Loading...
HomeMy WebLinkAboutWPO202200021 Calculations 2022-05-27STOCKTON CREEK SUBDIVISION VSMP STORMWATER MANAGEMENT CALCULATIONS PACKET Date of Calculations May 20, 2022 PREPARED BY: COLLINS ENGIkI=ERING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com SCS TR-55 Calculations Si " . . !Database) Soils Table (Source: NRCS Web Soil Survey Online Database) Note: The soils' properties witin this development are predominantly composed of hydrologic group type B soils. Albemarle County, Virginia(VA003) 81B Thurmont 2.9% Albemarle County, Virginia (VA003) ® loam, 2 to 7 percent slopes Map Unit m Sybol Map Unit Name portent of Portent 81C Thurmont 7.1% 4D Ashe loam, 15 1.0% loam, 7 to 15 to 25 percent percent slopes slopes 89B Unison silt 14.2 % 4E Ashe loam, 25 8.4% loam, 2 to 7 to 45 percent percent slopes slopes 89C Unison silt 6.1 % 7B Braddock 10.1% loam, 7 to 15 percent slopes loam, 2 to 7 percent slopes Totals for Area of 100.0% Interest 14D Chester loam, 25.5% 15 to 25 percent slopes 14E Chester loam, 4.7% 25 to 45 percent slopes 36B Hayesville 6.6% loam, 2 to 7 percent slopes 36C Hayesville 13.6% loam, 7 to 15 percent slopes Precipitation Data (Source: NOAA's National Weather Service, Hydrometerorological Design Studies Center, Atlas 14 Point Precipitation Frequency Estimates) POINT PRECIPITATION FREQUENCY (PF) ESTIMATES WITH 90%CONFIDENCE INTERVALS AND SUPPLEMENTARY INFORMATION NOAA Atlas 14, Volume 2, Version 3 PDS-based precipitation frequency estimates with 90% confidence intervals (in inches)l AvmsOe Aunana inNrval ay ) 0ura0°^ 000 10 ®® 100 ®® 1000 241r QW331) 1 (32544.01) 1 (0 1-0) 1 (48 5.90) 1 (5-W729) I (6 14Q) 1 (T 9S3) 1 (900.110) I (88& 10) 1 (11 -0V) I O Terrain Old Ti�nPike Rd y j n v Rockfish GOP o I0 0 I t5J 200mIL 4 600 a POINT PRECIPITATION FREQUENCY (PF) ESTIMATES WITH 90%CONFIDENCE INTERVALS AND SUPPLEMENTARY INFORMATION NOAA Atlas 14, Volume 2, Version 3 U.S. Department of Agriculture Natural Resources Conservation Service Project: Stockton Creek Residential Development Location: Rte 151 and Goodloe Lane Check One: Present X Developed 1. Runoff curve Number (CN) TR 55 Worksheet 2: Runoff Curve Number and Runoff Designed By: UMW, PE Checked By: SRC, PE FL-ENG-21A 06/04 Date: 4/22/2022 Date: 4/22/2022 Cover description CN (weighted) _Area Drainage Area Soil name and hydrologic (Cover type, treatment, and hydrologic condition; percent CN Product of CN x total product/ Calculated'S' Description group (Appendix A) (Acres) Area Value impervious; unconnected/ connected impervious area ratio) total area Impervious Areas 98 0.20 19.3 DAA B Lawns in Good Condition (25%+/-) 61 13.57 827.9 61 6.33 (Pre-ReDev.) Woods Grass Good Condition 58 