Loading...
HomeMy WebLinkAboutWPO202200016 Preconstruction Form 2022-05-17Request for Pre -construction Meeting and Grading Permit from Albemarle County — VSMP it Approved Plan Number: WPO- 202200016 DEQ Permit # (if applicable): VAR 10- N/A Approved Plan Name: 2628 Penny Lane TMP 89-53C (Plans must be approved prior to a pre -construction meeting.) Bond approved date: Waived (FVP) (Bonds must be approved and posted prior to a pre -construction meeting or permit.) Responsible Land Disturber: Print Name: 16��5 \�= State RLD Number: \ (o ZZ G\ Address: `1't' C�, 1�1\ S rh o 2\ 4_� V\ A l City: E,5 v-3 \ State: Zip: -7z 4�( Daytime Phone: (As • 53 \ - 13 E-mail: / C5 CV\, Y Primary Contractor: Print Name: C— � 1-0 \ 'Y \ ofCSG (_C Address: 5 i -t(. z q r�,—t City: State: 'mil ice` Zip: b us Daytime Phone: (41�) �- E-mail: 6z1_So% Q-,"L\\ \*s pg QA)L/�3/}�Z�tr­-�J loZ C-fa \- Ii -- {U� 0 Permit Issuance Fees (Request must include payment) [Code §17-708]: Total acres proposed to be disturbed as shown on the approved plan and application: k Acres Total Fee Due for Grading Permit Acres to be Disturbed Total Fee (Application Fee +4%Technology surcharge) Less than 1 $74.88 $72+$2.88 aml y Dwelling only — $74.88 ($72 + $2.8 1 and less than 5 acres $700.96 $674 + $26.96 5 and less than 10 acres $881.92 ($848 + $33.92) 10 and less than 50 acres $1,167.92 $1,123 + $44.92 50 and less than 100 acres $1,581.84 ($1,521 + $60.84 100 acres and more $2,490.80 $2 395 + $95.80 Annual maintenance fees are assessed in arrears on April 1 each year or portion of a year that this permit is active [Code § 17-208]. 711/14, Revised: 8/29/14, 10/18/18, 7/I/2021, 7/26/2021, 9/15/2021 Page 1 of Person(s) attending the Pre -construction Meeting: Names (Type or print) Finn Contact Number or email D S 5 C..,c;�' (� l i.1.. C t_• �`�'(L\.L� <'sS �SS"i;4..+.i'..Cl<3N t_✓t3�� 5 � \ —'I 3 l �'\ c:V T CL\ LI.0 dc�0� la-�s: Mo.11r .CttY\ The second part of the application fee is required to be paid with this request. This fee amount is: FOR OFFICE USE ONLY Permit Issued Date By who? 7/1/14, Revised: 8/29/14, 10/18/18, 7/1/2021, 7/26/2021, 9/15/2021 Page 2 of3