HomeMy WebLinkAboutSUB200600417 Approval - Agencies 2022-05-27COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
1601 Orange Road
Culpeper, Virginia 22701
Stephen C Brich, P.E.
Commissioner
COMMERCIAL ENTRANCE FINAL INSPECTION CHECKLIST
Date: 24 May 2022 Development:
Developer: Bundoran Farm County:
Address: Winsome Orchard Ln Attendance:
Contact: Doug McAvoy Jr.
Winsome Orchard
Albemarle
Hunter McCardle
Site Maintenance Items
Yes
No
N/A
1.
All roads have been swept of silt, rocks & debris
®
❑
❑
2.
All portable toilets & dumpsters are outside the roadway prism.
®
❑
❑
3.
All construction materials and equipment are be located outside
Roadway the prism.
❑
❑
4.
All reconstructed, repaired, and bare/denuded areas within right -of
way have been seeded & stabilized.
®
❑
❑
5.
Mow all areas within the right-of-way, including all easements.
N
❑
❑
Traffic Control Devices
Yes
No
N/A
6.
All stop signs shall be 30", VDOT approved retro-reflective sheeting
and shall be installed seven feet from the bottom of the sign to the
projected pavement.
®
❑
❑
7.
All street/stop sign and mailbox post larger than 4"x4" shall be drilled
to meet breakaway requirements equivalent to VDOT Standard 602.3.
❑
❑
8.
Any non-standard items are placed under perpetual permit.
❑
❑
Road Construction
Yes
No
N/A
9.
Ensure documentation for passing subgrade and stone is in file.
®
❑
❑
10.
All asphalt joints are acceptable including any previous patches.
®
❑
❑
11.
Check all roadway alignment
❑
❑
12.
Ensure all shoulders and slopes are built according to approved plans.
❑
❑
Entrance Standards
Yes
No
N/A
13.
Check all VDOT slope, drainage easements locations, and site
distance to ensure no encumbrances.
®
❑
❑
14.
Width and throat of entrance matches the Plans.
®
❑
❑
15.
Inspect all sidewalks and handicap ramps.
❑
❑
16.
Inspect any driveway embellishments for compliance.
❑
❑
Rev: 6/24/21
17.
Ensure curb have proper transition at areas that terminate.
❑
❑
18.
All curb and gutter is installed properly, provides positive drainage,
and is free from damage or defect.
❑
❑
Drainage Items
Yes
No
N/A
19.
All unnecessary E & S controls are removed.
®
❑
❑
20.
Any necessary E & S controls are in place and functioning properly.
®
❑
❑
21.
All drop inlets are properly located.
❑
❑
22.
All drop inlets are clear of debris.
❑
❑
23.
All drop inlets have proper invert shaping.
❑
❑
24.
All drop inlets over four feet in depth have steps installed.
❑
❑
25.
All culverts are free from blockage or debris.
®
❑
❑
26.
All entrance culverts are proper size, have proper cover, promote
positive drainage and are free from damage.
®
❑
❑
27.
All outfall areas are free from scour protection and debris.
®
❑
❑
28.
Ensure all private drains are located outside of proposed right of way.
❑
❑
29.
Ensure all ditches drain and any paved ditches are installed in
accordance with plans.
®
❑
❑
30.
All storm drains pass a video inspection IAW VTM 123
❑
❑
31.
Ensure Underdrains are installed into drop inlets or outlet at
appropriate locations and have been inspected IAW VTM 108.
❑
❑
Documentation
Yes
No
N/A
32.
Review project documentation for appropriate density and moisture
testing on trenches and fills.
❑
❑
33.
Review project documentation for all roller patterns and density tests
on stone & asphalt.
N
❑
❑
34.
VDOT has copies of the as -built plan for this section.
®
❑
❑
Notes:
Name: Doug McAvoy Jr. Title: Area Land Use Engineer
Douglas A Digitally signed by
g Douglas A McAvoy
Signature: McAvoy 09:20:57 04'005 Date: