Loading...
HomeMy WebLinkAboutWPO201100037 Plan - As-built 2022-06-01WPO 201100037 ALBEMARLE COUNTY, VIRGINIA GENERAL NOTES OWNER: GLENMORF ASSOCIATES LIMITED PARTNERSHIP 1750 PIPER WAY KESWICK, VA 22947 TELEPHONE: (434)817-0525 ENGINEER: COLLINS ENGINEERING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 TELEPHONE.- (434)987-1631 FAX: (434) 245-0300 CONTACT. SCOTT COLLINS, P.E. EMAIL: SCOTT@COLLINS-ENGINEERING.COM TAX MAP NO.: 093A5-00-00-00100 AREA: 46.281 AC. ZONING: PRO TAX MAP NO.: 09400-00-00-01600 AREA: 52.500 AC. ZONING: PRO USE.- SINGLE-FAMILY RESIDENTIAL SUBDIVISION STREETS: CURB & GUTTER TOPOGRAPHY: TOPOGRAPHY PROVIDED BY LICENSED LAND SURVEYOR COMMONWEALTH LAND SURVEYING, LLC IN MARCH, 2011. - VEGETATION: ROLLING GRASS FIELD WITH EXISTING TREES u NOTE: GENERAL NOTES ABOVE HAVE BEEN SOURCED FROM 'GLENMORE - SECTION K2B PHASE B WATER & SEVER PLAN' BY SCOTT COLLINS. COLLINS ENGINEERING DATED 11/30/2011. CURRENT OWNER/DEVELOPER GLENMORE ASSOCIATES LIMITED PARTNERSHIP 1750 PIPER WAY KESWICK, VA 22947 ENGINEER COLLINS ENGINEERING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 434.293.3719 NOTE: AS -BUILT PLANS PREPARED BY ROUDABUSH, GALE & ASSOCIATES VICINITY MAP SCALE: 1" = 2000' ALBEMARLE COUNTY RECORD DRAWING REQUIREMENTS (AS -BUILT) FOR VSMP (DISPOSITION IN ITALICS) •• A SIGNED AND DATED PROFESSIONAL SEAL OF THE PREPARING ENGINEER OR SURVEYOR. (INCLUDED) • • THE NAME AND ADDRESS OF THE FIRM AND INDIVIDUAL PREPARING THE DRAWINGS ON THE TITLE SHEET. (INCLUDED) • • THE CONSTRUCTED LOCATION OF ALL ITEMS ASSOCIATED WITH EACH FACILITY, AND THE INSPECTION RECORDS TO VERIFY PROPER DIMENSIONS, MATERIALS AND INSTALLATION. THE ITEMS INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: 1. INSPECTION RECORDS AND PHOTOGRAPHS FOR PIPE TRENCHES AND BEDDING, INCLUDING UNDERDRAINS. (NOT INCLUDED, TO BE PROVIDED BY CONTRACTOR IF REQUIRED) 2. VIDEO PIPE INSPECTION FOR ANY PIPES WHICH ARE NOT ACCESSIBLE OR VIEWABLE. (INCLUDED) 3. UPDATED LOCATION WITH GEO-COORDINATES OF ALL FACILITIES. (INCLUDED) 4. VERIFIED DRAINAGE AREA MAPS FOR THE DRAINAGE AREA TREATED, AND FOR DRAINAGE TO THE FACILITIES. (INCLUDED - NO SIGNIFICANT DEVIATION IS EVIDENT) 5. CURRENT PHYSICAL AND TOPOGRAPHIC SURVEY FOR ALL EARTHEN STRUCTURES. PONDS SHOULD INCLUDE A SURVEY OF THE POND BOTTOM. SURVEYS SHOULD VERIFY POND VOLUMES ARE PER DESIGN. CORRECTIONS MAY BE REQUIRED FOR ALTERATIONS FROM THE DESIGN. (INCLUDED) 6. PLANTS, LOCATION AND TYPE. (N/A) 7. PLANS AND PROFILES FOR ALL CULVERTS, PIPES, RISERS, WEIRS AND DRAINAGE STRUCTURES - DISPLAY THE INSTALLED TYPE OF DRAINAGE STRUCTURES, CULVERT/PIPE SIZE, WEIRS, MATERIALS, INLETS OR END TREATMENT(S), INLET AND OUTLET PROTECTION, ALIGNMENT AND INVERT ELEVATIONS COMPARED TO DESIGN. (INCLUDED) 8. COMPUTATIONS: FOR