Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO202200020 Plan - Submittal (First) 2022-05-06
LEGEND EXISTING NEW 311.5 x 311.5 TC x x' 311.5TWx x' 311.5 BW x X X m m OHU CHU uGU UGu O q q S S W W O O A GAS DESCRIPTION BOUNDARIES BENCHMARK SITE PROPERTY LINE ADJACENT PROPERTY LINE BUILDING SETBACK PARKING SETBACK SITE TEXT PARKING COUNT TOPOGRAPHY INDEX CONTOUR INTERVAL CONTOUR SPOT ELEVATION TOP OF CURB ELEVATION TOP OF WALL ELEVATION BOTTOM OF WALL ELEVATION STREAM STREAM BUFFER 100 YEAR FLOODPLAIN BUILDING BUILDING RETAINING WALL STAIRS EDGE OF PAVEMENT ROAD CENTERLINE FRONT OF CURB BACK OF CURB CG-12 TRUNCATED DOME SIDEWALK BIKE PARKING HANDICAP ACCESSIBLE AISLE HANDICAP PARKING MATERIAL CONCRETE RIPRAP ASPHALT EC-2 MATTING EC-3 MATTING WETLAND TREELINE FENCE UTILITY UTILITY POLE GUY WIRE OVERHEAD UTILITY UNDERGROUND UTILITY STORM STORM MANHOLE DROP INLET STORM SEWER ROOF DRAIN SANITARY SANITARY MANHOLE SANITARY SEWER MAIN SANITARY SEWER LATERAL WATER WATER LINE WATER METER WATER METER VAULT FIRE HYDRANT FIRE DEPARTMENT CONNECTION GAS GAS LINE EASEMENTS CONSTRUCTION GRADING ACCESS SIGHT DISTANCE UTILITY STORMWATER FACILITY MAINTENANCE STORMWATER ACCESS DRAINAGE SANITARY WATERLINE GASLINE SOUTH PANTOPS DRIVE OWNER/DEVELOPER Owner: South Pantops II Land trust Charles W Hurt Email: charlie@virginiaLandCompany.com Phone:464-979-2193 Shirley Fisher Trs Address: P.O BOX 8147 Charlottesville VA, 22906 ZONING R15 - Residential Flood Hazard Overlay, Steep Slopes - Managed, and Steep Slopes - Preserved MAGISTERIAL DISTRICT Rivanna VOTING DISTRICT Free Bridge SOURCE OF TITLE D.B. 2913-161 PLAT BENCHMARK Top of existing sanitary manhole along South Pantops Drive. Elevation 405.17 SOURCE OF BOUNDARY AND TOPOGRAPHY Topographic information for adjoining parcels provided by LIDAR data and Albemarle County GIS . Plat Records. FLOODZONE FEMA flood insurance rate map (community panel 51003c0289D), Effective date February 04, 2005 shows this property lines in the 100- year flood plain. DAM BREAK INUNDATION ZONE The parcel is within the State Dam Break Inundation Zone & Federal Dam Break Inundation Zone. GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS 1. The plan approving authority must be notified one week prior to the pre -construction conference, one week prior to the commencement of land disturbingactivity, and one week prior to the final inspection. Y, P P 2. All erosion and sediment control measures will be constructed and maintained according to minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations. 3. All erosion and sediment control measures are to be placed prior to or as the first step in clearing. 4. A copy of the approved erosion and sediment control plan shall be maintained on the site at all times. 5. Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority. 6. The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. 7. All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until final stabilization is achieved. 8. During dewatering operations, water will be pumped into an approved filtering device. 9. The contractor shall inspect all erosion control measures periodically and after each runoff producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. 10. All fill material to be taken from an approved, designated borrow area. 11. All waste materials shall be taken to an approved waste area. Earth fill shall be inert materials only, free of roots, stumps, wood, rubbish, and other debris. 12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning Ordinance section 5.1.28. 13. All inert materials shall be transported in compliance with section 13-301 of the Code of Albemarle. 14. Borrow, fill or waste activity involving industrial -type power equipment shall be limited to the hours of 7:00am to 9:00pm. 15. Borrow, fill or waste activity shall be conducted in a safe manner that maintains lateral support, or order to minimize any hazard to persons, physical damage to adjacent land and improvements, and damage to any public street because o slides, sinking, or collapse. 16. The developer shall reserve the right to install, maintain, remove or convert to permanent stormwater management facilities where applicable all erasion control measures required by this plan regardless of the sale of any lot, unit, building or other portion of the property. 17. Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75 Ibs/acre, and in the months of September to February to consist a 50/50 mix of Annual Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May through August to consist of German Millet. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approved by the County erosion control inspector. 18. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch. Agricultural grade limestone shall be applied at 90lbs/1000sf, incorporated into the top 4-6 inches of soil. Fertilizer shall be applied at 1000lbs/acre and consist of a 10-20-10 nutrient mix. Permanent seeding shall be applied at 180lbs/acre and consist of 95% Kentucky 31 or Tall Fescue and 0-5% Perennial Ryegrass or Kentucky Bluegrass. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approved by the County erosion control inspector. 19. Maintenance: All measures are to be inspected weekly and after each rainfall. Any damage or clogging to structural measures is to be repaired immediately. Silt traps are to be cleaned when 50% of the wet storage volume is filled with sediment. All seeded areas are to be reseeded when necessary to achieve a good stand of grass. Silt fence and diversion dykes which are collecting sediment to half their height must be cleaned and repaired immediately. 20. All temporary erosion and sediment control measures are to be removed within 30 days of final site stabilization, when measures are no longer needed, subject to approval by the County erosion control inspector. 21. This plan shall be void if the owner does not obtain a permit within 1 year of the date of approval. (Water Protection Ordinance section 17-204G.) 22. