HomeMy WebLinkAboutSDP198700083 Application 1987-12-21 plA
ALBEMARLE COUNTY Office Use' Only
DEC 2119$m P -E7-cF13
Application for File Number
SITE DEVELOPMENT PLAN Date Submitted
PLANNING DIVISION
12/Preliminary or Final Site Plan to Commission (Fee of $200 plus 14 copies required)
10 Administratively Approved Final Site Plan (Fee of $100)
• Major Amendment To File Name (Fee of $50 plus 12 copies required)
O Minor Amendment to File Name (Fee of $25 plus 5 copies required)
❑ Ordinance Waivers (Fee of $100 plus sketch/plat)
• Relief of Conditions of File Number (Fee of $50)
• Landscape Plan Waiver (Fee of $50)
TITLE OF PROJECT: Bascom Carwash
Location: The Intersection of Riverbend Drive and Route 250E, Charlottesville
Tax Map(s)-Parcel(s) 78-17F-2
Existing Zoning Highway rn mirc-i a 1 Magisterial District P.ivanna
If Residential: Number of units N/A Type of Units
Acreage of site Resulting density
If Commercial CZ, Industrial 0 , or Quasi-Public ❑ (Please check one)
Square footage of building (s) 4763 Acreage of site 1.00 —
Intended use: Carwash and Appointing Facility
Owner (As listed currently in Real Estate Department)
Name Clean Machine, Inc. Phone 804-971-9653
/ 0 , Address P.n. Box 1586, C'harinttPsvi 11 P, VA 77(102
Developer (If different from owner) Same
Address Phone
Surveyor/Architect/Land Planner Gloeckner & Osborne, Inc.
otbiC�� •:Snu.tt), Address 710 East High St., Charlottesville, VAPhone 804-971-1591
22901
Contact Person Brian P . Smith, P .E .
Address 710 E . High St. , Charlottesville Phone 804-971-1591
VA 22901
• This site plan as submitted contains all of the information required by 32.5.6
(Preliminary Plan) or by 32.6.6 (Final Plan). I understand that plans which lack
information required by said section shall be deemed incomplete and shall be
shall be rejected by the agent within ten (10) days of submittal.
• [FOR FINAL PLANS ONLY] To the best of my knowledge, I have complied with section
32.4.3.1 and obtained to tative approvals for all applicable conditions from the
appropriate ag 'es.
• Signed _ Date -! / 5 &?
(Owner, Cont act ur baser, Agent)
Fee Date Paid Received By
Notes:
OFFICE USE ONLY PLANNER:
Site Review Date: Recommendation:
Planning Commission Date: Action:
Board of Supervisors Date: Action:
IIII �
t-41110-2-
COUNTY OF ALBEMARLE
Dept. of Planning & Community Development
401 McIntire Road
Charlottesville, Virginia 22901-4596
(804) 296-5823
August 19, 1987
Charlottesville Savings & Loan
Route 29 North
Seminole Trail
Charlottesville, VA 22901
RE: Bascom Car Wash Preliminary Site Plan Route 250E, Tax Map
78 , Parcel 17F( 2)
Dear Sir or Madame:
The Albemarle County Planning Commission, at its meeting on
August 18, 1987 , unanimously approved the above noted site
plan subject to the following:
1 . Building permit will not be issued until the following
conditions are met:
a. County Engineer approval of the grading and drainage
plans and calculations;
b. County Engineer approval of stormwater detention
plan and calculations;
c. Virginia Department of Transportation approval of
right-of-way improvements and issuance of commercial
entrance permits;
d. Issuance of an erosion control permit;
e. County Engineer approval of retaining wall design;
f. Albemarle County Service Authority approval of final
water plans and sewer lateral sketch;
g. Planning staff approval of landscape plan.
In order to expedite the completion of the above items, please
have the appropriate agency or department notify Kathy
Brittain ( 296-5875) in the Zoning Department, in writing, that
the applicable conditions have been met.
In order to be eligible for administrative approval by the
agent, a final site development plan shall be submitted within
six ( 6 ) months of the date of Commission approval of the
preliminary plan. In any case, the final site development
plan shall be submitted within one ( 1) year of the Commission
approval of the preliminary plan or the preliminary plan
approval shall expire.
During the above time period, the applicant shall work to
satisfy the conditions of preliminary plan approval and to
obtain tentative approvals for the final site development
plan from the agencies represented on the site plan review
committee.
If you have any further questions, please do not hesitate to
contact me.
Sincerely,
David B. Benish
Planner
DBB/per
cc: Clean Machine, Inc.
Gloeckner, Lincoln & Osborne, Inc.
Mike Armm
Kathy Brittain
Jesse Hurt
Lou Rossie
Jeff Echols
Richard Gould
F. R. Bowie