HomeMy WebLinkAboutSDP200200040 Correspondence 2002-04-25 COUNTY OF ALBEMARLE
Department of Planning& Community Development
401 McIntire Road
Charlottesville,VA 22902-4596
TO: S4n.S0.4. S►•itsui FROM: .-{-c ,kev► I'J.JIv
Glc�... On.l�.s I
Date: Ape(t •Z5, 200�.
��I�t,.� ti.
itl
JOB NO/FILENAME SDP Oa-Dy0 Carr: e. ( I( ►Pkikst. t M;0or AMllldrrl6lf-
We are sending yfollowing the items, LJ Attached, or ❑Under separate cover:
Copy of letter Ti Prints Rt'lans
TiPlats Specifications Ti Other
COPIES DATE DESCRIPTION
I i q/.2 y/0.2 Ca4><er 4440-e-
I q/23/6x. Rev► ed S;M Play,
Thheeseare transmitted as checked below:
1se'
For approval As requested 2 For review and comment
Approved as submitted For your use Resubmit copies for approval
Approved as noted Return corrected prints Submit copies for distribution
Returned for corrections L Other
Remarks: pi. ►'eii':&., Tl. •.c.�'tkagAie nt.v.S.'h.S a. -iJ itac.ve- Gerft#ii i.
'- 4,2,-04/04/6 i. SPIN *y ? v IAy Ai, 2 , a.
Signature: AV/------ --4,-.0.--‘e---...
McKEE CARSON
CONSULTING ENGINEERS
LANDSCAPE ARCHITECTS
LAND PLANNERS
TRANSMITTAL
Project: Carriage Hill Phase 2 Minor Site Plan Amendment—Sub-Phasing Plan Project# 9716
To: Dept. of Planning and Community Development Date: 4/24/02
If checked, please:
_return enclosures to us
acknowledge receipt of
Attn: Stephen Waller enclosures
Copies: Date: Description: We transmit:
4 (rev)4/23/02 Sub-Phasing Plan x herewith via hand
1 4/24/02 Comment Response Letter under separate cover via
as requested
For your:
use
x approval
_ review and comment
x distribution
records
Remarks: _ information
Please let us know if you have any questions.
The following:
originals
x prints
reproducibles
correspondence
cc: David Cathcart _ specifications
shop drawings
change order
samples
slides
Disk/CD
Signed: Eliot Fendig _ sketch
email
If enclosures are not as stated,please notify us at once.
301 East High Street
Charlottesville,Virginia 22902
TEL:434-979-7522
FAX:434-977-1194
Alt:
McKEE CARSON
CONSULTING ENGINEERS
LANDSCAPE ARCHITECTS
LAND PLANNERS
24 April 2002
Mr. Stephen Waller
Albemarle County Department of Planning and Community Development
401 McIntire Road
Charlottesville,VA 22902
RE:Carriage Hill Phase H Minor Site Plan Amendment(Sub-phasing) (SDP 02-020); Comment Response
Dear Stephen:
Our office has received and addressed the Minor Site Plan Amendment review comments for the above
referenced project(your letter dated April 12,2002). Our responses to agency comments are as follows:
Planning:
1. An amended landscape plan is provided to show all approved landscaping within the sub-phases.
Zoning(Susan Carol Snead):
1. Parking requirements and calculations have been noted on the Sub-Phasing Plan.
2. Recreational areas completed in Phase I are indicated on Sub-Phasing Plan, as well as the additional
tot lot provided in Sub-phase 2C. Note 7 indicates that the preliminary site plan for the entire
Carriage Hill Project(Phase I&II)was approved on 1/20/98 inclusive of these recreational areas to
meet requirements.
Engineering(Glenn Brooks)
1. Stormwater management basin is noted to be included in sub-phase A.
Fire/Rescue(Jay Schlothauer)
1. No response necessary. Staff has made the decision to approve.
Building(Jay Schlothauer)
1. No response necessary. Staff has made the decision to approve.
Mapping(Patrick Powell)
1. Spelling of Weybridge Court has been corrected.
Affiliated with Field Sport Concepts,Ltd.
301 East High Street•Charlottesville,Virginia 22902•804-979-7522•Fax:804-977-1194•mc@mckeecarson.com•www.mckeecarson.com
w
Mr.Stephen Waller
24 April 2002
Page 2
We trust that this addresses the County's concerns for the Minor Site Plan Amendment. If you have any questions
or require additional information,please do not hesitate to contact us.
Sincerely yours,
Eliot Fendig,PE
McKee Carson
xc: David Cathcart