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced. (Water Protection Ordinance section 17-207B) EXISTING USE Vacant wooded lot Total Acres: 5.34 Ac PROPOSED USE Proposed units - Twelve(13) units Multifamily Housing , gross residential density : 3.0 DUA Maximum Disturbed Area: 1.31 (Acres) LAND USE SCHEDULE Existing % SF AC %Proposed Building Building 0.0000 0.00 0.0% Pavement 8939.03 0.21 3.8% Open Space 223,671 5.13 96.2% Open Space 232,610 5.34 100.0% Pavement Sidewalk- Retaining Wall Open Space SF AC % 10,374 0.24 4.5% 20239 0.46 8.7% 5,227 0.12 2.2% 196,769 4.52 84.59 Open Space 232,610 5.34 100.0% RESERVOIR WATERSHED This site is within the Rivanna River watershed (020802040401). This site is not within a watershed of a public water supply. WATER & SANITARY SERVICES Site is served by Albemarle County Service Authority. GENERAL NOTES 1. The information and data shown or indicated with respect to the existing underground utilities at or contiguous to the site are based on information and data furnished to the owner and engineer by the owners of such underground facilities or others. The owner or engineer shall not be responsible for the accuracy or completeness of such information or data. The contractor shall have full responsibility for confirming the accuracy of the data, for locating all underground utilities, for coordination of the work with owners of such underground utilities during construction, for the safety and protection thereof and repairing any damage thereto resulting from the work. All of these conditions shall be met at no additional cost to the owner. The contractor shall contact "Miss Utilities" of Virginia at 1-800-552-7001 prior to the start of work. 2. When working adjacent to existing structures, poles, etc., the contractor shall use whatever methods that are necessary to protect structures from damage. Replacement of damaged structures shall be at the contractor's expense. 3. The contractor shall be responsible for protecting all existing site structures from damage and coordinating work so that the P P 9 9 9 9 owner can make necessaryarrangements to modify/protect existin structures from damages. 99 9 4. The contractor shall be responsible for notifying all utility owners, adjacent land owners whose property may be impacted and the Virginia Department of Transportation prior to completing any off -site work. 5. Contractor shall notify and coordinate all work involving existing utilities with utility owners, at least 72 hours prior to the start of construction. 6. Contractor shall immediately report any discrepancies between existing conditions and contract documents to the owner and engineer. 7. Contractor shall submit for the approval of the owner submittals of all specified materials listed in the plans, to include shop drawings, manufacturer's specifications and laboratory reports. the owner's approval of submittals will be general and will not relieve the the contractor from the responsibility of adherence to the contract and for any error that may exist. 8. All bare areas shall be scarified, limed, fertilized, seeded and mulched. 9. All trees, saplings, brush, etc. shall be removed from within the right of way and the drainage easements. 10. Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated. 11. Retaining walls require separate building permits. 12. All water service lines, sanitary laterals, and sprinkler lines must be visually inspected by the Albemarle County Building Department from the main to the structure. 13. Buildingor structures built before January 1 1985 must have an asbestos survey performed in order to a for permit. rY Y P apply Asbestos removal permits are required is positive for such from Albemarle County and VDOLI. Contact VDOLI for additional requirements and permits for demolition projects. 14. Where the flood level rims of plumbing fixtures are below the elevation of the manhole cover of the next upstream manhole in the public sewer, the fixtures shall be protected by a backwater valve installed in the building drain, branch of the building drain, or horizontal branch serving such fixtures. Plumbing fixtures having flood level rims above the elevation of the manhole cover of the next upstream manhole in the public sewer shall not discharge through a backwater valve. GENERAL CONSTRUCTION NOTES 1. Prior to any construction within any existing right-of-way, including connection to any existing road, a permit shall be obtained from the Virginia Department of Transit (VDOT). This plan as drawn may not accurately reflect the requirements of the permit.Where any discrepancies occur the requirements of the permit shall govern. 2. All materials and construction methods shall conform to the current specifications and standards of VDOT unless otherwise noted. 3. Erosion and siltation control measures shall be provided in accordance with the approved erosion control plan and shall be installed prior to any clearing, grading or other construction. 4. All slopes and disturbed areas are to be fertilized, seeded and mulched. 5. The maximum allowable slope is 2:1 (horizontle:vertical). Where reasonably obtainable, lesser slopes of 3:1 or better are to be acheived. 6. Paved, rip -rap or stabilization amt lined ditch may be required when in the opinion of the County Engineer or designee it is deemed necessary in order to stabilize a drainage channel. 7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices. 8. Unless othrewise noted all concrete pipe shall be reinforced concrete pipe - Class III. 9. All excavation for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR Part 1926). GENERAL WATER & SEWER NOTES 1. Work shall be subject to inspection by Albemarle County Service Authority inspectors. The Contractor will be responsible for notifying the proper service authority officials at the start of the work. 2. The location of existing utilities across the line of the proposed work are not necessarily shown on the plans and where shown, are only approximately correct. The contractors shall on his own initiative locate all underground lines and structures as necessary. 3. All materials and construction shall comply with the current edition of the general water and sewer construction specifications as adopted by the Albemarle County Service Authority. 4. Datum for all elevations shown in National Geodetic Survey. 5. The contractor shall be responsible for notifying "MISS UTILITY" (1-800-552-7001). 6. All water and sewer pipes shall have a minimum of 3.5 feet of cover measured from the top of pipe, over the centerline of pipe. This includes all fire hydrant lines, service laterals and water lines, etc. 7. All water and sewer appurtenances are to be located outside of roadside ditches. 8. Valves on deadend lines shall be rodded to provided adequate restraint for the valve during a future extension of the line. 9. Trees are not permitted in the ACSA easement. 10. The contractor shall be responsible to comply with the no -lead regulation regarding brass fittings effective January 4, 2014 (Senate Bill 3874 which amends the Safe Drinking Water Act). 11. All public water and sewer facilities shall be dedicated to the Albemarle County Service Authority. 12. Backflow prevention is required for all connections to the water main. VSMP SITE PLAN - PARCEL 20R TAX MAP 78, PARCEL 2OR ALBEMARLE COUNTY, VIRGINIA VICINITY MAP SCALE: 1"=2000' Map provided by Google.com SHEETINDEX C1 COVER SHEET C2 EXISTING CONDITIONS C3 SITE LAYOUT C4 GRADING & UTILITY PLAN C5 ES&C NARRATIVE C6 EROSION AND SEDIMENT CONTROL PLAN PHASE 1 C7 EROSION AND SEDIMENT CONTROL PLAN PHASE 2 SHIMPG2 C8 EROSION AND SEDIMENT ENGINEERIN CONTROL DETAILS LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434,227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM U Q a 183 VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. FILE NO. COVER 22.002 C1 ri r — — — — / / / / / / / / / \ \\ \\ \\ / / / / / / i //i \ I IN \ \ / \ _ ` � \ \ \ �\ \\ � � \\ \// // /// / / / // / / // // / /1 I \\ I1 I b_-\ \ \ \ \ \ / �/ \ I . \ . - E \`� � � \ \\ � \ � � \ \ � ` \ \ � � \- -/ i / r / / / / / / / / 1 \ v N IN \\\IN I I 00 � Il- _ _ I \ n1ilt,�\ \ \ \\+. \ � `\ \NN vAV`Vv\�v�vv\ vv v v �Q-PROPERT LL � ��vV A/''\ \ \ \ I I 15162 \ � Y, �� v \v // , ` � \ I IN �n 672 v v // I II A I I111� \ 1 A 1 AI\ \ / / /II 1 \—ice)•11 low t \\\\ \ / I I s I \ \ \ \\ 1,-, r _� �� �� ,.� sV / I I I V A \ V A A l 1 1 A V A / A l( / r I I / I I \ 1\ \ \ l I 1 I \ \ \ 1 1 \V v 2 \VN. A\VA\ v %\ IN-- — / �- 40 v Vvv v I / v v v I '� l vv v A / Av vv vv \ v A v IF \ \ vv v N. ` \ \ \ 2 \ \ \ \ \ \ \<.c `Y.j' - �\ /,. �\ \ \ \aa"N \\ a \ \ \ v v j A / y�v� db, A ; A A 1, v V`� l I =A T v A O v; y" V i .v Vvv `Vp'.. 1 P� \ \� �' v S VGG O O .` I v v v v \A \� 00 v ,\ '�' /� �� vv v v vv \ \\IV A I II \\ \\ \\ \ \\ \I II A\ \\ \\ A \\\V 1\ 1\ / / ^ \ \ /\ 1 AP P Op. LO A \`\ \ PQ\� q 1 \\ \\ \ \\ / \\\ II \ II 1 • \\\ \\\\ \ �/ I i \� \ A \ \ \ /vim .• v ' ' '/ VOA 'V ''v v�V..- �MENT 1 1 ITCH fCN V vv �V / V v v A \ v ,/ 1 V A A\ \\ \ \ // vV/i Av A A \ \ V A \ V �� V \ V A V "/ h �� GE I vvv vv vv v v \ V IN A LI v 3 v V A � �11 1 � �// I d 00IN v - / vv.?` V•-; �' I, 4 11 I ,I I 1 A V A >�, 3j, A M�. V vvvA vvV 1 vv v� `--�v V `v v vv\ _ - vv "y\ \23� \� v \v V A A \I �� \ \v AA\Av\�� v �` ` `v I \ \ \ \ > \ \ \ \ �I / ;I I- IIIIlII� I YI I 11 I AV�I A 0 MO (P I AvvAv v`v I 1 I I I /A- Avvvv\ �v \ \\ v v A V ./ k f., I I I 1 1 I , A A Y v v v A I I 1 1 v A v < I � �� � I � � 1 I I A\ \ \ IV � 1� V 1 V "oJ w v`� v� vvv v � I I I 1 A� AvAvv vvv` v A v A 1 A v \ v I I I 1 \\v�v�v� \vvv v l� VvV v A V vv ' 11 \ \ \ V A �V V ` • A O''�� \\ vv Vv vvvR V`� \ I ♦ / \A vv�AV ` I U , <. V A A A 1 0' V vv A v v A A V l l m . v,vv , '�A :' � )•, :,I, A \ \ � V \ A \ s0 I 00000 PF�ESERV�D SLO E L I (A\ \ \ \ \ A A AV \V �� . V �V ` �� , �.A.Ay v A \\ V `.I ".A ,N\�\\VA\ E \VA `v A V ` v A \V v v \V A\\ v vvvvvv 1vV v__ 1 \ \\\� \ 1 1\ \\\\\ \ \ \ \ \ \ \ \\ \\ \ \ \ ♦ \ \ - - - 1 \ �\ \ \ \ . \ ��/ -- \ \�: �\�� t \ \ `�3 \ + Tl�i'g8-2OR / \ v\ \ \ \ \ \ \ \ \ \\ \ 1 Iv SO�1TH PAf I\OPS II L ND \R ST \— oc \ \ \ \ \ \ \ \ \ \ : f/ vA '*ER: CN.ARLES Vd HURT \ �Y 9 \ \ \ \ \ \ \ \ I SHIRLEY FISHES TRS \: `� \ \Spri \\\\ \ \ \\ ` \ \\ \� \ \ \N \ \ A V A A A V \ A \ A ZONE: AREA. 5.34 ACRES \ \ 1 \ I \ 1 \I \ 1 % �1� / y2\SIGHT TANC v v ( \ / '/ R� \ _ A V 1 / o EASEMENT-v v v v\ v \� / \ \ I 1 1 I P i_\ \ /\� vv, v v V vAA / / /--) �- /" - �\� V ��.� � � � V � _ _ � � 111 V 1 1 Q Vv vA \V vvv\ V A V \ r \ \ v w v 11 1 V GG �-I- �t vv v \ \ N. APPROX Ufff\t OF .\ \^\�\ \ 10UYEAR PL OD y \ `7 �? ZONE AS SHOWN .\ . �� \ ` \ 7 ��'� A \COMMUNITY PANE V Av. A � 36e ��v AND STREAM CONSERVATION\\�\ ,\\ \ \\ill ✓' \_ \\\ \\`�\ \ \ \ \/" I 1 \ \ \\ , ,/,-\ \�`\ AvvA Kii VA�Vlk' 1(p \, \__\ \\\\ ` I /r . •. .\\ \\, .l . 1. I /\ \ ., US'T\ \ \ RI IIIIIII / � _ J / I \ \ \ \ \ ' __- . / Av�� V / vv'' ✓�/. °VV I . I• .\V ���� I i.�- U rV1 1 1 Illlllli-__- / x�l\\ /\ (\,I f? \-_\\\\ \r> ; ..% // ./� .-9 \\\ ��.\ 1 T\ ✓ >: i ,`O ^k% I F� I \ L I I 1 �\ II , \ \ \\\ \ `\ \ \\ \ \\ N (� I \ \\ 1 �� ,/ • //. \� - , h \ `\ I A v IAVA v I /. A��vvyI •/`/ ' �/ / ,S\ / /.. / 'I I I { �I a �� vv A V A A `�� 1 A\\V AA I i R / / '✓✓, I `F II III /-. -- \ \ _ 'V -V A A A \ \ '� WATER . . . ' ;��. \.; V 1V ' I / / <�..„I / �i ; I, II, , ♦ ��vvv I`. 1� I II III vvv \.\.. IA I v / , A� A' ` v 'j A '\ b I �`v I'I i\ I _ Al\V\AAAA-�^?/ I \\ \ \ \ \ \ \ \ \\ A. V A A V>( � � II 11111 I v . Nx y A V V AvAAVAA� 1 / 7 . . 315.B vvv v� o.v I I l 23B v v v . .,i< \.��I, I I� I III \\\ az,s \\ \\`` ` /\, . . . . . . . . ./. y v\ IA) \\ � £1__� _� / . . vv A \ �G A I ' I �I 1 v \ `. v/� v / N. vAv�v . . viA V v' 1 vIt vv A£ v A 40 0 40 80 120 yv .... �. ,, I I y I 1 I I�A `v i11 I , / N Scale: \ ,1 t I , ( _ �.�j� �, . �^ • � . .. .. .1 . . , . �, � 1 r �- 1 ! I I I ! � 1 "=40' LEGEND: IF IRON FOUND IS IRON SET MATCH LINE SOIL TYPE BOUNDARY (NOTE: ALL SOILS HSG 8) COUNTY GIS PRESERVED SLOPES SHIMP ENGINEERING LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM U VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. FILE NO. EX. CONDITIONS 22.002 C2 ---------- / N / _ •f 1 -- LIMITS OF -- _ DISTURBANCE — 1 —F 6 --------------------- - \ \ 6' PLANTING STRIP RIP ------------------ t \ TING 1 t • ., ':•. % ,a,:'... ( v„, y's' � >„ \' ° ;.'✓ 4 Yi ny �M1t,,c',«! pf , J i � � °�74yi Y F .0 r „�;.M1 e'', }r .,•,c �r',wA ^%,.. a a a z• ! ' , �• �-� \/ / \ \\ \\ —__-- -------------- V -- T S 380 ------------------------ -- \---- EXISTING PAVEMENT \ \ STATE ROUt 1140 SOUTH _ LIMITS OF— NEW PAN TOPS DRIVE _-- \\ 2- �\ 44 DISTURBANCE DocElouSE \ \ cc-6 — — \ wr . t:n'e+..... .a..... . a.'., .: ,. .r.a.,.fr.a...... .a ., Y.+4.rf..• a .,, n. R ,:„ :, .y1 ... . a., C . .rlr.,r. v.., ,.F\.:an :ff .. .�:.6...•r..' :.P-.•:Ln.. . tA..',NrF..rTr"..FIrNel.G.•t. .w'.:. S..i r.rT,yaR..•...I. PPLANTING r„.nlYx•F' +l. :.�...'r. �.:nfr .J.Yi'ni T• n,Y r: illr Z/' iAnk6'4n PLANTI%N�.{tG l.'. STRIP JY l,a Y. \ ® ' lQi I I HIM ENG I NEERI N G _mow— I \ LAND PLANNING -PROJECT MANAGEMENT l L:L" \ O \ / 912 E. HIGH ST. 434.227.5140 -- \ I � � � _--------_ _ CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERINGCOM 12.0'---------__ SIGHT DISTANCE -- 420 \ \ - / /. EASEMENT ---- FFE 423.5 FFE 424. \ / —\\ ---- _ -PFE-4 2.0 BFE 413.0 _ \ / —-------- � \ \ \ \ BFE 41 .5- BFE 414.0 FFE 428.0 $ \N (OY \ \ \ \ \ — FFE\425.5 FFE 426.0 FFE 427. FFE 429.0 \ \ \ BFE 415.0 BFE 416.0 BFE 417.0 FE 418.0 a -476 — — \. `—\ BFE 419.0 /� / /\ \ \ \ \ FF416.0 FFE 417.0 BFE 418.0 FFE 419.0 FFE 420.0 \BFE`4,It6.0BFE 407.0 BFE'4'Q8.0 BFE 409.0 BFE 410.0 I 422 CAR 2-C4RME-CAR 2-CAR PARKING —\ \ U V A \ \ \ PARKINS C0PARKING PARKING 2-CAR o \ \ A A v j PARKING 2-CAR / Lie N .45183 ;.: 412 C- --- err i PARKING PARKA ���1'��- �q \ \ \ \ \ � 2-CAR G 2 CG-2- T� CAR PARKING � sa _ .d S - 2 CAR PARKING % n v �1(� 2 Cll�r i -_ S::� S S 9- W Sy $ 2-CAR CAR - h�n �, \ A2 V PARKING PARK408�I PARKING DAR�iv¢M:-I % �45'R — - \ \ \ \ \ \ NEW PAVE M NT_ NE N ' /' E/ �P0� \ \ \ \\\ S4 — — —imp — a� _ �' / VSMP PLAN FOR r7�� \ ` \��` \\\ \\ FAA \ 15' 404 \ , /'/ //� SOUTH PANTOPS Nam\ \ \ \ \\ \ \ \ETC — — y — — — — - 404 i \ \ \ \ I o�P I �\ _ DRIVE PARCEL NEW \ \ rro � �U�RAIL ■ 400 2 O R ALBEMARLE COUNTY, VIRGINIA \ \ \ \ \ 10ZZANI SEGMENT-wACCBLOCK \ ` , \ N / / SUBMISSION: 2022.04.27 REVISION: 0,92 3 \ ��� LOCATION \ \ EX. SANITARY SEWER--��--— ---- \\�\\ Af —�X�ANITARYr�yy—RER \ _- \ \ / \ FILE NO. 22.002 \\� � \ �\\\ \ SITE LAYOUT \ 368 20 0 20 40 60 Scale: C 3 1 "=20' -- -- -- - - - 6' PLANTING STRIP C9M—ii , Hill — —OWN .- -ti> iiorisr — r L — . Ili -will ,r :.. - ��, �.�� ■ � ■ .5L -��SL LL:��'--1��.��LL�F� i1e�� _ = �■ ��+: ' L ,��;,iSO�,`L` �' IIL LL IIL LL �L LL L�' LL LL L! c ■��•_ L .L���..e�Lti- � � ►1L LLLL cL! L�iL LLLL .i LL LLLL �LLiILL���I..LS�LL.LL��L.LLLLz�.LLLL �Le S �'�--5. LLLLL ; � "LE ELF i'�-�Le�eLL��'LL�� ��1_TS.. � ,�L��'il�� II.I_������.■I�LL.:ll55iLJl..s2LEl�.e�5�.:.����e:�e5l.�'�rLs�.=��-- =.�E��e�� ._��L!'__.���E:'�!E_!�%5!._ .. . — — — — — — — — — — - — ---------------------------- Aii EXISTING--- _ _ " - ------ / ---- - \ -- -- - -- - _ — NEW 'STATE ROUTE 1140 SOUTH PANTOPS DRIVE 2 I R/W WIDTH VARIES 35 MPH CG-6--�_ DOGOUSE o ` _ 4 \ ---- -- ------------ - --------- ---- --- - - _ _ _ Dill \ ------ ------ -- _- --- __-- _ _ -- - - - ----- - -- --- _-_ _ -- - _ -- APP m GUARDRAIL LOC TION \ 6' PLANTING STRIP �. a R E X�GR2 L 6' P V-� GUA DRAIL ro S PLANTING MO TYP. TRIP ... . F, ir.. ..,.,v �•1 'M Y !'H F r.'v., 't r\ l: i :41 d , r' :rPf e'•'i 4,k."' i i•l' \ ___ __ ___ __ __ __ __ .r. r. n• ..'. , 4... r i {.Yl..' •.d r �. � Y � i. .r:@ :'{.. i. rt .1 r{- �M1k: a,.1� 1,1 .}/ ... r . ..i ... 1. , rD, ar x n .. 1 ,: r ? .. .. s a. ..n rn .:1. ..5 .. fe.. J. •Y� p o<, r!'. .t. A' ON C+.W�\✓u Y.. r 'k .y ,..�wt. yi . ..,T Ya,ll .. ', r,.. r., .ril •p 1.� r ! .r': nr:. .� ♦ __ _ __ ___ __ __ [r. i. e — -- �175 \ N 7°30''0-1 V E as as a as as �� C1 S37°30'0�"W- \ _ _ 1T' — \ 20 �'h � 1 1 �� -- -- �__ \— ----�` 15.ee' --- \ 15. __ -- -- �\ aa�� aa� - --\ \ \ d0 _ _ _ — -_ a — — — — — — � --� 30r \ o _ ye RDA — — — — — — � 'S52° 0 123.74' \ � A a --------- - _ _ _ 5 I _ ----- --- \\ \ �\ \� as a� �as� a g o I — -- - - - -_ --- --- _ rSIGHT"DISTANCE ----__ z Y 1 � co / / / SHIMP ENGINEERING LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM U a 183 st &j VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. FILE NO. 22.002 GRADING & UTILITY PLAN bcale: 1 "=20 PROJECT DESCRIPTION, GENERAL NOTES, EROSION & SEDIMENT CONTROL NOTES, AND SEQUENCE OF CONSTRUCTION Compacted Soil i ) CLEAR WATER DIVERSION (CWD C 5 Not To Scale Compacted Soil DIVERSION DIKE DD C5 NOT TO SCALE PROJECT DESCRIPTION THIS SITE IS A WOODED LOT OFF ROUTE S PANTOPS DRIVE IN ALBEMARLE COUNTY BEING DEVELOPED INTO A 13 UNITS TOWN HOUSE DEVELOPMENT THE TOTAL AREA OF DISTURBANCE IS 1.15 ACRES. THE PROJECT INVOLVES THE FOLLOWING WORK ACTIVITIES: 1. THE CONTRACTOR SHALL OBTAIN ALL LOCAL AND STATE EROSION AND SEDIMENT PERMITTING REQUIREMENTS AND MAINTAIN ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. 2. INSTALLATION OF PERMANENT EROSION AND SEDIMENT CONTROL MEASURES AS SHOWN ON THE PLAN AND DETAILS. 3. GRADING AND PLACEMENT OF FILL SHALL BE IN GENERAL ACCORDANCE WITH THE PLAN. 4. ESTABLISHMENT OF PERMANENT STABILIZATION OF ALL DISTURBED AREAS. ADJACENT PROPERTIES THIS PROPERTY IS BORDERED ON THE SOUTH-WEST BY RIVANNA RIVER AND UNDEVELOPED LAND, AND NORTH-EAST BY S PANTOPS DRIVE. OFFSITE AREAS SOIL MAY NEED TO BE IMPORTED FROM THE SITE FROM SITES WHICH SHALL HAVE EROSION CONTROL PERMITS. SOILS THE SITE CONTAINS THE FOLLOWING SOIL TYPES: 13E - CATOCTIN SILT LOAM, 25 TO 45, VERY STONY, HSG B 23B - YADKIN CLAY LOAM, 7 TO 15 PERCENT SLOPES, HSG B 71B - RABUN CLAY LOAM, 2 TO 7 PERCENT SLOPES, HSG B 71D - RABUN CLAY LOAM, 15 TO 75 PERCENT SLOPES, HSG B 71E - RABUN CLAY LOAM, 25 TO 45 PERCENT SLOPES, HSG B 88 - UDORTHENTS, LOAMY, 2 TO 25 PERCENT SLOPES W - WATER CRITICAL AREAS THE CRITICAL AREA ON THE SITE IS THE EXISTING CHANNEL WITHIN THE SITE AND COUNTY CIS PRESERVED SLOPE. CONTRACTOR TO USE EXTRA CAUTION TO PREVENT SEDIMENT FROM ENTERING THIS CHANNEL. EROSION & SEDIMENT CONTROLS 1. SAFETY FENCE: A PROTECTIVE BARRIER INSTALLED TO PROHIBIT UNDESIRABLE USE OF AN EROSION CONTROL MEASURE. STD. AND SPEC. 3.01. 2. CONSTRUCTION ENTRANCE: INSTALL AND MAINTAIN A CONSTRUCTION ENTRANCE, AS NECESSARY, THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.02 AND CONFORMS WITH THE REQUIREMENTS OF THE EROSION & SEDIMENT CONTROL PLAN. 3. SILT FENCE: INSTALL AND MAINTAIN SILT FENCE THAT MEETS THE REQUIREMENTS OF STD. AND SPEC. 3.05. THIS SILT FENCE SHALL BE INSTALLED AS SHOWN ON THE EROSION & SEDIMENT CONTROL PLAN AND ACCOMPANYING DETAILS FOR THE PURPOSE OF INTERCEPTING SILT -LADEN RUNOFF BEFORE IT IS DISCHARGED FROM THE SITE. THE SILT FENCE SHALL BE INSPECTED AND MAINTAINED TO ENSURE CONTINUED PERFORMANCE. 4. TEMPORARY SEEDING: TEMPORARY SEEDING SHALL BE APPLIED TO ALL DENUDED AREAS WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY OR MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. TEMPORARY SEEDING SHALL BE APPLIED IN CONFORMANCE WITH STD. AND SPEC. 3.31. 5. PERMANENT SEEDING: PERMANENT SEEDING SHALL BE APPLIED TO AREAS DELINEATED ON THESE PLANS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. PERMANENT SEEDING STABILIZES DISTURBED AREAS AND ENHANCES THE BEAUTY OF THE SITE. 6. MULCHING: APPLICATION OF PLANT RESIDUES OR OTHER SUITABLE MATERIALS TO THE SOIL SURFACE TO PREVENT EROSION AND FOSTER THE GROWTH OF VEGETATION. ORGANIC MULCHES (STRAW) HAVE BEEN FOUND TO BE THE MOST EFFECTIVE. 7. DUST CONTROL: CONDUCT DUST CONTROL OPERATIONS NECESSARY TO MET THE REQUIREMENTS OF STD. & SPEC. 3.39 AS REQUIRED TO CONTROL SURFACE AND AIRBORNE MOVEMENT OF DUST. 8. OUTLET PROTECTION: RIP -RAP SHALL BE PROVIDED AT THE OUTFALL OF CONVEYANCE CHANNELS, CULVERTS, AND STORM SEWERS IN CONFORMANCE WITH STD. AND SPEC. 3.18. OUTLET PROTECTION SHALL BE INSTALLED WITH ACCOMPANYING STORM SEWERS AND SHALL BE INSPECTED AFTER EACH RAINFALL EVENT AND REPAIRED IF NECESSARY. ANT SEDIMENT BUILD UP SHALL BE REMOVED. 9. TEMPORARY DIVERSION DIKE (DID) - 3.09 A TEMPORARY DIVERSION DIKE SHALL BE USED TO BOTH DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS AWAY FROM UNPROTECTED DISTURBED AREAS TO A STABILIZED OUTLET AND TO DIVERT SEDIMENT -LADEN RUNOFF FROM A DISTURBED AREA TO A SEDIMENT -TRAPPING FACILITY. LOCATION AND DETAILS ARE SHOWN ON THE PLANS 10. TEMPORARY SEDIMENT TRAP ST - 3.13 A SMALL PONDING AREA, FORMED BY CONSTRUCTING AN EARTHEN EMBANKMENT WITH A STONE OUTLET ACROSS A DRAINAGE SWALE, TO DETAIN SEDIMENT -LADEN RUNOFF FROM SMALL DISTURBED AREAS FOR ENOUGH TIME TO ALLOW MOST OF THE SUSPENDED SOLIDS TO SETTLE OUT. MAXIMUM EFFECTIVE LIFE IS 18 MONTHS. STD. AND SPEC. 3.13. PERMANENT STABILIZATION AND SEQUENCE OF CONSTRUCTION THE FOLLOWING ARE THE PROPOSED MANAGEMENT STRATEGIES AND DETAILED SEQUENCE OF CONSTRUCTION: PHASE 1 1. INSTALL CONSTRUCTION ENTRANCE OFF S PANTOPS DR AS SHOWN ON C6. TRUCKS SHALL BE CLEANED PRIOR TO LEAVING SITE CONSTRUCTION ACTIVITY ENTRANCE LOCATION : (38.028942,-78.451065) 2. INSTALL SEDIMENT TRAP AS SHOWN ON THIS PHASE AND ITS DIVERSION 3. INSTALL SILT FENCE AND PERIMETER CONTROLS. 4. INSTALL TEMPORARY MEASURES SUCH AS DIVERSION AND CLEAN WATER DIVERSION 5. THE CONTRACTOR SHALL REMOVE THE DIVERSIONS AND SILT FENCE OF FINAL SITE STABILIZATION. PHASE 2 STAGE 1: 1. CONTACT THE ENGINEER AND ALBEMARLE COUNTY FOR INSPECTION AND APPROVAL OF ALL E&S CONTROL MEASURES. 