HomeMy WebLinkAboutSDP202200033 Application 2022-05-16Application for
Major or Minor Site Plan Amendments�,�Nv
Existing Site Plan Name & Number: Rio Hill Center (formerly Jefferson Square Shopping Center), SDP-1988-00001 SDP2020-64
Tax map and parcel(s): 04500-00-00-094AO Zoning: Planned Development -Shopping Center
Contact (who should we contact about this project): Kendra G.
Street Address 113 4th St NE, Suite 100
Patrick, PE (Line and Grade Civil Engineering)
City Charlottesville State VA
Phone Number (434) 262-0169
Zip Code 22902
Email kpatrick@line-grade.com
Owner of Record SCT Rio Hill, LLC c/o TSCG
Street Address 300 Galleria Parkway, 12th Floor
city Atlanta State GA
Phone Number (757)722-2500
Zip Code 30339
Email Jim.Paulus@tscg.twm
Applicant Line and Grade - Kendra Patrick
Street Address 113 4th St NE Suite 100
City Charlottesville State VA
Phone Number (434) 262-0169
Zip Code 22902
Email kpatrick@line-grade.com
FEES
❑ Major Amendment Zoning Fee = $1613 Id Minor Amendment (alterations to parking, circulation, building
❑ Major Amendment Fire Rescue Fee = $100 size, location) = $538
This application may require additional review by the Fire
16folded copies ofplan are required Marshal. Fees in addition to those shown on this application may
be required by the Fire Prevention Code Fee Schedule. A copy of
the schedule is available from the Fire Marshal.
8 folded conies ofatan are reouired
Notices required by Section 32.4.2.1 (f)
Preparing and mailing or delivering up to fifty (50) notices = $215.00 plus the actual cost of first class postage.
Preparing and mailing or delivering, per notice more than fifty (50) = $1.08 plus the actual cost of first class postage.
County of Albemarle
Department of Community Development
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 9724126
REVISED 4/23/2018 Page 1 of
GROUNDWATER ASSESSMENT
(Required for all non-residential site plans not serviced by public water)
Was a Groundwater Assessment conducted for the existing site plan?
❑ YES
❑ NO
If NO and the new plans show a use using less than 2,000 gallons/day (average) ❑ Tier 3 Groundwater Review = $548
If NO and the new plans show a use using greater than 2,000 gallons/day (average) ❑ Tier 4 Groundwater Review = $1,183
If YES and the use goes from using less than to more than 2,000 gallons/day (average) ❑ Tier 4 minus Tier 3 = $635
If YES and the use does not change from using less than to more than 2,000 gallons/day (average) r_1 �.
Comments/Attachments:
Owner/Applicant Must Read and Sign
❑ Manor Amendment
This major amendment as submitted contains all of the information required by Section 32.5 (Initial Site Plan) and Section 32.6 (Final
Site Plan) of the Albemarle County Zoning Ordinance. I understand that plans which lack information required by said sections shall be
deemed incomplete and shall be denied by the agent within ten (10) days of submittal as provided in Section 32.4.2.1 or Section 32.4.3.1
as the case may be.
Id Minor Amendment
This minor amendment as submitted contains all of the information required by Section 32.5 (Initial Site Plan) and Section 32.6 (Final
Site Plan) of the Albemarle County Zoning Ordinance.
I hereby certify that the information provided on this application and accompanying information is accurate, true, and correct to the best
of my knowledge. By signing this application I am consenting to written comments, letters and or notifications regarding this application
being provided to me or my designated contact via fax and or email. This consent does not preclude such written communication from
also being sent via first class mail.
4 Nn')aP �Nq 05/16/2022
Signature of Owner, Contract Purchaser, Agent Date
Kendra G. Patrick
Print Name
434-262-0169
Daytime phone number of Signatory
FOR OFFICE USE ONLY
SDP #
Fee Amount S Date Paid
By who?
Receipt #
C1d1 By: