HomeMy WebLinkAboutZMA202200004 ZMA Checklist 2022-05-12CONVENTIONAL DISTRICT
AL
��oF
7p
ZONING MAP AMENDMENT CHECKLIST for
fi
PREAPP2021-00019 1906 Avon Street / TMPs 90-33, 90-336, 90-33C
, LIRG1N1�r
Project Name / Tax Map Parcel Number
(CONVENTIONAL ZONING DISTRICTS - RA, VR, R-1, R-2, R-4, R-6, R-10, R-15, C-1 CO, HC, LI, HI, DCD)
Staff
After the mandatory pre -application meeting, county staff will mark this checklist appropriately so
A• Reitelbach
that it is clear to the applicant the information from Section 33.4 (c) that must be submitted with
the official application
Required for
Provided with
application?
Staff)
application
SECTION 33.4(c)
(County
(Applicant)
X
X
YES
NO
X
✓
A narrative of the project proposal, including its public need or benefit;
X
A narrative of the proposed project's consistency with the comprehensive plan,
✓
including the land use plan and the master plan for the applicable development area;
X
✓
A narrative of the proposed project's impacts on environmental features.
X
A narrative that addresses the impacts of the proposed development on public
✓
transportation facilities, public safety facilities, public school facilities, and public parks.
X
One or more maps showing the proposed project's regional context and existing natural
✓
and manmade physical conditions;
X
✓
A conceptual plan showing, as applicable:
X
1) the street network, including
❑ circulation within the project and
❑ connections to existing and proposed or planned streets within and outside of
the project;
X
2) typical cross -sections to show
❑ proportions,
❑ scale and
❑ streetscape/cross-sections/circulation;
X
✓
3) the general location of pedestrian and bicycle facilities;
CONVENTIONAL DISTRICT ZONING MAP AMENDMENT CHECKLIST 09-2020 Page 1 of 4
X
✓
4) building envelopes;
X
✓
5) parking envelopes;
X
Private amenities
6) public spaces and amenities;
X
NSA
7) areas to be designated as conservation and/or preservation areas;
X
✓
8) conceptual stormwater detention facility locations;
X
✓
9) conceptual grading;
X
Other special studies or documentation, if applicable, and any other information
identified as necessary by the county on the pre -application comment form.
• See "Additional Information" below for items to consider in the application.
X
A local traffic impact statement as required by Virginia Code § 15.2-2222.1 and 24 VAC
30-155-40.
✓
***A TIA is not required at this time. However, provide the number of daily trips
expected to be generated by this development so that staff can determine whether the
threshold for a TIA would be reached.
Additional Information
• The Southern and Western Urban Neighborhoods Master Plan recommends these parcels for "Neighborhood
Density Residential," which is 3-6 dwelling units per acre. The density (11 units per acre) proposed at this pre -
application meeting is above (nearly double) that which is recommended by the master plan.
• Consider interparcel connections with the surrounding properties. Interparcel connections are an important part
of helping to create an interconnected street network that supports multi -modal transportation opportunities.
Hathaway Street in the adjacent Avon Park development currently dead -ends at the common property line
between Avon Park and TMP 90-33.
• An exception from VDOT may be needed for entrance requirements.
• The Avon St. Corridor study has been completed. Consider the principles, policies, and recommendations
identified in the study for this corridor: https://www.albemarle.org./home/showpublisheddocument?id=4978
• The subject property is within the Entrance Corridor Overlay District along Avon Street; however, EC guidelines
are not currently being applied to Avon Street in this area.
• There appear to be small areas of Managed Steep Slopes on these parcels, along the Avon Street frontage.
• Consider stormwater management and connections with the SWM facilities of nearby developments.
• Consider how the proposal is consistent with the 12 Neighborhood Model Principles that are identified in the
Comprehensive Plan.
• Mountain View Elementary School, which would serve this development, is currently over -capacity.
• Consider open space and recreational requirements.
• If subdivision is proposed, consider parking on lots vs. shared parking in common bays for any attached units.
• Non-infill setbacks would be applied for this development.
• Consider the proposed ownership of the streets or travelways in the development. Public streets are preferred
in the development areas. Hathaway Street in the adjacent Avon Park development, which would provide an
appropriate interconnection with this proposal, is a public street.
CONVENTIONAL DISTRICT ZONING MAP AMENDMENT CHECKLIST 09-2020 Page2of4
• These properties are in the ACSA jurisdictional area and will be required to connect to public water and sewer.
Consider these connections when planning the site. Any questions about public utilities should be directed to
ACSA— Richard Nelson, rnelson@serviceauthority.org.
• Consider emergency access to this development. Any questions about Fire -Rescue issues should be directed to
Howard Lagomarsino at hlagomarsino@albemarle.org.
• A community meeting will be required, to be held in conjunction with the 5`h and Avon CAC.
• If any Special Exceptions are requested, applications for those requests should be submitted along with the ZMA
application, using the separate special exception application:
https://www.albemarle.org/home/showpublisheddocument?id=230
• For multi -story buildings, any building over 40 feet, or three stories, whichever is less, requires a stepback of 15
feet. To request to waive this requirement, a special exception is required to be submitted.
• There was some discussion at the pre-app meeting about the proposed Avon Street sidewalk project. The
Facilities and Environmental Services department provided a snippet of the proposed project (see below) along
the subject parcels' frontage. Further questions about this project should be directed to Daniel Butch at
dbutch@albemarle.org or Matt Wertman in FES at mwertman@albemarle.org.
X ji�
J
.0
RELOCATED 17 WATER
MAIN IN CENTER OF •f 11 B SMTr+ -
R1 C yj; GRADED BENCH r c{{ 1! 71 PG S79 _
3 TMYE.
PROP. TEMP. �AAp-TT>-Vy,r-
CONSTR. r,;. L; ' - 1 •1 "- \J
EASEMENT DOMINION TPOWER POLO
LEOONN EXISTING O >` - ( i io i - - - - - - - - - -
ALIGNMENT COMCASTAND 02O i�� 1 ti I
--- - - -
CENTURY LINK EV'
E 61
NMN CUlLI ESTONEQSWELL
REMOVE 6 BUSHES
r. WITHIN CUT AREA
Jam_ I
-�.. -----
GRADED
c az� N1.07a917E g 15-00
1 MODffED PROP SCONIC MODIFIED 65
O 4 D
CG.90 2 O SIDEWALK REOD
EO
S REOD
I' Sa 10 56-E I w
STD LIDO g G Z n
SS REOD m
u n • p Q L7
4 4 G--"-----
0. = 12♦91.08 0. ; �S
X 1 ti � DOMINION
CONVENTIONAL DISTRICT ZONING MAP AMENDMENT CHECKLIST 09-2020 Page 3 of 4
Please note: There are additional submittal requirements outlined on the official application for a Zoning Map Amendment.
Read and Sign
I hereby state that, to the best of my knowledge, the official application submitted contains all information marked on
this checklist as required for application.
Ao-N
05/11/2022
Signature of person completing this checklist Date
Rachel Moon
434-227-5140
Print Name Daytime phone number of Signatory
CONVENTIONAL DISTRICT ZONING MAP AMENDMENT CHECKLIST 09-2020 Page 4 of 4