1.32 76.6 DAA Impervious Areas 98 2.50 244.5 (Post-ReDev) B Lawns in Good Condition 61 12.21 745.1 67 4.92 Woods Grass Good Condition 58 0.38 22.0 2. Runoff 1-Year Storm 2-Year Storm 30-Year Storm 100-Year Storm I Drainage Area Description Frequency -years 1 2 10 100 n/a Rainfall, P(24 hour) -inches 2.97 3.6 5.38 8.69 n/a Ea Runoff, Q-inches 0.36 0.63 1.62 4.01 DA A(Pre-ReDev) Runoff, Q-inches 0.57 0.91 2.08 4.71 DA A(Post-ReDev) U.S. Department of Agriculture Natural Resources Conservation Service TR 55 Worksheet 3: Time of Concentration (TJ or Travel Time (T,) Project: Stockton Creek Residential Development Designed By: Location: Rte 151 and Goodloe Lane Checked By: Check One: Present X Developed X Check One: T, X T, DA A DA A (Pre-ReDev.) (Post-ReDev) Segment ID: Sheet Flow: (Applicable to Tc only) 1 Surface description (Table 3-1) Grass -dense Grass -dense 2 Manning's roughness coeff., n (Table 3-1) 0.24 0.24 3 Flow length, L (total L < 100) (ft) 46 46 4 Two-year 24-hour rainfall, Pz (in.) 3.60 3.60 5 Land slope, s (ft/ft) 0.02 0.02 6 Compute T, = [0.007(n-L)0.e] / P205 s A 0.12 0.12 Shallow Concentrated Flow 7 Surface description (paved or unpaved) Unpaved Unpaved 8 Flow Length, L (ft) 954 583 9 Watercourse slope, s (ft/ft) 0.03 0.01 10 Average velocity, V (Figure 3-1) (ft/s) 2.8 1.9 11 T, = L / 3600-V 0.10 0.09 Channel Flow: 12 Cross sectional flow area, a (ftz) 0 13 Wetted perimeter, Pw (ft) w a a Z 14 Hydraulic radius, r = a/Pw (ft) �: 15 Channel Slope, s (ft/ft) O a J " w 16 Manning's Roughness Coeff, n Z 2/3 O5 = 18 Flow length, L (ft) in LD 19 T,= L / 3600'V 0.02 20 Watershed or subarea Tc or T, (Add T, in steps 6, 11 and 19) 0.22 0.23 n/a FL-ENG-21A 06/04 Date: 4/22/2022 Date: 4/22/2022 U.S. Department of Agriculture Natural Resources Conservation Service Project: Location: Check One: TR 55 Graphical Peak Discharge Method Stockton Creek Residential Development Rte 151 and Goodloe lane Presen% Dew% Designed By: LMW, PE Checked By: SRC, PE 1. Data Drainage Area Description Drainage Area Description DA A (Pre-ReDev.) DA A (Post-ReDev) Drainage Area (Am) in miles' 0.0236 0.0236 Runoff curve number CN= 61 67 Time of concentration (Tc)= 0.22 0.23 Rainfall distribution type= Type II Type II Pond and swamp areas spread throughout the watershed= 0 0 2. Frequency -years 1 2 10 100 1 2 10 100 3. Rainfall, P (24 hour)- inches 2.97 3.6 5.38 8.69 2.97 3.6 5.38 8.69 4. Initial Abstraction, la- inches 1.27 1.27 1.27 1.27 0.98 0.98 0.98 0.98 5. Compute la/P 0.43 0.35 0.24 0.15 0.33 0.27 0.18 0.11 6. Unit peak discharge, Qu-um/in See Hydrograph for Flows See Detention Basin Routings for Outflows 7. Runoff, Q from Worksheet 2-inches 0.36 0.63 1.62 4.01 0.57 0.91 2.08 