Regarding requirements to satisfy the design guidelines as per § 18-30.6.4c(2), (3) and (5) and Initial Site Plan approval: o The ARB recommends approval of the initial site plan based on the revised landscape plan presented at the May 2 meeting which resolves the easement and landscape conflicts along the frontage. • Regarding recommendations on the plan as it relates to the guidelines: None. • Regarding conditions to be satisfied prior to issuance of a grading permit: None. • Regarding the Final Site Plan: A Certificate of Appropriateness is required prior to final site plan approval. The following items and all items on the ARB Final Site Plan Checklist must be addressed: 1. Provide material/color samples for review. 2. Consider revising the windows along the south elevation, west of the courtyard area to match the scale of the windows present in the overall building design or otherwise relieve the blankness. 3. Consider revising the design of the southern portion of the east elevation to add architectural details to relieve the blankness. 4. Revise the site plan set to include a phased demolition plan. 5. Revise the site plan set to include the limits of work for each phase of the development. 6. Revise the architectural drawings to note conformity with the updated window glass specifications. The updated specifications are visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. 7. Confirm that the visibility of roof -mounted mechanical equipment has been considered in the perspective drawings. 8. Revise the architectural drawings to show the finish (material, color, detailing) of the elevator tower and show the tower in the perspective drawings. 9. Add the standard mechanical equipment note to the architectural plans: "Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated." 10. Revise the lighting plan to indicate that the plan was calculated using an LLF of 1.0 for all fixtures and revise the photometrics accordingly. WWW.ALBEMARLE.ORG 401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579 11. Revise the plan to indicate the fixture heights will not exceed 20' including the base. 12. Revise the lighting plan to include fixture locations and illumination values for the wall -mounted lights. 13. Add the standard lighting note to the plan "Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one half footcandle." 14. Revise the landscape plan to provide additional trees to meet the interior parking area landscaping requirements (one tree for every 10 spaces evenly distributed). 15. Revise the site plan to show the limits of work for Phase 1 of the development. Show tree protection fencing on, and coordinated throughout, the grading, landscaping, and erosion and sediment control plans where needed. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on-line at https://www.albemarle.org/government/community- development/apply-for/planning-and-site-development-applications. Please be certain that your ARB submittal addresses all checklist items and the above -noted comments. If you have any questions concerning any of the above, please feel free to contact me. If you have any questions concerning any of the above, please feel free to contact me. Sincerely, i t53 / Khris Taggart — Planner cc: PHA Premier Circle LLC 62 Berkmar Circle Charlottesville, VA 22901 File WWW.ALBEMARLE.ORG 401 McIntire Road, North Wing, I Charlottesville, VA 22902-4579