2. UPON APPROVAL OF ALL E&S CONTROL MEASURES, BEING CLEARING THE SITE, INSTALL RETAINING WALL, SILT FENCE AND STOCKPILE MASS GRADING. 3.MAINTAIN ALL E&S CONTROL MEASURES AND APPLY TEMPORARY SEEDING AND DUST CONTROL AS NEEDED. STAGE 2: 1. INSTALL NEW SANITARY MAINS. 2. BEGIN INSTALLATION OF NEW WATERLINE AND STORM SEWER. 3. MAINTAIN PERIMETER CONTROLS AS MASS GRADING PROCEEDS. 4. AS PARKING AREAS ARE BROUGHT TO FINAL GRADE, MAINTAIN CONSTRUCTION ROAD STABILIZATION. 5. AS THE REMAINING SITE AREA IS BROUGHT TO GRADE, APPLY MULCHING, TEMPORARY SEEDING AND PERMANENT SEEDING AS SHOWN IN THE DRAWING. STAGE 3: 1. INSTALL SILT FENCE WHERE NEEDED FOR ANY FINAL PERIMETER GRADING (PRIMARILY FOR THE PRESERVED SLOPE AREA) 3. DURING HOUSE CONSTRUCTION, AREAS THAT ARE NOT BEING DISTURBED MUST REMAIN STABILIZED. INSTALL SILT FENCE PROTECTION FOR LOTS UNDER CONSTRUCTION. FINAL 1. MAINTAIN CONTROLS UNTIL SITE STABILIZATION AND COUNTY INSPECTOR HAS APPROVED CONTROL REMOVAL. 2. WHEN SITE HAS REACHED STABILIZATION, REMOVE PERIMETER CONTROLS. CONSTRUCTION MUST BE REMOVED OUT BY CONTRACTOR. REMOVAL OF TEMPORARY PRACTICES FOR ALL TEMPORARY PRACTICES LISTED ABOVE THE CONTRACTOR SHALL REMOVE ANY TEMPORARY MEASURES SUCH AS DIVERSIONS OR SILT FENCE WITHIN 30 DAYS OF FINAL SITE STABILIZATION. THIS REQUIREMENT MAY BE MODIFIED BY THE EROSION AND SEDIMENT CONTROL INSPECTOR. CONSTRUCTION MAINTENANCE THE FOLLOWING CONSTRUCTION MAINTENANCE PRACTICES SHALL BE FOLLOWED AT THE SITE. 1. ALL E&S CONTROL MEASURES WILL BE CHECKED DAILY AND AFTER EACH SIGNIFICANT RAIN EVENT. ALL DEFICIENCIES IDENTIFIED DURING THESE INSPECTIONS SHALL BE CORRECTED AS SOON AS PRACTICABLE. 2. THE SILT FENCE BARRIER SHALL BE REGULARLY CHECKED FOR UNDERMINING, DETERIORATION OR SIGNIFICANT EROSION. SEDIMENT SHALL BE REMOVED AFTER EACH STORM EVENT AND WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF THE HEIGHT OF THE CONTROL. 3. THE CONTRACTOR IS RESPONSIBLE FOR ADHERING TO ALL MAINTENANCE REQUIREMENTS SET FORTH IN THE CURRENT EDITION OF THE VIRGINIA SEDIMENT AND EROSION CONTROL MANUAL, OTHER APPLICABLE COMMONWEALTH OF VIRGINIA REGULATIONS AND THE PROJECT SPECIFICATIONS. 4. ALL SEEDED AREAS WILL BE REGULARLY CHECKED TO ENSURE THAT A GOOD STAND OF GRASS IS MAINTAINED. 5. AREAS WITH RIP -RAP SHOULD BE REGULARLY INSPECTED TO DETERMINE IF HIGH FLOWS HAVE DAMAGED THESE CONTROLS OR CAUSED EXCESSIVE SEDIMENT DEPOSITION. ALL AREAS SHALL BE MAINTAINED IN ACCORDANCE WITH THE REQUIREMENTS OF THIS E&S CONTROL PLAN. ENVIRONMENTAL CONTROLS 1. CONTRACTOR SHALL PROVIDE AND MAINTAIN ALL ENVIRONMENTAL CONTROL MEASURES SO AS TO COMPLY WITH LOCAL ORDINANCES, STATE AND FEDERAL LAWS AND REGULATIONS APPLICABLE TO WATER POLLUTION IN WATERS OF THE STATE AND IN INTERSTATE WATERS. 2. CONTRACTOR SHALL MINIMIZE THE POTENTIAL FOR AIR POLLUTION BY THE USE OF EMISSION CONTROL EQUIPMENT ON CONTRACTOR OPERATED EQUIPMENT, SHUT -DOWN OF MOTORIZED EQUIPMENT WHEN NOT IN USE, AND ACTIVELY CONTROLLING DUST EMISSIONS THROUGHOUT THE PROJECT. EROSION & SEDIMENT CONTROL PERMITTING CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL LOCAL AND STATE EROSION AND SEDIMENT CONTROL PERMITS AND MAINTAINING ALL EROSION AND SEDIMENT CONTROLS IN ACCORDANCE WITH THE PERMIT REQUIREMENTS. GENERAL NOTES 1. THE INFORMATION AND DATA SHOWN OR INDICATED WITH RESPECT TO THE EXISTING UNDERGROUND UTILITIES AT OR CONTIGUOUS TO THE SITE ARE BASED ON INFORMATION AND DATA FURNISHED TO THE OWNER AND ENGINEER BY THE OWNERS OF SUCH UNDERGROUND FACILITIES OR OTHERS. THE OWNER OR ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF SUCH INFORMATION OR DATA. THE CONTRACTOR SHALL HAVE FULL RESPONSIBILITY FOR CONFIRMING THE ACCURACY OF THE DATA, FOR LOCATING ALL UNDERGROUND UTILITIES, FOR COORDINATION OF THE WORK WITH OWNERS OF SUCH UNDERGROUND UTILITIES DURING CONSTRUCTION, FOR THE SAFETY AND PROTECTION THEREOF AND REPAIRING ANY DAMAGE THERETO RESULTING FROM THE WORK. ALL OF THESE CONDITIONS SHALL BE MET AT NO ADDITIONAL COST TO THE OWNER. THE CONTRACTOR SHALL CONTACT "MISS UTILITIES" OF VIRGINIA AT 1-800-552-7001 PRIOR TO THE START OF WORK. 2. WHEN WORKING ADJACENT TO EXISTING STRUCTURES, POLES, UTILITIES, ETC., THE CONTRACTOR SHALL USE WHATEVER METHODS THAT ARE NECESSARY TO PROTECT STRUCTURES FROM DAMAGE. ANY DAMAGE CAUSED BY THE CONTRACTOR OR ITS SUBCONTRACTORS SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO REPAIR OR REPLACE. THIS EXPENSE IS THE CONTRACTOR'S RESPONSIBILITY. 3. REPLACEMENT OR REPAIR OF DAMAGED STRUCTURES SHALL BE AT THE CONTRACTOR'S EXPENSE. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING SITE STRUCTURES FROM DAMAGE AND COORDINATING WORK SO THAT THE OWNER CAN MAKE NECESSARY ARRANGEMENTS TO MODIFY/PROTECT EXISTING STRUCTURES FROM DAMAGES. 5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING ALL UTILITY OWNERS, ADJACENT LAND OWNERS WHOSE PROPERTY MAY BE IMPACTED AND THE VIRGINIA DEPARTMENT OF TRANSPORTATION PRIOR TO COMPLETING ANY OFF -SITE WORK. 6. CONTRACTOR SHALL NOTIFY AND COORDINATE ALL WORK INVOLVING EXISTING UTILITIES WITH UTILITY OWNERS, AT LEAST 72 HOURS PRIOR TO THE START OF CONSTRUCTION. 7. ALL EXCAVATION FOR UNDERGROUND PIPE INSTALLATION MUST COMPLY WITH OSHA STANDARDS FOR THE CONSTRUCTION INDUSTRY (29 CFR PART 1926). 8. THE CONTRACTOR SHALL VERIFY THE LOCATIONS OF ALL BOUNDARIES, BUILDINGS, VEGETATION, AND OTHER PERTINENT SITE ELEMENTS. CONTRACTOR SHALL IMMEDIATELY REPORT ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND CONTRACT DOCUMENTS TO THE OWNER AND ENGINEER. 9. CONTRACTOR SHALL SUBMIT FOR THE APPROVAL OF THE OWNER SUBMITTALS OF ALL SPECIFIED MATERIALS LISTED IN THE PLANS, TO INCLUDE SHOP DRAWINGS, MANUFACTURER'S SPECIFICATIONS AND LABORATORY REPORTS. THE OWNER'S APPROVAL OF SUBMITTALS WILL BE GENERAL AND WILL NOT RELIEVE THE CONTRACTOR FROM THE RESPONSIBILITY OF ADHERENCE TO THE CONTRACT AND FOR ANY ERROR THAT MAY EXIST. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL NECESSARY PERMITS, INSPECTIONS, BONDS, AND OTHER RELATED ITEMS IN ACCORDANCE WITH LOCAL AND STATE POLICY. STORMWATER MANAGEMENT NOTES: WATER QUALITY: 1.PER THE VRRM SPREADSHEET, NO FURTHER TOTAL PHOSPHOROUS TREATMENT IS REQUIRED. 