HomeMy WebLinkAboutSUB200600417 Correspondence 2022-05-16 (2)LINE+GRADE C I V I L E N G I N E E R I N G COMMENT RESPONSE LETTER May 9, 2022 TO: Virginia Department of Transportation ATTN: Doug McAvoy, Jr, PE Area Land Use Engineer (Charlottesville Residency) RE: Bundoran Farm (Winsome Orchard Lane) SUB2006000417 —As Built Review tit Dear Doug, On behalf of NA Bundoran Farm LLC we offer the following responses to comments dated January 14, 2022. These responses are provided prior to any adjustments to the plans or site conditions. Our responses are in bold italic text below each comment. 1. The Department was unable to find a Land Use Permit for this location. The applicant will have to contact VDOT to either provide a permit number or obtain a Land Use Permit for this site to be approved by the Department. A Permit was obtained, number 743-21213. 2. Drainage appears to flow into the public road unless the private road crown is steep and drains into a receiving channel. The entrance has been regraded such that the slope of Edge Valley Road continues 13 ft into the private road before the private road ascends. This allows drainage from the private road to flow to the western receiving channel instead of flowing into the public road. 3. Snow plows will cut across the entrance destroying the private road. The private road vertical alignment should continue the slope of the public road crown for at least 5' into the road. L I N E The entrance has been regraded such that the slope of Edge Valley Road continues for 13 ft into the private road. GRADE 4. CG-11 detail should be addressed with a minimum 10' parabolic curve CIVIL E N G IN E E R ING at the entrance and a flow line for positive drainage. 113 4`" STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM Comment Response Letter Bundoran Farm (Winsome Orchard Lane) May 9, 20221 Page 2 The 10' parabolic curve does not appear to have been constructed per proposed plans; however, a positive flow line for drainage was constructed. 5. Street connection must meet the AASHTO policy and acceptable requirements of the road design manual, including stopping sight distance and K value requirements. Acknowledged. The stopping sight distance is met see below for pictures from the site which give an indication of the visibility. Image 1. Sight distance left L I N E + GRADE CIVIL ENGINEERING 113 4`" STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM Image 2. Sight distance right Comment Response Letter Bundoran Farm (Winsome Orchard Lane) May 9, 20221 Page 3 L I N E + GRADE CIVIL ENGINEERING 1130 STREET NE, STE. 100 CHARLOTTESVILLE, VA 22902 LINE-GRADE.COM