4.71 8. Pond and Swamp adjustment factor, Fp 1 1 1 1 1 1 1 1 9. Peak Discharge, OF-cfs where Qp=Qu Am Q Fp 1 3.78 8.57 26.59 70.55 1 1.75 8.33 24.29 82.00 WATERSHED SUMMARY FOR CHANNEL AND FLOOD PROTECTION Area, 1-year Flow, 2-year Flow, 10-year Flow, 100-year Flow, CN ac. cfs cfs cfs cfs DAA(Pre-ReDev) 61 15.09 3.78 8.57 26.59 70.55 DAA(Post-ReDev) 67 15.09 1.75 8.33 24.29 82.00 Date: 4/22/2022 Date: 4/22/2022 Pre-ReDevelopment Site Flow Hydrographs The following inflow hydrographs reflect the pre -redevelopment onsite concentrated flow from Subarea A. Worksheet 5b (Modified for Clarity): Basic watershed Data 1-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Below Subarea Tc (hrs.) Tt (hr.) la / P Am'Q (miz-in) DA A 0.22 0.22 0.43 0.0085 (Pre-ReDev.) Hydrograph Time (hrs.) 1-yr Discharges (cfs) 0.0 0.00 11.0 0.00 11.3 0.00 11.6 0.00 11.9 0.10 12.0 0.50 12.1 1.91 12.2 3.78 12.3 3.28 12.4 2.21 12.5 1.70 12.6 1.41 12.7 1.20 12.8 1.03 13.0 0.87 13.2 0.77 13.4 0.70 13.6 0.65 13.8 0.60 14.0 0.55 14.3 0.49 14.6 0.47 15.0 0.45 15.5 0.41 16.0 0.37 16.5 0.34 17.0 0.32 17.5 0.31 18.0 0.30 19.0 0.27 20.0 0.23 22.0 0.21 26.0 0.00 SCS TR-55 Pre-ReDevelopment Unit Hydrograph (ON DA A) Worksheet Sb (Modified for Clarity): Basic watershed Data 2-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Below Subarea Tc (hrs.) Tt (hr.) la / P Am*Q (miz-in) DA A 0.22 0.22 0.35 0.0148 (Pre -Re Dev.) Hydrograph Time (hrs.) 2-yr Discharges (cfs) 0.0 0.00 11.0 0.00 11.3 0.00 11.6 0.00 11.9 0.37 12.0 1.76 12.1 5.71 12.2 8.57 12.3 6.87 12.4 4.32 12.5 3.13 12.6 2.50 12.7 2.07 12.8 1.75 13.0 1.45 13.2 1.27 13.4 1.14 13.6 1.05 13.8 0.96 14.0 0.88 14.3 0.78 14.6 0.74 15.0 0.69 15.5 0.63 16.0 0.57 16.5 0.52 17.0 0.49 17.5 0.47 18.0 0.45 19.0 0.40 20.0 0.35 22.0 0.31 26.0 0.00 SCS TR-55 Pre-ReDevelopment Unit Hydrograph (ON DA A) 6 5 4 3 2 1 0 0 5 10 15 20 25 30 Worksheet 5b (Modified for Clarity): Basic watershed Data 10-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Below Subarea Tc (hrs.) Tt (hr.) la / P Am;Q (mi2-in) DA A 0.22 0.22 0.24 0.0382 (Pre-ReDev.) Hydrograph Time(hrs.) 10-yr Discharges (cfs) 0.0 0.00 11.0 0.26 11.3 0.35 11.6 0.52 11.9 3.08 12.0 8.42 12.1 20.79 12.2 26.59 12.3 19.65 12.4 11.67 12.5 8.02 12.6 6.18 12.7 4.97 12.8 4.15 13.0 3.37 13.2 2.91 13.4 2.60 13.6 2.37 13.8 2.16 14.0 1.97 14.3 1.73 14.6 1.61 15.0 1.50 15.5 1.36 16.0 1.22 16.5 1.10 17.0 1.04 17.5 0.99 18.0 0.93 19.0 0.82 20.0 0.71 22.0 0.65 26.0 0.00 6 5 4 3 2 1 0 SCS TR-55 Pre-ReDevelopment Unit Hydrograph (ON DA A) 0 5 10 15 20 25 30 Worksheet 5b (Modified for Clarity): Basic watershed Data 100-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Below Subarea Tc (hrs.) Tt (hr.) la / P Am;Q (mi2-in) DA A 