HomeMy WebLinkAboutSDP201400070 Bond 2022-05-25Inlc,,l rxe Only
Daft Received: ^� y
Fee Paid:_
Received by: d
`r
`Z .r. /
Intake: Fonwrd to AogromAdmiWs&alor
BOND INSPECTION REQUEST
APPROVED PLAN #: U,8
IL
PROJECT NAME (including Phase #): i—,) Y\e— — ( e
(As listed on the approved plan)
This form is used to request a reduction or release of a bond. A fee is required for each inspection. Please
check the appropriate box below for the requested inspection(s). Fees includes 4e/o Technology Fee.
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
❑ VSMP/VESCP Erosion Control, Stormwater Management and/or Mitigation per
Water Protection Ordinance sections 17-207 & 17-208 $294.32
❑ Reduction ❑ Release
❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14-435 & 14-438 $307.84
❑ Reduction ❑ Release
iWater & Sewer bond per Subdivision Ordinance section 14-435 $307.84
❑ Reduction Release
❑ Site Development Performance bond (Incomplete Site Work & Landscaping) $344.24
❑ Reduction (site work only) ❑Release 2
TOTAL FEES �307e Ff
Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville,
VA 22902, Attention: Management Analyst — Phone 434-296-5832; Fax 434-9724126. All roads and
stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts,
certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures).
Bonds will not be reduced or released without record drawings and inspection documentation per the state
requirements and County's published procedures. A minimum 20% of the original posting is held until
acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is
part of the bonded site work, a request for reduction should only be made once all landscaping is complete.
If all required documentation is not received within 30 days of receipt of this request, this application shall be
deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will
be required. Applications may be withdrawn for a full refund within 30 days of receipt.
If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner.
Please provide contact information.
EMAIL:
OR REGULAR MAIL ADDRESS:
Revised 7/152014, 720/2015, 11/32015, 8/14/2017, 128/2020, 7/1 /2021
Hates
Item Amount
We noeYment $l0].al
Please enter any notes or speclal instructions for this t
paYmen
them m Number: 19161F
Hun
Hu
]pe: Community R etukaemt so. plea
To communicate any urgent or time-sennlWe information, please call our office.
ImtiaVPlnniViNjm
Notrs; Water A fixer &M Release Aryuest Fee
iUR01s001u
Transaction Fee $8.20
Total $316.04
Process this Payment?
secure amine checkout
O Your Payment Was Submitted
Transaction ID: 1GS11239UB414621A
Transaction Time: 05/23/2022 10:29 AM
Total Paid: $316.04
We will receive notification of your online payment at the time that it is made and we will credit your payment as
of that day. However, you will not see the payment on your account for approximately 48-72 hours due to the time
that it takes to get those funds into our bank account.
ODCancel Payment (http://www.albemartecountytaxes.org/default.aspx?pagelD=110Etmp=Master.Master)
101e l Use Only
Date Remived:
Fee Paid:
h
Received by:
larake: F.n.,d to Praera.Adadabaalar
BOND INSPECTION REQUEST
APPROVED PLAN #: S (1 E A1�-CJO 6 0\ zt �j /�
PROJECT NAME (including Phase #): S�U r�e�Le l d &d etr- D
(As listed on the approved plan)
This form is used to request a reduction or release of a bond. A fee is required for each inspection. Please
check the appropriate box below for the requested inspection(s). Fees includes 4% Technology Fee.
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
❑ VSMP/VESCP Erosion Control, Stormwater Management and/or Mitigation per
Water Protection Ordinance sections 17-207 & 17-208 $294.32
❑ Reduction ❑ Release
❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14-435 & 14-438 $307.84
❑ Reduction ❑ Release
❑ Water & Sewer bond per Subdivision Ordinance section 14435
❑ Reduction ❑ Release
UQ Site Development Performance bond (In nplete Site Work & Landscaping)
Reduction (site work only) elease ^l
TOTAL FEES 3'7t' . CJ�
$307.84
$344.24
Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville,
VA 22902, Attention: Management Analyst —Phone 434-296-5832; Fax 434-9724126. All roads and
stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts,
certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures).
Bonds will not be reduced or released without record drawings and inspection documentation per the state
requirements and County's published procedures. A minimum 20% of the original posting is held until
acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is
part of the bonded site work, a request for reduction should only be made once all landscaping is complete.
If all required documentation is not received within 30 days of receipt of this request, this application shall be
deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will
be required. Applications may be withdrawn for a full refund within 30 days of receipt.
If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner.
Please provide contact information.
EMAIL:
OR REGULAR MAIL ADDRESS:
Signature
Name
M.-
Revised 7/152014, 720/2015, 11/3/2015, 8/14/2017, 128/2020, 7/l/2021
Notes
Please enter any notes or syeclal lnstmctlons for this payment.
To communicate any urgent or time se sitive Information, please call our office.
Process this Payment?
Secure Online Checkout
Item
Amount
weharoe Payment S3".24
1I m Numker. 3302JA7
Type: Community ametWment ally eUn
ImtlaVFlnal/Wjn
Notes: site YerHoMem Performance Wease
Fm 91B301500IN
Transaction Fee $9.13
Total $353.37
0 Your Payment Was Submitted
Transaction ID: 04U62961M7517331Y
Transaction Time: 05/23/2022 10:27 AM
Total Paid: $353.37
We will receive notification of your online payment at the time that it is made and we will credit your payment as
of that day. However, you will not we the payment on your account for approximately 48-72 hours due to the time
that it takes to get those funds into our bank account.
03Cancel Payment (http://www.albemarlecountytaxes.org/default.aspx?pagelD=110&mp=Master. Master)