April 30, 2001
Cathcart Properties
David Cathcart
1244 Swann Lake Drive #403
Charlottesville, VA 22902
Fax # 296-5460
RE: Carriage Hill II
Tax Map 78, Parcel 20P
Dear Mr. Cathcart:
You have requested a confirmation of the zoning of the above referenced
property. The parcel is zoned R-15, Residential. R-15 allows up to 15 dwelling
units per acre.
A site Development Plan, SDP-2000-13, Carriage Hill Phase II Final Plan, Dated
January 31, 2000 and most recently revised on March 27, 2001 has been
submitted to the County but has not yet been approved. That plan shows 140
dwelling units on the 9.712 acre parcel. The proposed density of 14.41 dwelling
units per acre complies with maximum density allowed in the R-15 district.
If you have further questions, please do not hesitate to contact me.
Sincerely,
John Shepherd
Manager of Zoning Administration
Copy: Tax Map 78, Parcel 20P Reading File
04/30/2001 16:59 8042965460 CATHCART PROPERTIES PAGE 01
RECEIVED
CATHCART PROPERTIES, INC.
COMMERCIAL ac INVESTMENT REAL ESTATE MAY 1 2001
1EVELOPMENT•MANAGEMENT•BROKERAGE
PLANNING AND
COMMUNITY DEVELOPMENT
FAX COVER SHEET
TO:
FAX NO.:
FROM: " ��e.
RE:
DATE:
NO. OF PAGES INCLUDING COVER SHEET: 2
REMARKS:
1244 SWAN LAKE DRIVE,SUITE 387 L/cT
VA 22902 NATIONAL
TEL 804-296.41E8 ti
FAX 804-2% 460 vkriw.p.rtma.lr AASSStI&ION. o�►�so;Yu m
NngmnN54HFW�
04/30/2001 16:59 8042965460 CATHCART PROPERTIES PAGE 02
04/30/o1 ASON 13:23 FAX 804 1 - '4035 ENGR & PUBLIC WORKS eon
•
�sr
COUNTY OF ALBEMARLE � � �. Plan Review Comments
Department of Engineering&Public Works =`*-'"
(804)296-5861 Fax(804)972-403S • 13�?*>'-
Project: Carriage Hill,Phase 2
Plan preparer: Steve Driver,McKee/Carson (fax)
Harry Moore,Engineering Consulting Services,Ltd.(fax 804-353-9478)
Owner or rep.: Rip Cathcart (fax)
fan received date: 27 Apr 2001 (rot wall plans and comps only)
Date of comments: 30 Apr200] (updated)
Lead Engineer: Glean Brooks,Senior Engineer
A.Final site plan and drainage computation comments:(Glenn)
1. Final plan comments have been addressed,
B.11`etaining wall plan comments:(Glenn)
2. Retaining wall comments have been addressed.
C.Stormwater management plan comments:
3. Stormwater management plan and computation comments have been addressed. I have sent the:dal
computation to VDOT for approval end will forward any comment they might have. The stormwater part of
the Water Protection Bond is$15,400.
D.Erosion and sediment control plan comments:0
The Erosion and Sediment Control Plan submitted on.September 5,2000 has been approved subject
to the following conditions.
4_ The Sediment Basin and.other perimeter sediment control measures must be installed and inspected by
the County's Erosion Control Inspector prior to any clearing or grading of the property other than that
necessary for the installation of perimeter sediment control measures. Owner or his representative
must call the County's Inspector to arrange this inspection prior to oleag and grading of the site.
5. Prior to the use of the adjoining property as a borrow area,that property must have an Erosion Control
Permit which covers the area proposed for the borrow area. The currently approved Krogers rough
grading plan is acceptable for that purpose. Also,before the borrow operation con commence,the
County's Erosion Control Inspector must determine that the Carriage Hills Sediment Basin is properly
installed anal operational.
6. A geoteeltnical eegtneee's inspection report for the construction of the dam is required for the
proposed dam construction. The inspection reports must be accepted by the County prier to the
clearing and grading of the site.
7. Culvert inlet protection for end of pipe"i-i"will require a special design to allow this area to serve as
a sediment trap during the fill operation for the dam and the building pad for unit"2-K". Details of
this sediment control measure can be established at the pre-oonstroction conference and must be
approved by the County prior to issuance of the grading permit.
S. The Erosion Control portion of the Water Protection Bond is S125,000. When combined with
David's S 15,400 SWM bond amount,gives a total water protection bond of$140,400.
Engineering Department approval of the construction plans is granted. A grading permit will be issued when
approvals have been granted from all applicable departments and.agencies,and erosion control bond has been
posted,and a pre-construction conference held with The contractor,owner and county staff.
Attachment:(none)
Copy: file File:Carriage OAT phase 2-1757(6)-40c
F A .
u se IN2Wd013A30 JI.LINf111W0O
'1n�WP ONV ONINNYld
000Z o I no
COUNTY OF ALBEMARLE
Department of Building Code and Zoning Services a��'
401 McIntire Road,Room 227 3 11
Charlottesville,Virginia 22902-4596
FAX(804)972-4126 TELEPHONE(804)296-5832 TM(804)972-4012
MEMORANDUM
TO: Steve Driver, P.E. (fax:977-1194)
COPY: Stephen Waller, Planner
COPY: Glenn Brooks, Engineer
FROM: John Shepherd, Zoning Manager /*___
DATE: October 13, 2000
RE: SDP-00-13 Carriage Hill Phase Two Final Plan
Plan Dated January 31, 2000
Plan revised August 1, 2000
Plan revised August 31, 2000
Final tentative approval from the Department of Building Code and Zoning Services is
granted.
Please contact me if you have questions or require additional information.
Cric
Albemarle County
Service AuthèrityRECEIVED
Serving♦Conserving
August 8,2000 AUG 1 n 70011
Mr.Eliot Fendig PLANNING ANt
McKee/Carson COMMUNITY D VeLQPMENT
301 East High Street
Charlottesville,Virginia 22902
Re: Carriage Hill Phase 2
Dear Mr. Fendig:
The plans, entitled "Carriage Hill Phase 2 dated January 31, 2000, last revised August 1, 2000, are
hereby approved for construction. One set of approved plans is enclosed for your records. Any previously
approved plans are voided with this approval. This approval is for basic compliance with the General Water &
Sewer Construction Specifications of the Albemarle County Service Authority and does not relieve the contractor
from responsibility for his work as it relates to the plans and specifications.
The Albemarle County Service Authority requires that a copy of the approved construction plans be on
the job site. It is the contractor's responsibility to mark up a copy of the approved construction plans showing as-
built information and provide this data to your client at the completion of utility installation. Final as-built plans shall
be submitted in a digital format
A preconstruction conference shall be scheduled with the project manager to ensure coordination and
answer any questions. This will be a short meeting to review the project materials,test methods and schedule,
in order to expedite construction. Please have the proper party call me at 977-4511 to schedule the meeting.
This approval is valid for a period of eighteen (18) months from this date. If construction is not in
progress at the end of this time period,the approval shall be void.
(The pressure for water may exceed 80 psi at some meter locations). If you have any questions or if we
can be of assistance,please advise us.
Sincerely,
Chris Stephan, P.E.
Civil Engineer
cc: Rip Cathcart
ifate Health Dept
Planning Dept
Bldg.Codes&Zoning Services
Soil Erosion Inspector
Scott Morris,ACSA Inspector
168 Spotnap Road • P.O. Box 2738 • Charlottesville, VA 22902 • Tel (804) 977-4511 • Fax (804) 979-0698
www.acsanet.com