0.22 0.22 0.15 0.0944 (Pre-ReDev.) Hydrograph Time(hrs.) 100-yr Discharges (cfs) 0.0 0.00 11.0 1.59 11.3 2.15 11.6 3.24 11.9 14.30 12.0 29.87 12.1 59.69 12.2 70.55 12.3 48.93 12.4 28.03 12.5 18.59 12.6 14.06 12.7 11.12 12.8 9.23 13.0 7.35 13.2 6.34 13.4 5.61 13.6 5.10 13.8 4.60 14.0 4.19 14.3 3.67 14.6 3.43 15.0 3.16 15.5 2.85 16.0 2.53 16.5 2.26 17.0 2.13 17.5 2.03 18.0 1.92 19.0 1.70 20.0 1.42 22.0 1.30 26.0 0.D0 6 5 4 3 2 1 0 SCS TR-55 Pre-ReDevelopment Unit Hydrograph (ON DA A) 0 5 10 15 20 25 30 Channel and Flood Protection Calculations The following calculations shows how Subarea A meets Channel and Flood Protection requirements. 9 VAC 25-870-66 Section B: Channel Protection Utilizing a 6-inch Orifice "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet the criteria in subdivision 1, 2 or 3 of this subsection..." Section B.1: Manmade stormwater conveyance systems "When stormwater from a development is discharged to a manmade stormwater conveyance system, following the land -disturbing activity, either..." a. or b. shall be met: Section B.l.b. "The peak discharge requirements for concentrated stormwater flow to natural stormwater conveyance systems in subdivision 3 of this subsection shall be met." Section 8.3 "... the maximum peak flow rate from the one-year 24-hour storm following the land -disturbing activity shall be calculated either.." a. or b." Section 6.3.a. In accordance with the following methodology: Q Allowed < I.F. * (Q Pre�Developed + (RV Pre -Developed) ) I (RV Developed ) Q Allowed < 1.91 cfs Where: QPre-Developed= 3.78cfs (FromTR-55) CN Pre�Devebped= 61 (From Curve Number Summary) S Pre -Developed = 6.33 (From SCS TR-55 eq. 2-4) RV Pre�Developed= 0.36 in. (From SCSTR-55 eq. 2-3) CN Pt -Developed = 67 (From Curve Number Summary) S P.A Developed = 4.92 (From SCS TR-55 eq. 2-4) RV port -Developed= 0.57 in. (From SCS TR-55 eq. 2-3) I.F. = 0.80 (Factor of Safety) Q Developed = 1.75 cfs Section B.4 Limits of Analysis The analysis terminates at Post -Development Subarea A since subsection B.3.a is met. 9 VAC 25-870-66 Section C: Flood Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet one of the following criteria as demonstrated by use of acceptable hydrologic and hydraulic methodologies:" Section C.2.b.: The point of discharge (Detention Basin B's Outfall), "releases a postdevelopment peak flow rate for the 10-year 24-hour storm event that is less than the predevelopment peak flow rate from the 10-year 24-hour storm event. Downstream stormwater conveyance systems do not require any additional analysis to show compliance with flood protection criteria if this option is utilized." 