Loading...
HomeMy WebLinkAboutSDP202200033 Application 2022-05-16Application for Major or Minor Site Plan Amendments�,�Nv Existing Site Plan Name & Number: Rio Hill Center (formerly Jefferson Square Shopping Center), SDP-1988-00001 SDP2020-64 Tax map and parcel(s): 04500-00-00-094AO Zoning: Planned Development -Shopping Center Contact (who should we contact about this project): Kendra G. Street Address 113 4th St NE, Suite 100 Patrick, PE (Line and Grade Civil Engineering) City Charlottesville State VA Phone Number (434) 262-0169 Zip Code 22902 Email kpatrick@line-grade.com Owner of Record SCT Rio Hill, LLC c/o TSCG Street Address 300 Galleria Parkway, 12th Floor city Atlanta State GA Phone Number (757)722-2500 Zip Code 30339 Email Jim.Paulus@tscg.twm Applicant Line and Grade - Kendra Patrick Street Address 113 4th St NE Suite 100 City Charlottesville State VA Phone Number (434) 262-0169 Zip Code 22902 Email kpatrick@line-grade.com FEES ❑ Major Amendment Zoning Fee = $1613 Id Minor Amendment (alterations to parking, circulation, building ❑ Major Amendment Fire Rescue Fee = $100 size, location) = $538 This application may require additional review by the Fire 16folded copies ofplan are required Marshal. Fees in addition to those shown on this application may be required by the Fire Prevention Code Fee Schedule. A copy of the schedule is available from the Fire Marshal. 8 folded conies ofatan are reouired Notices required by Section 32.4.2.1 (f) Preparing and mailing or delivering up to fifty (50) notices = $215.00 plus the actual cost of first class postage. Preparing and mailing or delivering, per notice more than fifty (50) = $1.08 plus the actual cost of first class postage. County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 9724126 REVISED 4/23/2018 Page 1 of GROUNDWATER ASSESSMENT (Required for all non-residential site plans not serviced by public water) Was a Groundwater Assessment conducted for the existing site plan? ❑ YES ❑ NO If NO and the new plans show a use using less than 2,000 gallons/day (average) ❑ Tier 3 Groundwater Review = $548 If NO and the new plans show a use using greater than 2,000 gallons/day (average) ❑ Tier 4 Groundwater Review = $1,183 If YES and the use goes from using less than to more than 2,000 gallons/day (average) ❑ Tier 4 minus Tier 3 = $635 If YES and the use does not change from using less than to more than 2,000 gallons/day (average) r_1 �. Comments/Attachments: Owner/Applicant Must Read and Sign ❑ Manor Amendment This major amendment as submitted contains all of the information required by Section 32.5 (Initial Site Plan) and Section 32.6 (Final Site Plan) of the Albemarle County Zoning Ordinance. I understand that plans which lack information required by said sections shall be deemed incomplete and shall be denied by the agent within ten (10) days of submittal as provided in Section 32.4.2.1 or Section 32.4.3.1 as the case may be. Id Minor Amendment This minor amendment as submitted contains all of the information required by Section 32.5 (Initial Site Plan) and Section 32.6 (Final Site Plan) of the Albemarle County Zoning Ordinance. I hereby certify that the information provided on this application and accompanying information is accurate, true, and correct to the best of my knowledge. By signing this application I am consenting to written comments, letters and or notifications regarding this application being provided to me or my designated contact via fax and or email. This consent does not preclude such written communication from also being sent via first class mail. 4 Nn')aP �Nq 05/16/2022 Signature of Owner, Contract Purchaser, Agent Date Kendra G. Patrick Print Name 434-262-0169 Daytime phone number of Signatory FOR OFFICE USE ONLY SDP # Fee Amount S Date Paid By who? Receipt # C1d1 By: Major or Minor Site Plan Amendments REVISED 4/232018 Page 2 of 2