Loading...
HomeMy WebLinkAboutSDP200200040 Correspondence 2002-04-25 COUNTY OF ALBEMARLE Department of Planning& Community Development 401 McIntire Road Charlottesville,VA 22902-4596 TO: S4n.S0.4. S►•itsui FROM: .-{-c ,kev► I'J.JIv Glc�... On.l�.s I Date: Ape(t •Z5, 200�. ��I�t,.� ti. itl JOB NO/FILENAME SDP Oa-Dy0 Carr: e. ( I( ►Pkikst. t M;0or AMllldrrl6lf- We are sending yfollowing the items, LJ Attached, or ❑Under separate cover: Copy of letter Ti Prints Rt'lans TiPlats Specifications Ti Other COPIES DATE DESCRIPTION I i q/.2 y/0.2 Ca4><er 4440-e- I q/23/6x. Rev► ed S;M Play, Thheeseare transmitted as checked below: 1se' For approval As requested 2 For review and comment Approved as submitted For your use Resubmit copies for approval Approved as noted Return corrected prints Submit copies for distribution Returned for corrections L Other Remarks: pi. ►'eii':&., Tl. •.c.�'tkagAie nt.v.S.'h.S a. -iJ itac.ve- Gerft#ii i. '- 4,2,-04/04/6 i. SPIN *y ? v IAy Ai, 2 , a. Signature: AV/------ --4,-.0.--‘e---... McKEE CARSON CONSULTING ENGINEERS LANDSCAPE ARCHITECTS LAND PLANNERS TRANSMITTAL Project: Carriage Hill Phase 2 Minor Site Plan Amendment—Sub-Phasing Plan Project# 9716 To: Dept. of Planning and Community Development Date: 4/24/02 If checked, please: _return enclosures to us acknowledge receipt of Attn: Stephen Waller enclosures Copies: Date: Description: We transmit: 4 (rev)4/23/02 Sub-Phasing Plan x herewith via hand 1 4/24/02 Comment Response Letter under separate cover via as requested For your: use x approval _ review and comment x distribution records Remarks: _ information Please let us know if you have any questions. The following: originals x prints reproducibles correspondence cc: David Cathcart _ specifications shop drawings change order samples slides Disk/CD Signed: Eliot Fendig _ sketch email If enclosures are not as stated,please notify us at once. 301 East High Street Charlottesville,Virginia 22902 TEL:434-979-7522 FAX:434-977-1194 Alt: McKEE CARSON CONSULTING ENGINEERS LANDSCAPE ARCHITECTS LAND PLANNERS 24 April 2002 Mr. Stephen Waller Albemarle County Department of Planning and Community Development 401 McIntire Road Charlottesville,VA 22902 RE:Carriage Hill Phase H Minor Site Plan Amendment(Sub-phasing) (SDP 02-020); Comment Response Dear Stephen: Our office has received and addressed the Minor Site Plan Amendment review comments for the above referenced project(your letter dated April 12,2002). Our responses to agency comments are as follows: Planning: 1. An amended landscape plan is provided to show all approved landscaping within the sub-phases. Zoning(Susan Carol Snead): 1. Parking requirements and calculations have been noted on the Sub-Phasing Plan. 2. Recreational areas completed in Phase I are indicated on Sub-Phasing Plan, as well as the additional tot lot provided in Sub-phase 2C. Note 7 indicates that the preliminary site plan for the entire Carriage Hill Project(Phase I&II)was approved on 1/20/98 inclusive of these recreational areas to meet requirements. Engineering(Glenn Brooks) 1. Stormwater management basin is noted to be included in sub-phase A. Fire/Rescue(Jay Schlothauer) 1. No response necessary. Staff has made the decision to approve. Building(Jay Schlothauer) 1. No response necessary. Staff has made the decision to approve. Mapping(Patrick Powell) 1. Spelling of Weybridge Court has been corrected. Affiliated with Field Sport Concepts,Ltd. 301 East High Street•Charlottesville,Virginia 22902•804-979-7522•Fax:804-977-1194•mc@mckeecarson.com•www.mckeecarson.com w Mr.Stephen Waller 24 April 2002 Page 2 We trust that this addresses the County's concerns for the Minor Site Plan Amendment. If you have any questions or require additional information,please do not hesitate to contact us. Sincerely yours, Eliot Fendig,PE McKee Carson xc: David Cathcart