Loading...
HomeMy WebLinkAboutSDP200000013 Review Comments 2001-04-30 E�OF A y I `IRGIN�P COUNTY OF ALBEMARLE Department of Building Code and Zoning Services 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 FAX(804)972-4126 TELEPHONE(804)296-5832 TTD(804)972-4012 April 30, 2001 Cathcart Properties David Cathcart 1244 Swann Lake Drive #403 Charlottesville, VA 22902 Fax # 296-5460 RE: Carriage Hill II Tax Map 78, Parcel 20P Dear Mr. Cathcart: You have requested a confirmation of the zoning of the above referenced property. The parcel is zoned R-15, Residential. R-15 allows up to 15 dwelling units per acre. A site Development Plan, SDP-2000-13, Carriage Hill Phase II Final Plan, Dated January 31, 2000 and most recently revised on March 27, 2001 has been submitted to the County but has not yet been approved. That plan shows 140 dwelling units on the 9.712 acre parcel. The proposed density of 14.41 dwelling units per acre complies with maximum density allowed in the R-15 district. If you have further questions, please do not hesitate to contact me. Sincerely, John Shepherd Manager of Zoning Administration Copy: Tax Map 78, Parcel 20P Reading File 04/30/2001 16:59 8042965460 CATHCART PROPERTIES PAGE 01 RECEIVED CATHCART PROPERTIES, INC. COMMERCIAL ac INVESTMENT REAL ESTATE MAY 1 2001 1EVELOPMENT•MANAGEMENT•BROKERAGE PLANNING AND COMMUNITY DEVELOPMENT FAX COVER SHEET TO: FAX NO.: FROM: " ��e. RE: DATE: NO. OF PAGES INCLUDING COVER SHEET: 2 REMARKS: 1244 SWAN LAKE DRIVE,SUITE 387 L/cT VA 22902 NATIONAL TEL 804-296.41E8 ti FAX 804-2% 460 vkriw.p.rtma.lr AASSStI&ION. o�►�so;Yu m NngmnN54HFW� 04/30/2001 16:59 8042965460 CATHCART PROPERTIES PAGE 02 04/30/o1 ASON 13:23 FAX 804 1 - '4035 ENGR & PUBLIC WORKS eon • �sr COUNTY OF ALBEMARLE � � �. Plan Review Comments Department of Engineering&Public Works =`*-'" (804)296-5861 Fax(804)972-403S • 13�?*>'- Project: Carriage Hill,Phase 2 Plan preparer: Steve Driver,McKee/Carson (fax) Harry Moore,Engineering Consulting Services,Ltd.(fax 804-353-9478) Owner or rep.: Rip Cathcart (fax) fan received date: 27 Apr 2001 (rot wall plans and comps only) Date of comments: 30 Apr200] (updated) Lead Engineer: Glean Brooks,Senior Engineer A.Final site plan and drainage computation comments:(Glenn) 1. Final plan comments have been addressed, B.11`etaining wall plan comments:(Glenn) 2. Retaining wall comments have been addressed. C.Stormwater management plan comments: 3. Stormwater management plan and computation comments have been addressed. I have sent the:dal computation to VDOT for approval end will forward any comment they might have. The stormwater part of the Water Protection Bond is$15,400. D.Erosion and sediment control plan comments:0 The Erosion and Sediment Control Plan submitted on.September 5,2000 has been approved subject to the following conditions. 4_ The Sediment Basin and.other perimeter sediment control measures must be installed and inspected by the County's Erosion Control Inspector prior to any clearing or grading of the property other than that necessary for the installation of perimeter sediment control measures. Owner or his representative must call the County's Inspector to arrange this inspection prior to oleag and grading of the site. 5. Prior to the use of the adjoining property as a borrow area,that property must have an Erosion Control Permit which covers the area proposed for the borrow area. The currently approved Krogers rough grading plan is acceptable for that purpose. Also,before the borrow operation con commence,the County's Erosion Control Inspector must determine that the Carriage Hills Sediment Basin is properly installed anal operational. 6. A geoteeltnical eegtneee's inspection report for the construction of the dam is required for the proposed dam construction. The inspection reports must be accepted by the County prier to the clearing and grading of the site. 7. Culvert inlet protection for end of pipe"i-i"will require a special design to allow this area to serve as a sediment trap during the fill operation for the dam and the building pad for unit"2-K". Details of this sediment control measure can be established at the pre-oonstroction conference and must be approved by the County prior to issuance of the grading permit. S. The Erosion Control portion of the Water Protection Bond is S125,000. When combined with David's S 15,400 SWM bond amount,gives a total water protection bond of$140,400. Engineering Department approval of the construction plans is granted. A grading permit will be issued when approvals have been granted from all applicable departments and.agencies,and erosion control bond has been posted,and a pre-construction conference held with The contractor,owner and county staff. Attachment:(none) Copy: file File:Carriage OAT phase 2-1757(6)-40c F A . u se IN2Wd013A30 JI.LINf111W0O '1n�WP ONV ONINNYld 000Z o I no COUNTY OF ALBEMARLE Department of Building Code and Zoning Services a��' 401 McIntire Road,Room 227 3 11 Charlottesville,Virginia 22902-4596 FAX(804)972-4126 TELEPHONE(804)296-5832 TM(804)972-4012 MEMORANDUM TO: Steve Driver, P.E. (fax:977-1194) COPY: Stephen Waller, Planner COPY: Glenn Brooks, Engineer FROM: John Shepherd, Zoning Manager /*___ DATE: October 13, 2000 RE: SDP-00-13 Carriage Hill Phase Two Final Plan Plan Dated January 31, 2000 Plan revised August 1, 2000 Plan revised August 31, 2000 Final tentative approval from the Department of Building Code and Zoning Services is granted. Please contact me if you have questions or require additional information. Cric Albemarle County Service AuthèrityRECEIVED Serving♦Conserving August 8,2000 AUG 1 n 70011 Mr.Eliot Fendig PLANNING ANt McKee/Carson COMMUNITY D VeLQPMENT 301 East High Street Charlottesville,Virginia 22902 Re: Carriage Hill Phase 2 Dear Mr. Fendig: The plans, entitled "Carriage Hill Phase 2 dated January 31, 2000, last revised August 1, 2000, are hereby approved for construction. One set of approved plans is enclosed for your records. Any previously approved plans are voided with this approval. This approval is for basic compliance with the General Water & Sewer Construction Specifications of the Albemarle County Service Authority and does not relieve the contractor from responsibility for his work as it relates to the plans and specifications. The Albemarle County Service Authority requires that a copy of the approved construction plans be on the job site. It is the contractor's responsibility to mark up a copy of the approved construction plans showing as- built information and provide this data to your client at the completion of utility installation. Final as-built plans shall be submitted in a digital format A preconstruction conference shall be scheduled with the project manager to ensure coordination and answer any questions. This will be a short meeting to review the project materials,test methods and schedule, in order to expedite construction. Please have the proper party call me at 977-4511 to schedule the meeting. This approval is valid for a period of eighteen (18) months from this date. If construction is not in progress at the end of this time period,the approval shall be void. (The pressure for water may exceed 80 psi at some meter locations). If you have any questions or if we can be of assistance,please advise us. Sincerely, Chris Stephan, P.E. Civil Engineer cc: Rip Cathcart ifate Health Dept Planning Dept Bldg.Codes&Zoning Services Soil Erosion Inspector Scott Morris,ACSA Inspector 168 Spotnap Road • P.O. Box 2738 • Charlottesville, VA 22902 • Tel (804) 977-4511 • Fax (804) 979-0698 www.acsanet.com