10-Year, 24-Hour Pre-ReDevelopment Subarea A Peak Flow Rate = 26.59 cfs 10-Year, 24-Hour Post-ReDevelopment Subarea A Peak Flow Rate = 24.29 cfs Section C.3 Limits of Analysis The flood protection analysis terminates at Subarea A since subsection C.2.b is met. Post -Re Development Detention Basin Routings and Outflow Hydrographs The following routing calculations and outflow hydrographs reflect the post -redevelopment attenuation in Subarea A from the proposed detention basin. BasinFlow printout INPUT: Basin: Stockton Creek Detention Basin 5 Contour Areas Elevation(ft) Area(sf) Computed Vol.(cy) 860.00 995.00 0.0 862.00 2342.00 120.1 864.00 3974.00 351.4 866.00 5881.00 714.1 868.00 8065.00 1228.5 Start—Elevation(ft) 860.00 Vol.(cy) 4 Outlet Structures Outlet structure 0 Orifice name: riser inlet area (sf) 0.196 diameter or depth (in) 6.000 width for rect. (in) 0.000 coefficient 0.600 invert (ft) 860.000 multiple 1 discharge into riser Outlet structure 1 Weir name: riser top diameter (in) 24.000 side angle 0.000 coefficient 3.300 invert (ft) 864.000 multiple 1 discharge into riser transition at (ft) 0.729 orifice coef. 0.600 orifice area (sf) 3.142 Outlet structure 2 Weir name: emergency spillway length (ft) 40.000 side angle 0.000 coefficient 3.300 invert (ft) 866.200 multiple 1 discharge through dam Outlet structure 3 Culvert name: riser outlet multiple 1 discharge out of riser D (in) 24.000 h (in) 0.000 Length (ft) 74.940 Slope 0.013 Manning's n 0.012 Inlet coeff. Ke 0.500 Equation constant set 1 Invert (ft) 859.900 4 Inflow Hydrographs Hydrograph 0 Curve name: 1 YR time incr (minlhrs) 0.02 time limit (minlhrs) 30.00 file: Q:\Projects\222207 Development\CALCS\SWM\1st Submission\1 volume (cy) 1160.26 routed true time in hours true Hydrograph 1 Curve - Stockton Creek Residential YR BASIN A.txt name: 2 YR time incr (minlhrs) 0.02 time limit (minlhrs) 30.00 file: Q:\Projects\222207 - Stockton Creek Residential Development\CALCS\SWM\1st Submission\2 YR BASIN A.txt volume (cy) 1890.56 routed true time in hours true Hydrograph 2 Curve name: 10 YR time incr (minlhrs) 0.02 time limit (minlhrs) 30.00 file: Q:\Projects\222207 - Stockton Creek Residential Development\CALCS\SWM\1st Submission\10 YR BASIN A.txt volume (cy) 4622.99 routed true time in hours true Hydrograph 3 Curve name: 100 YR time incr (minlhrs) 0.02 time limit (minlhrs) 30.00 file: Q:\Projects\222207 - Stockton Creek Residential Development\CALLS\SWM\1st Submission\100 YR BASIN A.txt volume (cy) 11579.65 routed true time in hours true OUTPUT: Routing Method: storage -indication Hydrograph 0 Routing Summary of Peaks: 1 YR inflow (cfs) 8.014 at 12.20 (hrs) discharge (cfs) 1.749 at 12.72 (hrs) water level (ft) 863.677 at 12.76 (hrs) storage (cy) 305.561 Hydrograph 1 