SIGNIFICANT DEVIATIONS FROM DESIGN, PROVIDE SEALED COMPUTATIONS VERIFYING THAT THE AS -BUILT CONDITION IS EQUIVALENT OR BETTER THAN DESIGN. (N/A - NO SIGNIFICANT DEVIATION IS EVIDENT) 9. DITCH LINES - DISPLAY THE CONSTRUCTED LOCATION OF ALL DITCH LINES AND CHANNELS, INCLUDING TYPICAL SECTIONS AND LININGS. (N/A) 10. EASEMENTS - SHOW ALL PLATTED EASEMENTS WITH DEAD BOOK REFERENCES LABELED. FACILITIES AND DRAINAGE MUST BE WITHIN PLATTED EASEMENTS. PROVIDE COPIES OF RECORDED DOCUMENTS. (INCLUDED) 11. GUARDRAIL, FENCES OR OTHER SAFETY PROVISIONS - DISPLAY THE CONSTRUCTED LOCATION OF ALL SAFETY PROVISIONS; FENCES, GUARDRAIL, INCLUDING THE TYPE, LENGTH AND APPLIED END TREATMENTS, COMPARED TO DESIGN. (N/A) 12. MATERIAL LAYERS • •BIOFILTER MEDIA, STONE LAYERS, SAND LAYERS, KEYWAYS AND CORES MUST BE VERIFIED AS TO MATERIAL TYPES AND DEPTHS. INCLUDE INSPECTION REPORTS, BORING OR TEST PIT REPORTS AND MATERIALS CERTIFICATIONS. BIOFILTER MEDIA MUST BE AN APPROVED STATE MIX. (NOT INCLUDED, TO BE PROVIDED BY CONTRACTOR IF REQUIRED) 13. ACCESS ROADS • •SHOW LOCATION OF ACCESS ROADS, SURFACE TREATMENT, DRAINAGE, ETC, AS APPLICABLE. (INCLUDED) 14. COMPACTION REPORTS ARE REQUIRED TO VERIFY FILL COMPACTION IN DAMS. (NOT INCLUDED, TO BE PROVIDED BY CONTRACTOR IF REQUIRED) 15. MANUFACTURERS CERTIFICATIONS FOR PROPRIETARY BMPC CERTIFYING PROPER INSTALLATION AND FUNCTIONING. (N/A) SHEET INDEX SHEET 1 ------ AS -BUILT COVER SHEET SHEET 2 ------ AS -BUILT SWM FACILITY OVERVIEW SHEET 3 ------ AS -BUILT SWM FACILITY 1 1. THE ORIGINAL DESIGN PLANS AND PROFILES USED FOR THIS AS —BUILT SOURCED FROM "AVON PARK DEVELOPMENT ROAD PLAN" BY SCOTT COLLINS, COLLINS ENGINEERING DATED JUNE 17, 2021. 2. FIELD WORK WAS COMPLETED ON MARCH 04, 2022. 3. SUBDIVISION PLAT: DB: 4237 PG: 322 4. = DENOTES AS —BUILT INFORMATION 5. THIS REVIEW DOES NOT IMPLY IN ANY WAY; a. THAT INSPECTIONS WERE MADE DURING CONSTRUCTION, b. TO THE QUALITY OF THE WORK, OR C. TO ANY ELEMENT OR STRUCTURE NOT VISIBLE OR DEPICTED ON THE PHYSICAL SURVEY. I, JIM TAGGART, HEREBY CERTIFY THAT, TO THE BEST OF MY KNOWLEDGE, THIS AS —BUILT PLAN REPRESENTS THE ACTUAL CONDITION OF THE STORMWATER FACILITY, AND THAT ALL ASPECTS OF THE STORMWATER FACILITY WERE CONSTRUCTED SUBSTANTIALLY IN ACCORDANCE WITH THE APPROVED DESIGN PLANS, UNLESS NOTED OTHERWISE. *ROAD. UTILITY, AND OTHER DESIGN DATA TAKEN "GLENMORE — SECTION K213 WATER & SEWER PLAN" BY SCOTT COLLINS, COLLINS ENGINEERING DATED NOVEMBER 30, 2011. AS —BUILT DATA FIELD SURVEYED BY ROUDABUSH, GALE & ASSOCIATES, INC. ALL HORIZONTAL AND VERTICAL VARIATIONS BETWEEN APPROVED PLANS AND THE AS —BUILT FEATURES ARE INDICATED ON THESE DRAWINGS.* m S �I w t- ^ �o V m Zd O z 0(D 2 QI ir �� 3 J = OU aN m w wo w 0U) oQ �QCC OD JZ ec=.