2.WATER QUALITY WILL BE ADDRESSED BY THE DEDICATION OF 4.0 ACRES LAND INTO A SWM FOREST/OPEN SPACE EASEMENT. WATER QUANTITY THE RUNOFF FROM THIS DEVELOPMENT IS RELEASED INTO THE NATURAL CHANNEL IN COMPLIANCE WITH QUALITY REGULATION DETAILED IN 9VAC25-870-66-B ( CHANNEL PROTECTION ) AND 9VAC25-870-66-B (FLOOD PROTECTION): CHANNEL PROTECTION: A PORTION OF CONCENTRATED RUNOFF FLOWING THRU THE SITE SHALL BE ROUTED VIA NEW STORM DRAINS INTO THE NATURAL CHANNEL WHICH WILL RELEASE RUNOFF AT RATES WHICH COMPLY WITH THE ENERGY BALANCE EQUATION 9VAC25-870-66-B(3). WATER QUANTITY WILL BE ADDRESSED BY THE FOOD PROTECTION: WE ARE RELEASING RUNOFF A NATURAL CHANNEL WHICH DOES NOT FLOOD. THIS NATURAL CHANNEL OUTLETS INTO THE RIVANNA RIVER, AT WHICH LIMITS OF ANALYSIS PER 9VAC25-870.C.3.a ARE MET BECAUSE THIS SITE IS LESS THAN 1% OF THE TOTAL RIVANNA RIVER WATERSHED AT THIS POINT. NOTE TO REVIEWER: THE CHANNEL IS CURRENTLY BEING SURVEYED, WE WILL RUN FLOOD CALCULATION WHEN THIS SURVEY DATA IS RECEIVED, BUT FOR THIS FIRST SUBMITTAL, WE CAN INFER FROM OBSERVATION, AND PRELIMINARY ANALYSIS THAT THE CHANNEL DOES NOT FLOOD DURING THE 10-yr STORM, AND OUR ADDED RUNOFF DOES NOT CAUSE FLOODING. MINIMUM STANDARDS (MS) All applicable Virginia Erosion and Sediment Control Regulations and Minimum Standards shall be adhered to during all phases of construction. These include, but are not limited to the following: 1. STABILIZATION OF DENUDED AREAS: Permanent or temporary soil stabilization shall be applied to bare areas within seven days after final grade is reached on any portion of the site. Temporary soil stabilization shall be applied within seven days to denuded areas that may not be at final grade, but will remain dormant or undisturbed for longer than 30 days. Permanent stabilization shall be applied at areas that are to be left dormant for more than 1 year. 2. STABILIZATION OF SOIL STOCKPILES: During construction of the project, soil stockpiles shall be stabilized or protected with sediment trapping measures. The applicant is responsible for temporary protection and permanent stabilization of all soil stockpiles on site as well as soil intentionally transported from the project site. 3.PERMANENT VEGETATIVE COVER A permanent vegetative cover shall be established on denuded areas not otherwise permanently stabilized. Permanent vegetation shall not be considered established until a ground cover is achieve that, in the opinion of the county Inspector, is uniform and mature enough to survive to inhibit erosion. 4. TIMING & STABILIZATION OF SILT TRAPPING MEASURES: Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap sediment shall be constructed as a first step in any land disturbing activity and shall be made functional before upslope land disturbance takes place. 5. STABILIZATION OF EARTHEN STRUCTURES: Stabilization measures shall be applied to earthen structures such as dams, dikes and diversions immediately after installation. & SEDIMENT TRAPS AND BASINS: A sediment basin shall control surface runoff from disturbed areas that is comprised of flow from drainage areas greater than or equal to three acres. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading for the land disturbing activity. The outfoll device or system device shall take into account the total drainage area flowing through the disturbed area to be served by the basin. 7. CUT AND FILL SLOPES: Cut and fill slopes shall be designed and constructed in a manner that will minimize erosion. Slopes that are found to be eroding excessively within one year of permanent stabilization shall be provided with additional slope stabilizing measures until the problem is corrected. & CONCENTRATED RUN-OFF DOWN CUT OR FILL SLOPES: Concentrated runoff shall not flow down cut or fill slopes unless contained within an adequate temporary or permanent channel, flume, or slope drain structure. 9.WATER SEEPS FROM A SLOPE FACE: Whenever water seeps from a slope face, adequate drainage or other protection shall be provided. 10.STORM SEWER INLET PROTECTION: All storm sewer inlets that are made operable during construction shall be protected so that sediment -laden water cannot enter the conveyance system without first being filtered or otherwise treated to remove sediment. Y 9 11. STABILIZATION OF OUTLETS: Before newly constructed stormwater conveyance channels are made operational, adequate outlet protection and any required temporary or permanent channel lining shall be installed in both the conveyance channel and receiving channel. 12. WORK IN LIVE WATERCOURSES: When work in a live watercourse is performed, precautions shall be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. Nonerodible material shall be used for the construction of causeways and cofferdams. Earthen fill may be used for these structures if armored by nonerodible cover materials. 13.CROSSING A LIVE WATERCOURSE: When a live watercourse must be crossed by construction vehicles more than twice in any six month period, a temporary stream crossing constructed of nonerodible materials shall be provided. 14. APPLICABLE REGULATIONS: All applicable federal, state and local regulations pertaining to working in or crossing live watercourses shall be met. 15. STABILIZATION OF BED AND BANKS The bed and banks of a watercourse shall be stabilized immediately after work in the watercourse is completed. 16.UNDERGROUND UTILITIES: Underground utilities shall be installed in accordance with the following standards in addition to other criteria: a.No more than 500 linear feet of trench may be opened at one time. b.Excavated material shall be placed on the uphill side of trenches c.Effluent for dewatering operations shall be filtered or passed through approved sediment trapping device, or both, and discharged in a manner that does not adversely affect flowing streams or offsite property. d.Material used for backfilling trenches shall be properly compacted in order to minimize erosion and promote stabilization. e.Restabilization shall be accomplished in accordance with these regulations. f. Applicable safety regulations shall be complied with. 17.CONSTRUCTION ACCESS ROUTES: Where construction vehicle access routes intersect paved public roads, provisions shall be made to minimize the transport of sediment by vehicular tracking onto paved surfaces. Where sediment is transported on to a public road surface, the road shall be cleaned thoroughly at the end of each day. Sediment shall be removed by shoveling or sweeping and transported to a sediment control disposal area. Street washing shall be allowed only after sediment is removed in this manner. This provision shall apply to individual lots as well as to larger land disturbing activities. 18.TEMPORARY E&S CONTROL MEASURE REMOVAL: All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization or after temporary measures are no longer needed, unless otherwise authorized by the local program authority. Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sediment. 19.ADEQUACY OF RECEIVING CHANNELS: Properties and waterways downstream from the development site shall be protected from sediment deposition, erosion and damage, due to increases in volume, velocity and peak flow rates of stormwater runoff for the stated frequency storm of 24-hour duration. SHIMP ENGINEERING2 LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM U VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. FILE NO. ES&C NARRATIVE 22.002 C5 - \ 7 /------------------------- I LIMITS OF DISTURBANCE I °30 00 E 15. \ mom r ,�� WIC - _ _.�� J J°04 o1- Emma IRS 82 11 �I 11 111, III i� .�:■ :I =I-■■�C=,111 ,. i IIII IjI1111j1111 �E�■111�1�■■��E ���: ■��■.IE ��F__���I� '��11� • ..� IENMIsG ��-ISI m-•.■I I ■� 11 I�Ii►.'�.11e�� I 11.11 1111 I II r III �I _ - ._■. I-!��■E�' .�°�11 ' 1111' =�I 11 '11�_6,-3..,.:-, �E�I' I►� SOIL EROSION & SEDIMENT CONTROL SYMBOLS SYMBOL NO. TITLE KEY 3.02 CONSTRUCTION ENTRANCE CE 3.03 CONSTRUCTION ROAD STABILIZATION CRS — X X X X — 3.05 SILT FENCE SF 3.10 SAFETY FENCE SAF ❑ ❑ 3.09 TEMPORARY DIVERSION DIKE DD 3.09 CLEAN WATER DIVERSION �W [DRAWN TO SCALE] 3.13 TEMPORARY SEDIMENT TRAP ST ' � LIMITS OF DISTURBANCE: 1.15 Acres zz EX DI-2 r _ ---�----------------� - EXISTINGPAVEMENT\---------�- `� _ _ I STATE ROUTE 1140 SOUTH PANTOPS DRIVE \ R /W WIDTH VARIES 35 MPH� SAF (C&8_ �I_� w C5 \ El A \ I o - - ----------- - \ �52°30'00"E 90.00' =175.43, --- _ ----`------- 15 1 J — — I �. 30'6-1 "E � C�3 d0 1 �y v Nv v�_ v v v_ 4zo V �—� _ ra i n a g e d i m t .8 AC S \ 'z \ Weir \qnt \� 0 _ \ 412 \ \ \ Y 4.9� ft 408a / \ \\ \ N ¢ 3so \ Fr== —-400.:40-2—�5 � 402 n L ot D- - — — / a� \\ \\ \F+� 404 v - - �F \ —— — �vv '47 \\ \\y+ 404 ---- \ 2 \ ,i 400 I / \ \ T\ \ \ \\� \\/--x \`\\\ 1 388— ----A —-------_ ATION EX. SANITARY \ \ \ P>J no APPlIft. LOCATION \\ ANf I ARY EWEl \\ 0 20 40 60 SHIMP ENGINEERING2 LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM IrA � a Lic Npp.45183 Lam. ur1 ,I21 o4J VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. FILE NO. 22.002 EROSION AND SEDIMENT CONTROL PLAN PHASE 1 C6 i SOIL EROSION & SEDIMENT CONTROL SYMBOLS SYMBOL N0. TITLE KEY oz '6' PLANTING STRIP �� € --------- i -( LIMITS OF \ DISTURBANCE \ \ \ 6' PLANTING STRIP i 1 • L� yl 11 — — — — — — • — — 7ju a. W. �1JL_ij r��--_�� , C=�� _•■� __��, ��, 111 I, -■III■11111■111�I■��IIE��'�:Ip�l 11' ■1111►�I�11111 ��■I■II�E �� ••11 ■111� 14- aI-. �.. 3.02 CONSTRUCTION ENTRANCE CE 3.03 CONSTRUCTION ROAD STABILIZATION CRS —X —X —X —X — 3.05 SILT FENCE SF 3.10 SAFETY FENCE SAF y y 3.09 CLEAN WATER DIVERSION �W [DRAWN TO SCALE] 3.13 TEMPORARY SEDIMENT TRAP ST 3.18 OUTLET PROTECTION OP TS 3.31 TEMPORARY SEEDING TS PS 3.32 PERMANENT SEEDING PS 3.35 MULCH MU DC 3.39 DUST CONTROL DC LIMITS OF DISTURBANCE: 1.15 Acres �- �i�_=;-- . r ;y � ►w ���4 �� , ate+ � _ _ _ ..�. '. _._"" i - _ '.`_"---•___ � �`` Poo- ` - i ■ .- - ��-i .--� _:.■ - _ _ ...■:EIS p1�� ► s� �.�. ■■ ■ ■ _ ■■I CIE ■I■ -■gyp IF - �!' ►� 15■ ' :E:11'�IEEI=111��IE■��IIp131:p . _ p-�I■�Eg11�1'�y11�'IIIs•I�eIeIs1L1 I r111i�1= 555�, I`■I. �[55, , CIE IEI■IF�►�L11�1 �i11.1 �p11� 1111 ■I �.�� • . :: :. • , Wall - -E:I■I-.hE��, Ali ■I■ ;.IIIIp�11 s��.�..�15E Ip15 pI11�.Is1��� = • . ■■ I ■��i1: ■ E_■ EI -5 .pp ■ SI I�.�� ,I 11 1111 ■IS s ® . • 51==i�51- i !I• pp■�' ■ ,�=� - I,I�!■■:� I��I�i� ej 11 Ip,Ir I :... : • • : •:. ;,. , .. �P. _ ._ _ • - I .!I I ■■I � is p I_ -1p1 _ --- �� ,I,� ,�. Ip.1 15 p ►�S ., �. - : I ` pIs-.pit■- I�� is ■i 11 I �►!i 11■I 11 I I - � � .. •., ►51i�jag[j1.■■i�_-�■ 11 �■ ►111■ III a �I , hlipE..��,�pEE'1=1�IIs�'�;�, �� ._�. .- � I�sICEii���,■I � � ,,, •• ;. , , �;�-_ _ ! _ --- _ ��- o i� a�E1`I ;�CId ; :'E;=Ei�E = . ��, ... , �11I11i1y11 •, :,�- _ - - _ _ - - - ..�."...•..... .. , GC III �I-�';I■ IpIE� EI. I Ia � � Ifs E ,111■ 1�► _��,- � _ �� •_ ..-----•.. _ __� ��1� i�������_ �1, .� • .E_■ ■ 115 I .yEp I 'I�ICII o � �� ��, E - :.• _ s.�_ —=.. ••. _��..� ��_ �� 1=1 Ehii I-�;�Ii� I EL -I , I I `►� :, ' � ' �_'•_■a■i �■ ��= • •• • I �' _i�� •�" ••--.. ; _ _` - �, ; =�:; 1�■is 11 I - �� I_ .I . FL !AllNMI 01,E IG I �� ■ .I--- -- _-- � •, -■I�--■r=�-�' �5s.-. - _ © .. , . . IS ►�I- � -11 g11,p Ip .�pf1 111� I�11 11 � ' � ■ 11► 11�'■ � S=-IS•■--IS_=�■ I� ■■ 2..■__ :� - ►�� 'I i►■■,� �Is ,,5 , ds � 11 11 I� - !.E ., .. is - I ■E. � �5 is I !� _- -i Ip- i■ �L �,Opi1,,■L-1�....-� 15 I,� , 11!I 11 11 .11 11 i!■ IEI EIII F=■ SI■I Ip I Grp. p �iE■ ESE pp ICI. �r�0... ,r■., , ,I�pp11► II�p1�'I�,pil�apl�!`�'Ip► �' ��'11111CpI1111pE111i „: = • iE ps15 LIIS' ill IiS p■IF Ip111■■I SI r�r -SIII �► _ IIIE I!EIs� i1�= �C.. 11 15 11 ►! 11 �11 EI IE 11 i1 ■�IIi :IL ■SSE ■ 11 S^ !s AEI - • •, 11, Ie 011.E 1,111 ICIR .Ip11 11 IIIE IIi1 ■ -_ �I p111 3p!I- ,,, ; . - . I■ I■ IIe11 pCs. �pls ,,IC , .11 ,I .I� 111� ICIh .. p11 III■ :p1 =■ ■� 11 11 �I �I I■ E_ - I� c1:1 11i1 I I Mt C If11 1111 ,�C1 11 1111 IIIi IIIIj II�IIIIIi11111fIjIL�f�111111jI11fIjI111Ei1sI1i1■ 11111.I ■� , ■■ - IIG'11 A -Maw EII�Is r �IpI,� �'I� ICI� I�' _ _ _ ■Ii IIi:1 ■III �11- 15- i� - fi0 11 11 111 1111 1111 E!I■ 7ii' I►: ■,� ■■ IORION[.� 11 I, _ ■__ I 11 ! I - EI I 11 11 I --�� 111 ROII j� ,IE` , IIIIIppI�I;�I�a1 N011 r,�i1 -- ICI,_�`1i1.■11�■i■I_III 11■i 11■I 1111 11 I� I .I •11 I■I �Cp11 I. _C d� 1111, I INN '�►111 �► 11�!I i�, Ip►1C 1111 11►� ■ ,� ■■I�*_ -11 1 15 ■11 IS,, ,EhII11111111 I IMF i11111 11111, I■I� �111C 111 . 11'�e IEi►, e1�- �p� - - - - _ lml"51- - 1■ IS, � ��■ ■I►�I II. I is ■ 11 111 �11 11 �s 1N ,I' 11 1 d111 1111 III 11, . pC11 I .. , ::, - _ - ■.�p -I 11 IIj1- cC_I ■I SHIP,C 11 11�. ,III ,rsp'1 0611 fl�s •` p :p151 SIC►IR'.,Eis��'i■1111.�►111 11111�1 IG�IS 1111 1111 11'11 `► ,pE�'s J _ ��_.` p, I■ - _ ... _ -�■ y1 , _1E I �I �01a Ip11.Ie�� .i1 �I . `c SI . _� - .■ . IS '�' _ . : , . , ._ 11 c1 .51 111 ■�I I� f1 i11. 11 ►1 s. ,� r . �.. .■ -S -I■ � � .,�_ • - I I I � . , 61 I� .. - ,�E�I.1�15 IIIIp .►I�;I Is�'�fEsI111�p �. -- s- ■EIs�1 '�� �ll�■1=- `iE11:���5� . I IIti1 IIIf �lS� 1►1 ,. �`., ,�, . I E . ■■C IF 11 �i► fIQ� �efi •11 �ppis yp51 111! `pis ■� _ r� _.I 5 E■ _ �` ,11 �. :�� I, I, I11 �! pp■i IIIC I ■11 ■tEs�` ■_ �I ■ i� i �iz'1€1 ■IEi ; S 11 111 �I , I� C111EI"PISI �ISLI,ipp IIIpa CL� ,■I■■ �._ _I Z _S ■CIIiiC3C�3�■,,. _ S_ _ ■�3� -f. �` . . ► S 11 , a �■� .11 �•'I EI ■. I� SI■■ . _-- � __-.�■ _ ■i1 ■ I■ � - ... � : E� i 3� `�■11 s. 11 IIIC Y� ��■1EI11���!IIpIpIR f1,` CI�,� ECC�'. sp �■►�\,ppSE .,�,■i 5,■■ 11�'sEF11`� �■: __ �� � _.��■■�E_:.Ipl- - I:IIp �SSI� •I Zpii �1511�E:s1'■'S�'IE ■i STONE 70' MIN. CONSTRUCTION ACCESS 3" SM-2A ASPHALT TOP COURSE EXISTING 277 PAVEMENT 6" MIN. 21A AGGREGATE BASE PROFILE STONE 70' MIN. CONSTRUCTION ASPHALT PAVED ACCESS -- A WASHRACK FEXISTING 2% 2% PAVEMEN j 1 2% ' 2' MIN.* *MUST EXTEND FULL WIDTH POSITIVE DRAINAGE OF INGRESS AND EGRESS TO SEDIMENT OPERATION TRAPPING DEVICE PLAN 12' MIN. POSITIVE DRAINAGE 27 TO SEDIMENT TRAPPING DEVICE FILTER CLOTHS _-- SECTION A -A A minitntan water tap of 1 itch must be ntstalled witlt a ntinimunt 1 inch ballcock shutoff vahre supplying a wash hose with a diameter of 1.5 itches for adequate coustant pressure. Rash water must be carried away from the entrance to an approved settlittg area to remove sediment. All se(Tnttent shall be prevented from entering storm drains, clitches or watercourses. PAVED WASH RACK NO SC.