Routing Summary of Peaks: 2 YR inflow (cfs) 14.211 at 12.20 (hrs) discharge (cfs) 8.326 at 12.36 (hrs) water level (ft) 864.456 at 12.36 (hrs) storage (cy) 421.875 Hydrograph 2 Routing Summary of Peaks: 10 YR inflow (cfs) 35.036 at 12.20 (hrs) discharge (cfs) 24.288 at 12.32 (hrs) water level (ft) 866.117 at 12.32 (hrs) storage (cy) 739.750 Hydrograph 3 Routing Summary of Peaks: 100 YR inflow (cfs) 83.977 at 12.20 (hrs) discharge (cfs) 81.995 at 12.20 (hrs) water level (ft) 866.754 at 12.20 (hrs) storage (cy) 889.217 Thu Apr 28 16:12:04 EDT 2022 Post-ReDevelopment DA A Outflow Hydrograph (From Detention Basin Routings) Time (hrs) Outflow (cfs) 0.0 0.00 11.0 0.00 11.3 0.00 11.6 0.00 11.9 0.09 12.0 0.39 12.1 0.90 12.2 1.29 12.3 1.54 12.4 1.66 12.5 1.71 12.6 1.74 12.7 1.75 12.8 1.75 13.0 1.74 13.2 1.71 13.4 1.68 13.6 1.64 13.8 1.59 14.0 1.55 14.3 1.46 14.6 1.37 15.0 1.24 15.5 1.05 16.0 0.86 16.5 0.70 17.0 0.60 17.5 0.54 18.0 0.50 19.0 0.44 20.0 0.38 22.0 0.30 26.0 0.02 Outflow Hydrograph (1-yr Design Storm) 1.0 Post-ReDevelopment DA A Outflow Hydrograph (From Detention Basin Routings) Time (hrs) Outflow (cfs) 0.0 0.00 11.0 0.06 11.3 0.07 11.6 0.10 11.9 0.52 12.0 0.83 12.1 1.29 12.2 1.69 12.3 6.04 12.4 8.33 12.5 5.94 12.6 4.39 12.7 3.47 12.8 2.89 13.0 2.21 13.2 1.83 13.4 1.81 13.6 1.79 13.8 1.76 14.0 1.74 14.3 1.69 14.6 1.63 15.0 1.54 15.5 1.42 16.0 1.29 16.5 1.13 17.0 0.97 17.5 0.83 18.0 0.73 19.0 0.62 20.0 0.54 22.0 0.47 26.0 0.03 27.0 0.00 9.00 8.00 7.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 -1.00 Outflow Hydrograph (2-yr Design Storm) Post-ReDevelopment DA A Outflow Hydrograph (From Detention Basin Routings) Time (hrs) Outflow (cfs) 0.0 0.00 11.0 0.69 11.3 0.75 11.6 0.88 11.9 1.38 12.0 1.67 12.1 15.09 12.2 21.70 12.3 24.29 12.4 23.18 12.5 19.75 12.6 15.15 12.7 8.12 12.8 5.85 13.0 4.23 13.2 3.53 13.4 3.13 13.6 2.86 13.8 2.64 14.0 2.35 14.3 1.96 14.6 1.83 15.0 1.80 15.5 1.77 16.0 1.74 16.5 1.69 17.0 1.62 17.5 1.55 18.0 1.48 19.0 1.31 20.0 1.11 22.0 0.82 26.0 0.06 27.0 0.00 30.0 0.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 -5.00 Outflow Hydrograph (10-yr Design Storm) .0 Post-ReDevelopment DA A Outflow Hydrograph (From Detention Basin Routings) Time (hrs) Outflow (cfs) 0.0 0.00 11.0 1.78 11.3 1.86 11.6 4.11 11.9 15.92 12.0 21.21 12.1 65.79 12.2 82.00 12.3 62.84 12.4 51.15 12.5 34.81 12.6 24.63 12.7 22.99 12.8 20.17 13.0 11.89 13.2 7.86 13.4 6.56 13.6 5.76 13.8 5.16 14.0 4.68 14.3 4.11 14.6 3.68 15.0 3.42 15.5 3.13 16.0 2.78 16.5 2.51 17.0 2.18 17.5 1.96 18.0 1.84 19.0 1.80 20.0 1.75 22.0 1.61 26.0 0.19 27.0 0.01 30.0 0.00 90.00 Outflow Hydrograph (10-yr Design Storm) .0 Virginia Runoff Reduction Method Water Quality Calculations (COMPLIANCE