� Z Z r� V j ^ U) o N x wO 9 0- N m tll`.TJ.It' w U N w Z a >0 a cn J N j _ CO OQ. LU W 0 CO cr w Si U z 0 a z 0 0 m N z J 0 a o I � N N H a o � o MIA z ti,r OF �po-1 r 9 my L. Taggart Lfc. No. 22841 �41 5/12/22 ,1 SSIoNAL EN a z 0 cr m > z N Z o a_ LLJ Q wLLJ F- J m L1J a it Li mO UDm a CL Q 'T U W �zLij a� ° > J J U) 0 U 0 DATE: 5 12 2022 SCALE: AS SHOWN JOB: GLENMORE K2B FILE 387 SHEET 1 OF 3 IJ U o W �o U z Z d N O O`D :Y� a° a� J o J = OU a� m w Q(n �O W VQ �Q� r� Z V O > o x� � o W Z wP O � N O � W N v Q Z 7 [) U vw J a J } V > _ � W O i./ uu O fil w � vt Q P = r u SWM FACILITY 1 SEE SHEET 3 ro r/.t^ % / / a ..3%;"?r`•t.-i.^=:'�•C:1,'\ v �i. ;,i®`'. {•..h \ 1 '�_ . / % \ \ �_/-�e` �L �.— �./ .�—._iH .. _L;r��-?l, .�.��-%mot: r'i`"'^K:i1'^,• I t a 1 f :-k \ y t EET F�OVUTc= o.i9hrs '�.r-y • �` �/ / / / / /� - `�' iA'ij .."„yT®1'. :,a;�•r}tiµ .�..., -�E��' ` `a\\ , \ \ \ \ r `\ ./ \ \ \ \ \ / / \ \ M d l - \ \ J',r t\ • s } `\ \ \ / / R / \ C A\NNE O Ll� TC O1. 1 rs. n •y ,�;� \..,.: � � � . '•,�.'. � -�_ \ �.rll ;'3 •:; <;..:� \ e� �;' I \\ a100 YEAR \ \\ \ \\ ° \ o \ \ `�f / ♦ 4 FINA�Tc-o �ihls \ / \� `, r r..i.. , \ a;, FLOOD PLAIN 1 \ • I I l WM FACILITY TO HAVE A SWM EASEMENT 100' STREAM BUFFER \ _ `�! Aye ` \ �/���zy=HI SCS CAL > I ® � ��\ `�� �• ' �\` �W\ \ \' \ \ \ \ ' i-- \ � ` �• % ` / � /♦, � ♦! \ A\ � \ E C.UC TIONS 11 % '\ R DD TIU, L D TAI�\S / ./ �. \ r+,l, • ^� �,*.' Al ,E• .\ \ .\ \ \ �.. / •.-.,__ '-� \ \ \'`, t / / ITH CONNECTION TO CARROLL CREEK ROAD f - �\ �,' :�•,, x c \ \ / \ \ \ ' \ ♦ / \ \ - J OR ACCESS AND MAINTENANCE �• // \ w,;, y , \\� t \ \\ \ I $ / \ \ \ \ t \ I ` ® I ♦ \ \ \ r /� NO SIGNIFICANT \ \ \, gE� UBI�F TT L �'ACKA r \ F R MS-1 & HAAIN \ \ ♦� %� , \ CHANGES TO DRAINAGE. >::•. \\\ �\ \\� \ 4 s/ \ ` I \ �• \ \ ® „ 4 .�, d BQtJA Y' R S S S , \ J�� / /iAREA ARE EVIDENT ` ",'.a>yt` \c\�\�/+h1D,l� c�11�T9N/ / �\ \ ` \ I I I I I r ,(r'\ 1 !��\ �\ ,\ t� \ o DEDDETENTIONFACILITY#1/ `� �'/� ( \� \i' w' P \ \\` \�\\ \�' .� / / /1 \ ` • \ �� , \ �\ l It I ,1�� _ " _ \ �� \ �\ HEET 16 FOR DETAILS /` / tr fly/ , 4 ` ��\��t''' \, `y EXISTING STREAM . / , ` \ CONTRACjO LLINSTALLA i I , I I I I \ ♦� 1 �Q A' #�' \ _ - \ t } 4RAPEZ IDALRIPRAPDITCH-hqMTf�E1 , , \ \�\, �, OIUT �TsW # OT EHEAbC 0 / �_ ' TC 21 h13• \�� , ;,,.d'g•'� ;`i.`,.- \\ '� .�� 505, NE�ADE UA YE�(HIBIT l� ! •\ '`„1qo '9 '� Q \ L �i•+r \ -/ HE XISTING INTER,3,5TTT FIT EAM U NG ` ( t� \ T , \ •s'd , yj!y, °.,;, + . \ \ & REPORT FOfiAD ITIONA 1T" Fi VTR �If ♦ `'� CN= \h O 1v "Y, .,fit•, \'/".. ,MS,19 _ p �' --� �DO sTD/EC-s�CL.II TYR@8 IPRAPW/ �� \ e` �../` 1,. `0. 77��1� \' 'A \� i \9EG�AA[�ETAJLSICALCULAT NSE E ' E� �r \ �d� C� g +'St'a's /GE&?TEMII, FIL RFA�(fIC,UNO RLj�YM �/ m "`-,a'' 5 , y � �., ` � �• \ OY'7 58 f {' P DI CM WIIJTH-2e,'0 TH OF DITC�3a', ♦ l .. `` - -� \ ` ` _ -off- \ ` /�• ! ♦ ��� l 5.4k C•,! v / \ \ \ biN W '.