HomeMy WebLinkAboutWPO201800007-74734-Full Inspection ReportCOUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 (434)296-5832 WRITTEN WARNING Hand delivered Project: WP0201800007 RIVANNA VILLAGE -Amendment 1 and Phase II Operator/Contractor: Haley, Chisholm & Morris, Incorporated RIVANNA INVESTMENT HOLDINGS LLC Issued Date:5/3/2022 This is your Written Warning in accordance with § 17-900 of the Water Protection Ordinance of Albemarle County and Section 62.1-44.15:37 of the Virginia Stormwater Management Act. This Written Warning is being issued because of the following deficiencies: Deficiency: Maintain siltfence at buffers as needed Corrective Action: Deficiency: Stabilize any areas that are dorment or at final grade Corrective Action: Deficiency: Stockpiles stabilized if not actively working Corrective Action: Deficiency: Stabilize diversion as required Corrective Action: Deficiency: Basin 2 needs stabilizing on interior walls and dam Corrective Action: Deficiency: Overseed as required to ensure adequate cover to inhibit erosion Corrective Action: Deficiency: Continue to maintain and replace as required Corrective Action: Deficiency: Install straw mat to reduce impact to waterway from denuded impact Corrective Action: Deficiency: Install straw mat to reduce impact to waterway from denuded impact. Controls are in place as required from prior Inspection, straw blown inplace is falling, matting required Corrective Action: Deficiency: No concrete wash present, but concrete was not actively being poured Corrective Action: Unless subsequently amended in writing by this office, it is expected all corrective measures will be completed by Failure to comply by the required date may subject the owner to penalties and remedies as listed under § 17-900 et -al of the Water Protection Ordinance of the Albemarle County Code. Should you have a legitimate reason you cannot complete your required corrections by the above given date, you must immediately contact your erosion control inspector. Unless you have contacted the inspector and agreed to alternative arrangements, all compliance work is expected to be completed by the above date. County Inspector Name: Geoff Elsie County Inspector Phone Number: (434) 296-5832 COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP/VESCP PERMIT SITE INSPECTION REPORT Project Name: RIVANNA VILLAGE -Amendment land project/WPO Number: WP0201800007 Phase II Project Address: cprojectAddress» DEQ Permit Number (if applicable): VARlOJ510 Project Operator: Haley, Chisholm & Morris, Incorporated Operator Telephone #: (434) 978-1000 Project Contact: RIVANNA INVESTMENT HOLDINGS LLC Contact Telephone #: Contact E-Mail: tculpepper@robinsondevelopment.com Qualified Personnel (QP): Charles Justin Maxey Inspector: Geoff Elsie Qualified Personnel (QP) Email: «qualifiedPersonnelEmail» Disturbed Acreage: Weather (Wet/Dry/Rain): Single -Family: Inspection Date & Time: 5/3/2022 Stage of Construction: Grading Re -Inspection: Yes COVERAGE & POSTING REQUIREMENTS Compliant? Reviewed during re -inspection? No Comments/Description 1 Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A) (9VAC25-870-31 0)(Al b. Co. Code §17-300, 17-302) 2 A copy of the notice of coverage letter is posted conspicuously near the main entrance of the construction activity? (CGP Part II.C) Notice of the location of the SWPPP is posted near the site's entrance, if 3 applicable, and information for public access is provided? (9VAC25-870- 54.G)(CGP Part II D.2 & 3) SWPPP AVAILABILITY AND CONTENTS Compliant? Reviewed during re -inspection? No Comments/Description 4 The SWPPP is on -site or made available during the inspection? (CGP Part II D.1 & 2)(9VAC25-870-54.G) 5 The SWPPP contains a signed copy of the registration statement? (CGP Part II A.1.a) 6 The SWPPP includes, upon receipt, a copy of the notice of coverage letter and the CGP? (CGP Part II A.1.b & c) The SWPPP includes a narrative description of the nature of the 7 construction activity, including the function of the project? (CGP Part II A.1.d) The SWPPP includes a legible site plan identifying all appropriate 8 measures and that includes the locations of support activities and the onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7)) Page 1 of 6 9 The SWPPP contains the name, phone number and qualifications of "Qualified Personnel" conducting inspections? (CGP Part II A.6) 10 The SWPPP contains an approved erosion and sediment control plan? (9VAC25-870-54.B)(CGP Part II.A.2) The SWPPP contains an approved stormwater management plan or an 11 existing construction site has a stormwater management plan that ensures compliance with the water quality and quantity requirements? (9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ II.0 ❑ 12 The SWPPP contains an adequate pollution prevention plan? (9VAC25- 870-54.D)(CGP Part II.A.4) The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of 13 concern, exceptional waters and the additional controls measures applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b)) 14 Delegation of Authority is provided and signed in accordance with Part III K? (CGP Part 11 A.7) 15 The SWPPP is signed and dated in accordance with Part III K? (CGP Part 11 A.8) SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Compliant? Reviewed during inspection? No Comments/Description Is the SWPPP being amended whenever there is a change in the design, 16 construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870- 54.G) Has the SWPPP been amended if inspections or investigations by the 17 operator's qualified personnel, or by local, state or federal officials find that existing control