IS MET THROUGH THE BEST MANAGEMENT PRACTICE OF PURCHASING NUTRIENT CREDITS. THE VRRM BOUNDARY IS DEFINED BY THE LIMITS OF DISTURBANCE SHOWN IN THE EROSION AND SEDIMENT CONTROL PLAN) um Virgil, PopoffRdlo ion MemWRe-Devebpmem Ounpen[e Smaniman-Va. 30 oadu ampwmw.e.esP.damnrea o lma Dart EMP sanded-dsP.tlwrbna k0. mem SI -� wm 5/edeem' Mhlroje n UnCre unaa.dn I No p a Site Information -- ____-- _-- Post -Development Project (Treatment Volume and Loads) Enter Taal Disturbed Na.(anes) 16]9 Cbe[k: amp DesgnS onrlmfion.1]013 dam Suds®Spe[a tineNo I,? brocerattns ntlenttretlm„e[fIY? ✓' -- I � ia[oltllsrurbetlortaenttrttl) f �' Pre -0.eD-1.,d pen[ Land Coder tavesl Amn, Sam, [bID Dmo, rep/oleo spare p.rml - memuwa m 1)x LIx m.v.eannp«I-mwme,e,+la m, .2 m vre.�m nre.o«�I Poo -Development Lead fnuer (a[rvl --- e rore=Volensparelxrevl m nureeq pm,enee,v nspaevre,vres,eeom resJvpe nm --- wnaga ivnlaml-e.,wme.a�aafv weelmamgee ------- --- vus-..MM lmv Nu [AeY .mmn4 Porto. C-ridenl(pr) -- a r6R :I wm0�e:1 pzvspnz Day Dss IMMImgM�n.IrvLDn[Lme/V mp,mm„r«. Das ass °„im Dal Lm[Lmw 'iea sa,>Plnala=NM aas .°n-a.o� wv:al e M • New„nl am n, .ee°n ,. :vam. w.iLm:eeen°nl.waeee.n .�,w=av a 1a ere,..sa,mmY.pa . .uuooanpm.mwt.- p.°.aa..d°per„d mna�..awa �a pme•.,.w .m°°. Ne imlai-,rep,ax r° gap•°oapa- m.�,poal w..I,,.n n,lwRnr am a.m wgl�nn a+lwrea am . rre,n vv oa a�,eroa[e.e, mudad-NMn :MMoomd n and,«.m...l:n,.l zes -- a.iimle.l nn -- aimoe,.a. ne T-..-.slrt- f>a I. m6mp,v:l ass IMmle�.l ass a.ss. nss .Imp.- 11% k_l Treatment Volume and Nutrient Load Treatment Volume and Nutrient Load Demoeaw.w—xu..e a1. axat eam'.oe nova p°n aeon axvt ,n'a m-M1'.m 11 ax a ISM wDmn, r"a`Oitiv �" e"r��11,xss terra tDMoI nen arse ww e .. fg3a re.umw..elati. Ann µ.M.Mo,� Wu=s� a., ves , IIMeR nl°glen[R Lee! ]_D] 6.53 pmft eb en,R lo 1a.31 a9 n aT lln/Yd aYrd' m11Yn1 . aMddd- pile/tea re IMetlM om meelM,.../,.•pprmo�...a.°y«w,.. .-.p «,re.I....na.,e.,elw .mMl e.n +w.,awar°w,su prea,a,.,I.pm„e I°,�e re aLaae uaum°. uaera. mmee uaumal aem. a.. a.a9 mm «.p, p,°pmarre m Ioamema .al.maaelavn NP °. ,. e,.=mpm=°- I�mum�°vvm„pv�ree .-ur..a.,n...11�a,w,v,. e,.r,p..m rm,avq oumyme/µvry Poet-DeVelopment Requirement ftr She Area iP laatl Petlu[[ion 0.epuiretl Ilb/yrl 5.63 Site Results (Water Quality Compliance) Area Checks O.A.A O.A.B O.A.0 A. D.A.E ARMEM FOREST/OVEN SPACE (a[) am O.M 0.00 i0.00 O.W OK. I IMPERVnUSCOVERTRENTFDIa[ 0.00 0.00 0.00�M. OWOK. MANAGEDMRFARENIa[) 0.00 O.00 0.00 00.W OK. MANAGED TURF AREA TREATED (a[) am O.00 0.00 0.00 OK. AREA CHECK OK OK. OK. OK. Site Treatment VOIUMe (ffa) 19,586 Runoff Reduction Volume and TP By Drainage Area O.A. A D.AD O.A. E TOTALRUNOFF REDUMM VOLUME ACHIEVED pF) 0 0 0 