{? 2. �= t798 cfs � sIUESL0YKS-:t § DE PTH(F TDa a') O' 1 \ \ \ C \ \ ;a F r .. \ xs cO \ ♦ a 3 �// \" = n ? ' ��, i't: h�a; ., '•/ ` l I "�E, SWM FACILITIES�fO HAVE SWM EASEMENTS \_ A��� \ \ i I i a � / ' � , `�� �/ / / \\ \\ \ •-_. --__ ,.,� k',?"�'IA�'' �` ' , 2 ah4 Lp�� a' '•\ s � WITH CONNECTI�IN TO CARROLL CREEK ROAD ` '-•� ��- 1 ` � \\� //'y ♦ / // � g ( `,r;„„ ?' . \ ` , 1 FOR ACCESS ANI? MAINTENANCE 1 � / / � "\ `�\� � ,� \ -� ■ � �` � \•\ '*: '�,.:'�U''l';•' .? ;; \ .� `1 0 e .� � .,_ �++- __ ,yam \ -� �.... '�- ` 1'�1, _ y 1 1 1 � ♦ ( �J]Jy'�"1/ ti .N-i V --� * % �� .� � � —•-O ..-� .1 �/ \ r., ,\•� ;' 1 ;., .yw'ai'a •\ 1 ti M3='IB.�.� \` -� ''\ � � Vie. 1 � ^�_ � '\ 'p� � / I I / /� 1 �' � `*. �' \��\ � `� � �\ 1,� � -�j ,� 'v � �, \' .\•... a.'j•1 �1A1 ..;,.v{.�,.•�4'.'', ` � �\ .``�'\ � � ("^-�f`-,�'`.\"^'\ �� ` I-`.- "\ / � f � V �/ ♦ e / .`� � � \. ,T -� � \ � �" •• ;�;,. fit', \ s,# "� '.,,, � "�• \., '/ CL III RCP RISER 8 BARREL FROM \ ,\ l \ C y11 : �� -/ \ d `� �C� ♦ \ •� k � ? *r . "• 1, '�I�&tia `t �SEDIMENT BASIN TO REMAIN / �' ♦ ♦ See, `` r 0#2., \ O � sEc --` • � 2 \\ -,� \ IN PLACE AND CONVERTED TO / ♦ r � `` u+ N S g 'Puy �, - \ THE OUTFALL SYSTEM FOR THE ♦ / / r- '` \ o \ %PROPOSED EXTENDED DETENTION ♦ / / 1 � � , '\ _.-- - - 1 ' � ' J � i /�/ •r• � \ \ \ \ SHEETPL N{TZ�o.l�hrs V + i CN=794� `� 5"� ` \` :�► ` =-y i FACILITY(TYP.) r I 1 "AI COG L W c= ` o1N �` ` \ C�1AN EL I�QW T�o. hrs.\ \ ' - �! \ \ 8Cj EXTENDED DETENTION F LAY o FINAI Tc o.16h(s \\ \ �� _ \ •' ' A 1 - / '♦�k / / / // ( SEE SHEET 17 FOR DETAILS x \ SE�\z�y H U� SSALCULA%kON$ \ . \ `` a �► \ \ \ \\ \\ ` OA�� \ r- - - ' / ( I �// I �� I I % // \ \ �PtiT op F\�t A'pD�TI NAL DETAILS \ �, �►� \\ �' \ \\ 1 \ \ ' -- ♦ — s --M1 - / , \ dd♦ i / r�� ♦ \41* J T SEE SEXTEHEET DB FOR DETAILSETENTION ILITY #2 I / 411, \ //^ I Jimmy L. Taggart NOTE. \ -- i , \ ♦ , ` \ / ' / �, `` / w l d / ✓ f / i I uc. No. THE THREE EXTENDED DETENTION BASINS SHALL BE DESIGNED TO TREAT 35%OF22841 THE IMPERVIOUS AREA. MINIMUM PHOSPHOROUS REMOVAL RATES FOR FACILITIES 5/12/22 1, 2 AND 3 ARE 1o%, 25%AND 14%RESPECTFULLY. THE FACILITIES ARE ALSO \ \ - \ \ \ _ / \ SWM FACILITY 2 NOT INCLUDED d DESIGNED FOR A MINIMUM OF A3o HOUR DRAWDOWN WITH 2xTHE WATER QUALITY IN THIS AS -BUILT PLAN SET VOLUME, FOR EVIDENCE OF THE WATER QUALITY TREATMENT, WATER QUALITY �� d VOLUMES & DETENTION COMPLIANCE, PLEASE SEE THIS SHEET AND THE General construction notes for Stormwater Management plans r" _ ♦ �,f \�i / yr� ' / / I / FOLLOWING SWM DETAILS & CALCULATIONS. 