- I -1)PAVED CONSTRUCTION ENTRANCE (CV) C$ Not To Scale Sediment Trap Design Data No. A B C Ho(ft) H (ft.) Z (ft.) W(ft) DA Wet Vol. D1 WetVol. Dry Vol. D2 Dry Vol. (Acs.) (Req.) (ft.) (Prov.) (Req.) (ft.) (Prov.) 1 400.5 402.5 404.0 4.0 5.0 3.50 0000 4.5 0.83 55.6 2.0 55.7 55.6100 1.5 59.0 ORIGINAL GROUND ELEV. Area 2 DRY STORAGE D2 67 CU, YD./AC E Area 1 WET STORAG 67 CU. YD./AC E (EXCAVATED) 1/ FILTER CLOTH ORIGINAL GROUND EL=C ELEV. -SEE PLATE 3.13-1 COARSE AGGREGATE , CLASS I RIPRAP CROSS SECTION OF OUTLET ® CLASS I RIPRAP LENGTH (IN FEET) = 6 " DA (IN ACRES) A_ sL DIVERSION DIKE � A�COARSE AGGREGATE EXAll FILTER CLOTH **COARSE AGGREGATE SHALL BE VDOT #3, #357 OR #5 OUTLET (PERSPECTIVE VIEW) IM 3.13 MINIMUM TOP WIDTH (W) REQUIRED FOR SEDIMENT TRAP EMBANKMENTS ACCORDING TO HEIGHT OF EMBANKMENT (FEET) t W .1 ------ __--- 1.5 0.5 20 2.0 1.0 2:0 1.5 1.5 25 so 2n 15 3.5 2S 3.0 ao 4.0 10 3.0 ENfAWiFD IMA SouI Va. DSWC P1aw 3.13-1 CONSTRUCTION OF A SILT FENCE (WITH WIRE S UPPOR T) 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. TRENCH UPSLOPE ALONG THE LINE OF POSTS. w 3. ATTACH THE FILTER FABRIC TO THE WIRE FENCE AND EXTEND IT INTO THE TRENCH. 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. 2 )SILT FENCE (SF) W. WIRE SUPPORT C$ Not To Scale C PERSPECTIVE VIEW PLASTIC FENCE SOURCE: CONWED PLASTICS VDOT ROAD AND BRIDGE STANDARDS VA. DSWC r �1 7:1 PERSPECTIVE VIEW METAL FENCE PLATE. 3.1-1 1992 3.35 Source: Va. DSWC TABLE 3.35-A ORGANIC MULCH MATERIALS AND APPLICATION RATES RATES: ivILJI.CHF�. NOTES: Per Acre Per 1000 sq. ft. Straw or Hay 1� • 2 tons 70 - 901bs. Free from weeds and coarse (Minimum 2 matter. Must be anchored. tons for Spread with mulch blower winter rover) or by hand. Fiber Mulch Minimum 35 lbs. Do not use as mulch for 1500 lbs. winter cover or during hot, dry periods.* Apply as slurry. Corn Stalks 4 - 6 tons 185 - 275 lbs. Cut or shredded in 4-6" lengths. Air-dried. Do not use in fine turf areas. Apply with mulch blower or by hand. Wood Chips 4 - 6 tons 185 - 275 lbs. Free of coarse matter. Air- dried. Treat with 121bs nitrogen per ton. Do not use in fine turf areas. Apply with mulch blower, chip handler, or by hand. Bark Chips 50 - 70 ca. 1-2 cu. yds. Free of coarse matter. Air - or yds. dried. Do not use in fine Shredded turf areas. Apply with Bark mulch blower, chip handler, or by hand. ' When fiber mulch is the only available mulch during periods when straw should be used, apply at a minimum rate of 2000 lbs./aa or 45 lbs./1000 sq. ft. 3 MULCHING MU C$ Not To Scale TABLE 3.31-C TEMPORARY SEEDING PLANT MATERIALS, SEEDING RATES, AND DAMS N N m w SEEDING RATE NORTHa SOUTHb PLANT all 5Il 8/15 2/IS s/1 9/1 SPECIES CHARACTERISTICS Ame 1000 fly m to to to m ro 4/3o ans un ono vn 11ns OATS 3 bu. (up to 100 Ibs.. 2 Ills. X - - % - - Use spsive vasiaiea (e.8�. Noble). (Avw eativa not Iese 0150 16eJ RYE° 2 W. (W m 110 Ibs., 2.s It.. X - X X - X Um for late tall aedings, winter (Swale cereal not lass Wev SO It..) cover. Tolmtee cold and low moievve. GERMAN MILLET s0 It., appmx. 1 lb. - X - - X - Wasm-eeesoo eenuel. Dies et f rst (Sefuia iWiul troal. Mey be eddW to smmar mixes. ANNUAL RYEGRASS` 6016a. 1'h Ills. % - X % - X May be Wdd in mixa. Will ({gJlMlp multi-Flomml mow w[ of mwl sNMs. WEEPING 15 It'.. Wrm-xemnperevniel.May LOVEGRASSbsh.Tolerateshot,dryslopesfEnemstiacurvWOavdacid,infrtilesoils.Mrybe Ix addedtovexes. KOREAN25Ibs.XX Werm sr*son umud legume. LESPEDEZA` Ibs. Tolen[ea acid soils. May be f�a a is iwlacul addm m mixes. • Northam Piedmont and Mountain region. See Plates 3.22-1 and 3.22-2. b Southern Piedmont and Coastal Plain. e May be used as a cover crop with spring seeding. d May be used as a cover crop with fall seeding. X May be planted between these dates. - May nosy be planted between these dates. TEMPORARY S C $ Not To Scale TABLE 3.39-A ADHESIVES USED FOR DUST CONTROL Water Application Dilution Type of Rate Adhesive (Adhesive: Water) Nozzle Gallons/Acre Anionic Asphalt Emulsion Latex Emulsion Resin in Water Acrylic Emulsion (Non -Traffic) Acrylic Emulsion (Traffic) 7:1 Coarse Spray 1,200 12.5A Fine Spray 235 4:1 Fine Spray 300 7A Coarse Spray 450 3.5:1 Coarse Spray 350 $ DUST CONTROL DC C$ Not To Scale PIPE OUTLET CONDITIONS 3do (MIN.) IPE OUTLET TO WELL IEFINED CHANNEL 1` ` ° D z -� d SECTION A -A FILTER CLOTH KEY IN 6'-9"; RECOMMENDED FOR ENTIRE PERIL NOTES: 1. APRON LINING MAY BE RIPRAP, GROUTED REPRAP, GABION BASKET, OR CONCRETE. 2. La IS THE LENGTH OF THE RINRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 3,18-4. 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. Q10 (cfs) La (ft) Do 3Do d5o depth Outlet (ft) (ft) (in) (in) Condition Al (OP) 116.03 22.0 1.25 3.75 11.0 16.5 Channel OUTLET PROTECTION TABLE (OP Not To Scale PERMANENT SEEDING SPECIFICATIONS February 16 through April 30: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Annual Rye - 20 Ibs/acre. May 1 through August 15: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Foxtail Millet - 20 lbs/acre. August 16 through October 31: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Annual Rye - 20 Ibs/acre. November 1 through February 15: Kentucky 31 Fescue - 128 lbs/acre; Red Top Grass - 2 lbs/acre; Winter Rye - 20 lbs/acre. MULCHING SPECIFICATIONS: Straw or hay at a rate of 2 tons/acre. Must be anchored. Spread with mulch blower or by hand. LIME AND FERTILIZER SPECIFICATIONS: Lime and fertilizer needs should be determined by soil tests. Soil tests may be preformed by the Cooperative Extension Service Soil Testing Laboratory at VPI&SU, or by a reputable commercial laboratory. Information concerning the State Soil Testing Laboratory is available from CITY Extension Agents. Under unusual conditions where it is not possible to obtain a soil test, the following soil amendments will be applied: For Permanent Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 1,000 Ibs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. For Temporary Seeding: Seeded areas shall be limed at a rate of 2 tons per acre, and fertilized at a rate of 600 lbs. per acre of 10-20-10 (10 lbs. per 1,000 square feet) or equivalent. LOW MAINTENANCE GROUND COVER: SOUTHEAST NATIVE GRASS SEED MIX (AMERICAN MEADOWS INC.) For slopes steeper than 3:1 grade, Mix the following seeds of 30 lbs/acre each, along with EC-2 Matting: Virginia Wildrye (Elymus virginicus), Little Bluestem Grass (Schizachyrium scoporium), Purpletop (Tridens flavus), Broomsedge (Andropogon virginicus), and Indian Grass (Sorghostrum nutons). 9 )PERMANENT SEEDING (PSSEEDING (PS C $ Not To Scale n A 000 PSI ed "a a CONCRETE 4" - VDOT #21A 0000000000� 0� 00^ BASESTONE `COMPACTED SUBGRADE MIN. CBR=6.0 TO BE FIELD VERIFIED 1 o TYPICAL SIDEWALK SECTION C 8)Not To Scale • INEEMENEEN �%I%I%I%I%I%I%I%I%I%l • • . r • • SHIMP ENGINEERING2 LAND PLANNING - PROJECT MANAGEMENT 912 E. HIGH ST. 434.227.5140 CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM U VSMP PLAN FOR SOUTH PANTOPS DRIVE PARCEL 20R ALBEMARLE COUNTY, VIRGINIA SUBMISSION: 2022.04.27 REVISION: 1. FILE NO. ES&C DETAILS 22.002 5 )TEMPORARY SEDIMENT TRAP C 8 j Not To Scale s SAFTY FENCE SAF C$ Not To Scale 11 C 8 Not To Scale