Loading...
HomeMy WebLinkAboutSP197500459 Action Letter There is no Board of Supervisors Approval Letter in the file for this SP . ~1"'l OU c; OF l, Planning Department 411 EAST HIGH STREET CHARLOTTESVILLE. VIRGINIA 22901 ROBERT W. TUCKER, JR; ASSISTANT DIRECTOR OF PLANNING JOHN L HUMPHREY DIRECTOR OF PLANNING MARY JOY SCALA PI.AIoINER March 11, 1975 Mr. Charles Sweety HAUGH & HELVIN ,435 Park Street Charlottesville, Virginia 22901 Re: Black Cat Road'Associates Dear Charles: As I indicated to you last week, the plans submitted for a plarHiE:d COIn.iHUiU,t..Y t,o De lUL:dteu between 1-64 and .G:JU ,t;ast near the Fluvanna County Line are deficient in a number of items. The following is a list of those items: 1. Vicinity sketch must be shown on the plans; _2. Show connection to Houte 250E and width ot right-of-way; 3. Indicate the flood plain limits on the plan; 4. Indicate, when determined, how water and sewer service will be provided; 5. Will this project be developed in phases? If so, indicate timing of development; 6. Indicate gross density and net residential density by type, i.e., single-family, townhouse, multi-family, etc. 7. Indicate number of acres to be developed conunercially; 8. Will these roads be built to state standards? 9. Indicate number of acres in open space and 'number of acres in streets. In addition to those items listed above, we suggest that the engineer of this project take another look at the steepness of slopes where development is proposed. We will not begin processing this application until I hear from you to do so. As I suggested in our conversation, the . Mr. Charles Sweety March 11, 1975 Page 2 State Water Control Board should be consulted about development of this property. If you have any questions concerning the list of items above, please give me a call. Sincerley, b~. Robert W. Tucker, Jr. Assistant Director of Planning RWTj: jc cc: John L. Humphrey, Mary Joy Scala P. S. Once these plans have been revised, the Planning Depart- ment will need ten (10) copies of the plans tor the site plan review process.