1. All dams and constructed fill to be within % of maximum d density � � v � - � � � �• � — / 95 dry Y I PLEASE NOTE THE SOIL AROUND THE SPILLWAYS ARE TO,BE AT 95%COMPACTION and 2% of optimum moisture content. All fill material to be approved by l �` '► o ✓ ♦ / t / / / / „ I / WITH AN IMPERVIOUS CORE AND CUT-OFF TRENCH. THE EMERGENCY SPILLWAYS a geotechnical engineer. A geotechnical engineer is to be present during ) ` %s // .���♦� j ARE TO CONCRETE LINED AND DOWNSTREAM OF THE SPILLWAYS ARE TO BE GRASS construction of dams. / l J �\ j / _ ♦ ♦ �1 / / f G, P C � LINED. THE FOREBAY SPILLWAYS SHALL BE CONSTRUCTED OF GABION BASKETS z. pipe and riserjoints are to be watertight within stormwater 15' SWM ACCESS 8 �; \� % /e ♦ ♦� / i J / j , I ,,,CAL I l I l \ WITH "STONE STONE ON THE UPHILL SIDE OF WEIR. management fdC1IIt1eS. lMAIlNTENANCE EASEMENT ! \_ i ` i SHEET FLOW TcT- 0.15�rs. e / 0 0 0 / ao I , ` ago Q ADDITIONALLY, ALL EXISTING BIOFILTERS SHALL REMAIN IN PLACE FOR AS LONG AS 3• g P rY P / / / / / '\ �f _ CONC, FUOW Tt= o.oihris' J t / / Fortem ora sediment traps or basins which are to be converted to i' \\` _._ ., .; •� POSSIBLE DURING CONSTRUCTION. permanent stormwater management facilities; conversion is not to take ' \ l +# �j/ CHANNEL FL w T5� o/ohrsf w_ p g f ; \` \� �t - ' - / FINAL Tc= o46hrs / > > lace until the site is stabilized and "•r. ... ,. rF '� / /SEE 24-Hg6R Sq� I�EU TIONS / �iI�N �T I \ m > � ALL LOAN -FLOW ORIFICES ARE DESIGNED FOR A 3o-HOUR DRAWDOWN TIME FOR p / C \, \ -- / I i � Z w ,permission has been obtained from the Count erosion control inspector. f_ / / FOft ADP TIOf�AL �EThIL / / / / /�/ $Q f I I `` / Z� N > TWO TIMES THE WATER QUALITY VOLUME IN ACCORDANCE WITH DCR'S VSMH. p Y p \ / - O Q J �WN Q� J 0. w Q J mp cnm Q Q a LL Q� _� �w 11N > J s w J_ rl > N m � N O Q U to DATE: 5/12/2022 SCALE: AS SHOWN JOB: GLENMORE K213 FILE: 387 SHEET: 2 OF 3 / / / :u...,• ,,;`y'w1':. , a L'"I -UTILIZE EXISTING BASIN/ GRADINC & CRkATE MORE' VOL fffE VIA THE PROPOSED CUT SLOPES. 0, UNDER NO CIRCUlAfSTANCE - 1 SHALL THE CONTRACTOR TE FILL HrITHIN TL{ rr f�. •' =.'•f -,' ``t B SIN OR FLOODPLAI I,�r ,, ,r•St�;J��_ M �,w L",5= '�)$�QPES� \ \ ;yo�,w,, A',,`,,•:.'SHALL 7o, eg.r;:'', Y ,ij ,,',:'A' Q�'f �gA}�N��SURFAE \ \ \ / 1 r L �r /.;`'�/ / <<r,yj'�4;'`�.p.kF '•� \ ,� �r '•'} / l}iC��G\,.tr',ya, •w.;.A ' / \ \ n"h . a.. ��, ,... �' ,,,�, • �,,,f, .,y ill -I I =III= -I � I_ \ , � 7II;;�P•, � ��y�, ,� _ ` �r �„ � I l 1111-1 l l f_I�- ° ,���,�'�, 71, 'r �•✓,.`-'•.- '�'-' .',�Csz, yj=ni Vim:.•.. t; ;P,�,,• a' � -1-�'i-I. J f • iNv. our :ryz7se��:;.;,;:� ,•�;, ,..`:'�` coN'c.'dsi RL/REv,° SPILL#,rAY AT ` ELEV = \30b.50 V 'PROPOSED VAR. #'IDTH ST3'M \ J FACILITY EASEMENT e 1 0Y I RCP I R R =11 UPSTREAM BUFFER W \• / O W U1=III W� --__ W _ P FOREBAY TOP OF •\ DAM ELEV. = 300. 