measures are ineffective in minimizing pollutants in discharges? (CGP Part II B(2))(9VAC25-870-54.G) 18 Contractor(s) that will implement and maintain each control measure are identified? (CGP Part 11 B(3))(9VAC25-870-54.G) Have there been updates to the SWPPP when any modifications to its implementation have occurred, including a record of dates when major 19 grading activities occur, construction activities temporarily or permanently cease on a portion of the site or stabilization measures are initiated? (CGP Part 11 B.4(a))(9VAC25-870-54.G) 20 Is there documentation in the SWPPP of replaced or modified controls? (CGP Part 11 B.4(b))(9VAC25-870-54.G) 21 Is the SWPPP updated to indicate areas that have reached final stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G) Is the SWPPP updated to indicate properties that are no longer under the 22 legal control of the operator and the dates on which the operator no longer had legal control over each property? (CGP Part II B.4(d))(9VAC25-870- 54.G) Does the SWPPP identify the date of any prohibited discharges, the 23 volume released, actions taken to minimize the impact of the release and measures taken to prevent the recurrence of any prohibited discharge? (CGP Part 11 B.4(e-f)) (9VAC25-870-54.G) 24 mendments, modifications, or updates to the SWPPP are signed in accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G) INSPECTIONS AND CORRECTIVE ACTIONS Compliant? Reviewed during inspection? No Comments/Description Inspections required by the SWPPP are conducted at the required 25 frequency, including a modified frequency for impaired water(s), approved TMDL(s), and exceptional waters when applicable? (CGP Part II F (2)) (CGP Part II A.5.b.3) 26 Inspection reports are completed and signed in accordance with CGP Part 11 F (3-4)? (CGP Part 11 F (3-4)) Page 2 of 6 27 Corrective actions are taken consistent with the requirements of the CGP? (CGP Part II G(1-2)) ESC AND SWM PLAN IMPLEMENTATION Compliant? Reviewed during inspection? Yes Comments/Description 28 Have stream buffers and steep slopes been protected as shown on the No Maintain siltfence at buffers as needed plan? Sequencing of the project is implemented in accordance with the Perimeter controls and basins need to be per plan. 29 approved erosion and sediment control plan and stormwater management Yes Y Stabilize as needed plans? (9VAC25-870-54.B and C) Have all denuded areas requiring temporary or permanent stabilization Stabilize any areas that are dorment or at final grade been stabilized, and have stabilization requirements for impaired waters, 30 approved TMDL(s), pollutants of concern and exceptional waters, when No applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25- 880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8)) (CGP II E(1-2)) Are soil stockpiles adequately stabilized with seeding and/or protected Yes Stockpiles stabilized if not actively working 31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II A.2(c)) (9VAC25-870-54.B) A permanent vegetative cover has been established that is uniform, NIA 32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have sediment trapping facilities been constructed as the first step in land Yes 33 disturbance activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have earthen structures been stabilized immediately after installation? No Stabilize diversion as required 34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.6) Are sediment traps and basins installed in accordance with MS-6 and the No Basin 2 needs stabilizing on interior walls and dam 35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Are finished cut and fill slopes adequately stabilized to prevent or correct Yes Overseed as required to ensure adequate cover to 36 excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1- inhibit erosion 2)) (9VAC25-870-54.B) Is concentrated runoff down cut or fill slopes contained in an adequate Yes 37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is adequate drainage or other protection provided for water seeps? N/A 38 (9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.13) Do all operational storm sewer inlets have adequate inlet protection? No Continue to maintain and replace as required 39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.13) Are stormwater conveyance channels adequately stabilized with channel N/A 40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is in -stream construction conducted using measures to minimize channel N/A 41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are temporary stream crossings of non -erodible material installed where N/A 42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Install straw mat to reduce impact to waterway from 43 Is necessary restabilization of in -stream construction complete? (9VAC No denuded impact. Controls are in place as required from falling, 25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B) prior Inspection, straw blown inplace is matting required Are utility trench operations conducted and stabilized in accordance with Yes 44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are soil and mud kept off paved or public roads to minimize the transport Yes 45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Page 3 of 6 Have all temporary control structures that are no longer needed been 46 removed and disturbed soil resulting from their removal permanently N/A stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are properties and waterways downstream from development adequately 47 protected from erosion, sediment and damage in accordance with the Yes standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840- 40.19(a-n)) 48 Permanent control measures included in the SWPPP are in place? N/A (9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a)) POLLUTION PREVENTION PLAN IMPLEMENTATION Compliant? Reviewed during inspection? Yes Comments/Description Practices are in place to prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, Yes 49 and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part III G? (CGP Part II A.4.e(1))(9VAC25-870-56) Practices are in place to prevent the discharge of spilled and leaked fuels Yes 50 and chemicals from vehicle fueling and maintenance activities? (CGP Part II A.4.e(2))(9VAC25-870-56) Practices are in place to prevent the discharge of soaps, solvents, 51 detergents, and wash water from construction materials, including the No clean-up of stucco, paint, form release oils, and curing compounds? (CGP Part II A.4.e(3))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from vehicle N/A 52 and equipment washing, wheel wash water, and other types of washing? (CGP Part II A.4.e(4))(9VAC25-870-56) 53 Concrete wash water is directed into a leak -proof container or leak -proof No No concrete wash present, but concrete was not actively being poured settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from N/A 54 storage, handling, and disposal of construction products, materials, and wastes? (CGP Part II A.4.e(6))(9VAC25-870-56) Practices are in place to prevent the discharge of fuels, oils, and other Yes 55 petroleum products, hazardous or toxic wastes, and sanitary wastes? (CGP Part II A.4.e(7)(9VAC25-870-56) Practices are in place to minimize any other discharge from the potential N/A 56 pollutant -generating activities not addressed above, when applicable? (CGP Part II A.4.e(8))(9VAC25-870-56) Page 4 of 6 Notes: CONSTRUCTION GENERAL PERMIT SITE INSPECTION REPORT REQUEST FOR CORRECTIVE ACTION Project Name: Permit Number (if applicable): Date: Regulatory Occurrence Observation/Recommended Corrective Action Checklist # Citation/Legal requirement' Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: Observation: Recommended Corrective Action: 1 Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). Page 5 of 6 Corrective Action Deadline: Re -Inspection Date: Comments: The recommended corrective action deadline date applies to all conditions noted on this report unless otherwise noted. If listed condition(s) currently constitute non-compliance and/or corrective actions are not completed by the deadline, other enforcement actions may be issued to the entity responsible for ensuring compliance on the above project. Page 6 of 6 Construction General Permit Site Inspection Report Request for Correction Action Check Regulatory Citation/Legal Occur. Observation Recommended Corrective List # Requirement* Action 28 Maintain siltfence at buffers as needed 30 (9VAC 25-840-40.1) Stabilize any areas that are (9VAC25-870-54.B) dorment or at final grade (9VAC25-880-60) (CGP Part I F.1(a)) (CGP Part 11 A.5.b(1)) (CGP Part 11 A.2.c (8)) (CGP 11 E(1-2)) 31 (9VAC 25-840-40.2) Stockpiles stabilized if not (CGP Part 11 A.2(c)) actively working (9VAC25-870-54. B ) 34 (9VAC 25-840-40.5) Stabilize diversion as required (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54. B ) 35 (9VAC 25-840-40.6) Basin 2 needs stabilizing on (CGP Part 11 A.2.c (9)) interior walls and dam (CGP Part 11 A.2(c)) (CGP 11 E(1-2)) (9VAC25-870-54. B ) 36 (9VAC 25-840-40.7) Overseed as required to (CGP Part 11 A.2(c)) ensure adequate cover to (CGP 11 E(1-2)) inhibit erosion (9VAC25-870-54. B ) 39 (9VAC 25-840-40.10) Continue to maintain and (CGP Part 11 A.2(c)) replace as required (CGP 11 E(1-2)) (9VAC25-870-54. B ) 43 (9VAC 25-840-40.15) Install straw mat to reduce (CGP 11 E(1-2)) impact to waterway from (9VAC25-870-54.B) denuded impact 43 (9VAC 25-840-40.15) Install straw mat to reduce (CGP 11 E(1-2)) impact to waterway from (9VAC25-870-54.B) denuded impact. Controls are in place as required from prior Inspection, straw blown inplace is falling, matting required 53 (CGP Part 11 A.4.e(5)) No concrete wash present, (9VAC25-870-56) but concrete was not actively being poured Recommended 5/17/2022 Corrective Action Deadline: Targeted Re- 5/24/2022 Inspection Date: Comments: Majority of corrections have been made. Box culverts are seed,straw, and silt fenced. Majority of inlets are protected as required, still have a few to complete. Stabilize any areas that are not protected by a strong cover of vegetation *Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). Construction General Permit Site Inspection Photo Log Photos for Item 2 Photos for Item 4 Photo Description: Photos for Item 10 Photo Description: Photos for Item 29 TimePhoto_20220503_084317.jpg.jpg 642.23KB _ I:I 1.1 hl hI ■� : i^\i iCi it I t ;• 1.. Photo Description: Example of still missing inlet protection and siltfence to help contain, missing stabilizing Photos for Item 30 Time Photo_20220503_085012.jpg.jpg 741.49KB Photo Description: Example of area that has been seeded prior but needs overseeding Photos for Item 34 Ti mePhoto_20220503_085458.j pg.j pg 756.2 KB Photo Description: Stabilize as needed Photos for Item 43 Time Photo_20220503_085512.jpg.jpg 852.81 KB Photo Description: Example of corrections made TimePhoto_20220503_084835.jpg.jpg 928.34KB Photo Description: Example of completed corrections Photos for Item 51 TimePhoto_20220503_100929.jpg.jpg 989.84KB Photo Description: Not corrected from last inspection COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Inspection Date: 5/6/2022 County Inspector Charlottesville, Virginia 22902 434 296-5832