LOADAVANIBLE FOR REMOVAL (b/1) 0.00 MM0 0.000.0.00 WMI REOUCTIONAGVEVED (b/yr) 0.00 0.00 O.W am TP LOAD REMAINING (lb/yr) 0.00 0.00 O.W am NMDGEN MD REDUCTION ACHIEVED (b/yr) am O.W 0.00 0.00 O.W 0.00 Total Phosphorus FINAL POST -DEVELOPMENT TP LOAD Qb/yr) 12.31 TP LOAD REDUCTION REQUIRED pb/yrl 5.63 TP WAD REDUCTIONACHIEVED (b/yr) 0.00 W LOAD REMAINING (b/,): 12.31 REMAINING TP LOAD REDUCTION REQUIRED pbM: 5.63 Total Nitrogen (For Information Purposes) POST-DEVEMPMEM WAD (Ib/,r)jj 88.03 NU MEN LOAD REDUCTION ACHIEVED (Ib/yr)jj 0.00 REMAINING POST-DEV M MEM NrMMFN LOAD)Ib/yr) 66.03 OUTFALL PROTECTION COMPUTATIONS OUTIEF PROTECQON OUTFAUOF DETE"ON BASIN PER VESCH PLATE 3.1R1, DEPTH OF SEONE (d)=1.5 X MM STONE DIAMETER deb" ODD= 24.29 CF5 Qdeslgn= 25 CF5 PER VESCH PLATE 3.T8-3 RSU= 0.5 FT NOTE: VDOTCLASSAI STONE HASAMEAN 6 0.9FTANOECCEE050.5FT U= 16 FT w1= 3-DO= 6 FT w2= DO. La= T8 FT OUTLET PROTECTION TO INCLUDE A FILTER FABRIC UNOERIAYMENT KEYED INTO THE EXISTING GROUND A MINIMUM OF 9' AT THE ENDS & ALONG THE PERIMETER. EDGES OF FABRIC SHALL OVERLAP MINIMUM OF 9'. STONE TO BE VOOT CLASS Al STONE WITH THE FOLLOWING DIMENSIONS: a= 16 FT wl= 6 FT w2= 18 FT DEPTH= 1.5 FT DEPTH (d)>_ 1.5 %0.9' DEPTH (d)>_ 3.35' OUTLET PROTECOON INTO DFIENTION BASIN PER VESCH PLATE 3.VRl, DEPTH OF STONE (d)=1.5 x MAX STONE DIAMETER d>_6" mo= 31.78 CF5 Qdeslgn= 32 CF5 (MIN. DISCHARGE FOR I8"OIAMETER PIPE) PER VESCH PLATE 3.188 dSU= 0.3 FT NOTE: VOOTCLASSAI STONE HASAMEAN d5U9.9 FTANO EXCEE050.5 FT = 32 FT wl= 3-DO= 6 FT w2= 00i0.4L 14.9 FT OUTLET PROTECTION TO INCLUDE A FILTER FABRIC UNOERIAYMENT KEYED INTO THE EXISTING GROUND A MINIMUM OF 9' AT THE ENDS & ALONG THE PERIMETER. EDGES OF FABRIC SHALL OVERLAP MINIMUM OF 9'. STONE TO BE VOOT CLASS Al STONE WITH THE FOLLOWING DIMENSIONS: U= 32 FT wl= 6 FT w2= ss FT DEPTH= 1.5 FT DEPTH (d)>_ 1.5 X 0.9' DEPTH (d)>_ 3.35' RIPRAP OUTEALL FOR 36" CULVERT INTO EXS`DNG CHANNEL mo= M.09 CF5 PER VESCH SPEC 3.19, PAGE III-1A (APPEN0IX 3.19-a FOR'RIPRAP DESIGN IN CHANNEL') FORTANGENTFLOW x OUSS FT/FT PER MANNING'S EQN, DEPTH OF FLOW =1.03' (SEE CHANNEL CALLS) PER PLATE 3.19-3, d50= O.TS FT NOTE: VOOT CLAS511 RIPRAP HASAd5D=1.6' PER PLATE 3.194 B= 2 d= 1.03 B/d= 1.9 3 K3= 0.97 PER PLATE 3.19-5 ANGLE OF REPDSE= 3V PER PLATE 3.19 K2= 0.84 "X Kl/K2=d'50= 181N X0.W/0.M-- 20.791N USE21INCHES DEPTH =2Xd50=C2' FINAL DESIGN FOR RIPRAP OUIFIILL CHANNEL OUTLET PROTECTION TO INCLUDE A FILTER FABRIC UNOERIAYMENT KEYED INTO THE EXISTING GROUND A MINIMUM OF 9' AT THE ENDS & ALONG THE PERIMETER. EDGES OF FABRIC SHALL OVERLAP MINIMUM OF 9". STONE TO BE VOOT CLASS 11 STONE AT DEPTH OF 42INCHES. RIPRAP CHANNEL TO EXTEND 30 FEET I WO EXISTING CHANNEL AFTER CULVERT OUTLET.