0& ` l O LVERT �1NDERNEATH o SS EARTHEN ROAD TO Il FOREBAY & 5' WIDF/FOREB8Y SPILLWAYJ ! ALL/ ROADSIDE DITCH SHALL BE COPSTRUCTED F GABION 1z o 0 o C O S#rM FACILITY BASKETS WITHVDOT# COARSE--` AGGREGATE ON THE UPHILL SIDE OFTHE WEIR &CLASS I RIPRAP ON THE DOWNHILL o o SIDE OF THE WEIR. GEOTE ILE FILTER/ J FABRIC tWDERLAYMENT-SHALLBE/ - � INSTALLED. WEIR SHALL HAVE in. SIDE O SLOPES w/ A CREST ELEV.=29¢.o' 5'( )x9'(L) � MIN. WATEQUALITY 1�OLUME R QUIRED \ O(2x)rQV)= 4/,49)Ff. IYATTR \ QIj!LIT'Y VO4UME \ PRO'VIDEJJ- 1 A62 f \ 10 , OP OF D{4M AT LI'V = 3OZ 0 \ \ ' � " #'IDE FLAT BENCH AT THE \ \ EDgE OF THE EafRANAjVEWT ON CUP -SIDE OF THE FACILITY w/ 3:1 SLOPES ON THE INTERIOR�OF TIIE FACILITY & 2.1 SLOPES \�y ABOVE THE BENCH TYINC\INTO\ EXISTING GROUND. ll= CULVERT UNDERNEATH III_-1 `4CCESS EARTHEN\ROAD TO \\QUITF44LL DITCH INTO S#'df \ 1=I F FACILITY I I I=1 df Ar FOREBAY\VOLUME REQ'B= 1,123cf. FO �EBAY -1 I \�0LU4fE `PROVIDED= 417cf =1II 11 \ MULTI -STAGE RIS°F ltif � \ � � � _-�- ELEV a00 w \ 0 FIVE_„ MFD-FLU ORIFICES ® ELSE =,99A6� \, `< �c ONE -OP' LOIY-FLOTY 1 W ORIFICE ®PEV-- 9T1�1 ' W= i SWM FACILITY 1 DRAWING FROM APPROVED PLANS BY COLLINS SWM FACILITY #1 ENGINEERING DATED 11/30/2011 SCAM. P• 20' ter QIr Routing Method: storage -indication Basin Input Data -PR6P95Ei9 BWERGENCY SXTENDED DE, SPILLWAY CREST Animum Forebay volume= Web inches per imi 2-Year, SCS z4-hour storm 7ContourAreas ELEVA7/QN= dM50 inflow(cfs) io.zozat 1z.95(Ms) FJevatron(ft) Area(sf) Computed Vol.(cy) 299.8' RD?RAP ofebey Depth to range from 4' 0 NOT discharge (cfs) 9.079 at 12_01(hrs) 292.00 3.00 0.0 ` enpemus Area= AS -BUILT 3,894 sf water level (ft) 3oo.42iat i2m2 fts) 294.00 127_00 3.7 linimutn Forebaf Vol me= DATA -- cf storage (M 24o.374 295.00 269.00 0.9 linimum Water Quality Volume= 0.5 inches per imperWOBI 298.00 18.00 88.2 w-Year, SCS 24-hour Storm z98.00 uB7.00 88.z / Ainimum Water Quality Volume= 2,246 of inflow(cfs) 2ocooat =95(hrs) 300.00 2057.00 2o6.9 HANSON CONCRETE / \ x Minimum Water Quality Volume= 4,491 of discharge(cfs) 1g.654at 1z.gs(hrs) 307-00 3016-00 393.6 ANTI -VORTEX z RISER TOP=301.8' waterlevel(ft) 3oo.6giat =95(hrs) TRASHRACK ry/ OVERFLOW=299.6'=letlation Corresponding to 2x WQV= 298.68 ft storage(cy) 263 475 Start-Elevation(ft) 292.00 Vol.(ty) 0.00 / (5) 6" ORIF. AVG.=298.8' / TOP PERFORATED 6" Extended Detention Basin #'I PVC=298.9' 1oo-Year, SCS 24-hour Storm 5 Outlet Structures L0, 29 HDPE=290.7' ,._a Total Area of inflow 39-836at =95(hrs) Outlet structure Outlet structure 3 ion Forebay Volume VoIU discharge(cfs) 39.4o8at 1vg5(hrs) Orifice Culvert TRASH RACKS SHALL BE' / Ill RCP AOILYt Cor( awn(tt) Bum t (ft) 3oo.961at u.95(hrs) name: 3ohr Drawdown Orifice name: Barrel Contours (so storage (cy) 287-796 area (sf) o oo5o multiple I INSTALLED, ON ALLJ RISER V. _ .00 W� diameter or depth(m) L000 discharge ORIFICES PER VSMH, FIYL'--BIBBB" AII�RIFICES ®® 2- 292 3 0 width for rect. (in) o.000 D ) 018.000ut of ser TECHNICAL BULLETIN l7] EI,RE,- .68' $ ON - 1i--FLO#r 294 294 100 coefficient 0_600 h(m) o.000 �E ®® ELEV =292.0' 2", 295 ag3 inved(ft) 292..wo Length (ft) 88.000 _, multiple I Slope 0,011 ORIFICE COEFF.= a6 60 296 discharge outofriser Manning'sn 0.013 CL 111 R lv/ 82 Inlet coeff. Ke 0.500 `� r'x' �. 2 057 5, , Outlet structure1 Equation constant set 3 _- 88. DP 11.1%' Orifice Invert(ft) 289.000 PERFORATED PIPE. SEE <- -- I ? - • - 302 3,016 C name: MdIOnfices DETAIL ON SHEET 17. Existing Facl�lt)1 Volumes arepth o.1g6 Ouneructure4 diameter or depth (in)) 6.00o Curve 87.6 LF 18" Ele�liont Total Area of width for rest (n) 0.000 name: Anti Vortex HOPE ®2.2% Basin Contours Volume (ef) coefficient m600 multiple I RISER F0017NG " (it) RISFA"ERGENCY w-u-j, NOT TO AL 100 YEAR W S E.=300.96' 10 YEAR. W S.E.=300.69' 2 YEAR W S. E. =300 42' MIN. FOREBAY COMBINER Vr?r _ "e40f. MIN. WATER QUALITY VOLUME T` 8E RAWtJW,B (2xWQV)-- 4,49fef. WATER QUALITY VOI.UIVE HANS 1,312ef PROVIDF" CONCREIE i 10,913ef AN71-VORTEX (---1' WIDE FORE u, TRASHRACK DAM ELEV.= BOTTOM OF - 0' FOREB ELEV. znq294.8' - FOREBAY & 5' WIDE FOREBAY SPILLWAY-./ SHALL BE CONSTRUCTED OF GABION (Sri 26 We n1a 292 n/a Na 294 n/a 296 298 873 Y a--uu 300 1,471 3,564 invert (ft) 298.68o Invert(ft) 300.000 multiple 5 discharge into riser discharge intoriser fle:twentyfourtxt Outlet structure z Weir name: Proposed Spillway length (ft) 20000 sideangle 45Am coefficient 3.300 invert(ft) a 300. P 5 30 2,163 7,176 multiple 2 : Proposed facility volumes are 10'-11' dscharge throughdam than existing facility volumes. Thus Nil -f&!. jam FLAT BEACH AT THE EDGE OF IS PROPOSED WITHIN THE FLOODPb,%. THE EMBANKMENT ON 619T SIBS OF THE FACILITY w/ 3.•f SLOPES ON THE INTERIOR EXISTING TOP OF DAM BASIN TOP f lF DAM TOP OF- FOREBAY DAM OF THE FACILITY &Z/ SLOPES ABOVE , ELEV.= 302.00 Wp71-/= 10' AT AN io0 YEAR ►MOTH= 1.0 AT AN THE BEACH TYIAV INTyI BXISTIAC cRaUArO. 28' �8' IMDE�BIde- WEIR ELEVATION= 302.00 W.S.E=300.96' ELEVAnON= 30&60 2-YEAR STORM EVENT r. OUTFALL CHANNEL. 10 YEAR 299.7 DOES NOT CREST THE t1/ 1 '' y `•� MAX. EMBANKMENT W S. E.=300.69' EMERGENCY SPILLWAY �HT=6' (302-296) 2 YEAR 100 YEAR W S E 300 42' 96' ,,:'`• 10 YEAR ,\ e� -----------------�----- ---- � u -.`� 6 MIN. 8' WIDE ® TOP & BASKETS WITH VDOT #3 COARSE BOTTOM OF DETENUONJ' CL Ill RCP_- -- BASIN's BARREL SHALL (I _5L , WEIR COEFF = 3.3 i9- OF PONDING DEPTH ORIFICE COEFF = a AGGREGATE ON THE UPHILL 51DE OFTHE BASIN= mRM619 MOLT -STAGE RISER. 4 DEEP IMPERVIOUS CORE do CUTOFF- OUTFALL INTO PROPOSED /EIR&CLASS I RIPRAP ON THE DOWNHILL 292.8' SEE THIS SHEET FOR 0 CL 111 TREIWH WITH 1:1 SIDE LEVEL SPREADER SIDE OFTHE WEIR. GEOTEXfILE FILTER DE' R SLOPES. SEE DETAIL ON IMMEDIATELY UPSTREAM FOREBAY SPILLWAY FABRIC UNDERLAYMENT SHALL BE 88 L 1.1% NEXT SHEET FOR OF FLOOD PLAIN AREA. ELEVATION= 29&00 INSTALLED. WEIR SHALL HAVE I:ISIDE .OPE5w)ACREST ELEV. 5'(W)xg'(L) 87.8 LF 18" INV. = DO' ADOM00AL INFORMATION. SEE ESC PLANS AND SHEET 15 FOR 298.8' HDPE 0 2.2% gill IN .OUT- ADOMONAL INFORMATION. EXTENDED DEZLj i i l k_j.1 %i BASIN #1 FOIREBAYSPILLWAYT NTS -- - N'IISTS Inflow Hydrographs 3Inflow Hydrographs Hydrograph o SCS name: 2-Year, SCS 24-hour Storm Area (acres) 5.440 CN 77.800 Type a rainfall, P (m) 3.700 time of conc. (hrs) o.i600 time increment (hrs) 0.0210 time limit (hrs) 30.000 fudge factor 1.00 routed true peakflow(cfs) 10.229 peak time (hrs) 31.938 volume (cy) 11g5.94o Hydrograph i SCS name: Io-Year, SCS 24-hour Storm Area (acres) 5.440 CN 77.800 Type 2 rainfall, P (in) 5.600 time of conc. (hrs) o.2600 time increment (hrs) o.o210 timelimit(hrs) 3o.000 fudge factor 1.00 routed true peak flow (cfs) 20.053 peak time (hrs) 21.938 volume (cy) 2344.531 Hydrograph 2 SCS name: Ioo-Year, SCS 24-hour Storm Area (acres) 5.44o CN 77.800 Type 2, rainfall, P (in) g.1oo time of conc. (hrs) o.1600 time increment (hrs) o.o210 time limit (hrs) 30.000 fudge factor 1.00 routed true peakflow(cS) 39.940 peak time (hrs) Ii.938 volume (cy) 4669.797 EXISTING TOP OF DAM WIDTH= 10' AT AN ELEVATTON= 302.00' 1.04' OF FREEBOARD o DURING THE to 100-YR STORM EVEN `WEIR COEFF.= 3.3 SPILLWAY ELEVATION= _J CONC. LINED EEO SPILLWAY EMERGENCYSPZLLWAY NOTE: A FIELD REVISION DATED MAR. 1, 2022 BY ROUDABUSH, GALE & ASSOCIATES INDICATING THAT THE EMERGENCY SPILLWAY WAR Tn AF. PTPPAP TVgWAn nV rnNrPF.TG. WAS APPPnVT2n VTA PUATT. AV nAVTn SAATF.S CIP AT.ArtrAPIR rnTTNTV nN MAP 9 9n99 SWM FACILITY 1 RGA AS -BUILT DRAWING BASED ON MARCH, 2022 SURVEY AS -BUILT VOLUMES BASED ON MARCH, 2022 RGA SURVEY Elevation Area of Basin Volume Ift) Cell Contours (sf) (Cf) 293 51 0 294 141 96 295 245 289 296 378 601 298 734 1713 300 1966 4413 302 3277 9656 Elevation Area of Forebay Volume Ift) Cell Contours (sf) (Cf) 294 0 0 295 18 9 296 58 47 298 27E 381 300 E55 1312 II VOLUME = 1,123ef 1,312cf > 1,123ef Elevation Total Area of Volume Ift) Basin Contours (sf) (Cf) 292 0 0 294 141 96 295 263 298 296 436 648 298 1010 2094 300 1966 5070 302 3277 10313 REWD VOLUME = 4,49lef 10.313cf > 4.491cf P U o w ^ �o U O Z O 'D ZON :::I Lo a J � O U ¢P 0()a�w J J = m 0(n �o W "Q a U z Ir O- �� o ^ x In w0 o O P aw e, o v N N w Q > z O J LL Urn J = o J } V > =zw O a OU i./ furl w O � �Q P = r U 0 a a 0 w a 0 z I '" PI,TH Op Dr�� , Jimmy L. Taggart Li,. No. �� 22841 P°FF 5/12/22 SS 10N AL a z M W > z Q N `` '' F- O } H Y w Q w J J /V w Q Q LL m O V) w m V) Q ¢ N w N o CID> J w J J V.)1''� Q V r O U DATE: 5/12/2022 SCALE: AS SHOWN JOB: GLENMORE K2B FILE: 387 SHEET: 3 OF 3