HomeMy WebLinkAboutWPO202200001 Correspondence 2022-06-03Campbell Bolton From: Campbell Bolton Sent: Friday, June 3, 2022 2:25 PM To: David James Cc: Frank Pohl; Taygra Longstaff Subject: RE: WPO202200001 - Convenience Center David, I have made the revisions noted below to the SWPPP and the plans and am about to upload the documents to the website. Thanks E. Campbell Bolton, P.E. Project Manager Draper Aden Associates Engineering • Surveying • Environmental Services Lasting Positive Impact® Phone:434.295.0700 • Direct Line:434.284.4782 • Mobile 434.906.3892 daa.com From: David James <djames2@albemarle.org> Sent: Monday, May 23, 2022 5:15 PM To: Campbell Bolton <cbolton@daa.com> Cc: Frank Pohl <fpohl@albemarle.org>; Taygra Longstaff <tlongstaff@albemarle.org> Subject: RE: WP0202200001- Convenience Center I Attention: Email sent from outside DAA. Campbell, No other site plan comments. Please include a detail of the concrete washout with the PPP. VADEQ asks for a detail of these containment devices. Show a fueling area. On the WPO plan show a stockpile and staging location and SF around the stockpile. I think that's it Thanks, David James CEI I County of Albemarle 434-296-5832: 3273 From: Campbell Bolton <cbolton@daa.com> Sent: Monday, May 16, 2022 2:22 PM To: David James <diames2@albemarle.org> Cc: Frank Pohl <foohl@albemarle.ore>; Taygra Longstaff <tlongstaff@albemarle.ore> Subject: RE: WP0202200001- Convenience Center CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. David/Frank, Thanks for these comments. Below are my preliminary responses. 1. Please remove the MOT plan from this plan set. — Sheet has been removed. 2. Add a PPP to the SWPPP. Was one ever submitted for review? If not, next time I suggest including it with the first submittal so we can review it prior to the final round of review considering we may have comments related to it. — See attached. Please let me know if you have any comments prior to inclusion in the SWPPP. 3. Add the other required drawings to the SWPPP. —Will be added before I re -upload. 4. I'll check on the status of the forest and open space easement and the SWM agreement. The SWM agreement must be recorded prior to approval of the application. The FOS easement must be recorded prior to permit issuance. — Based on a follow up email from Frank, no SWM agreement or easements are required. 5. One last thing,... you state on the plans that there's a surplus of nutrient credits. Can you provide that amount on the plans? The VRRM summary sheet can be added to the plan to show this surplus amount. — VRRM summary sheet has been added to C0.2. Please confirm there are no other engineering comments on the Site or WPO plans. If not, and the attached PPP is acceptable, I will go ahead and upload a final round of documents. Thanks E. Campbell Bolton, P.E. Project Manager Draper Aden Associates Engineenng • Smve"ng • Ermironmental Services Lasting Positive Impact® Phone:434.295.0700 • Direct Line: 434.284.4782 • Mobile 434.906.3892 daa.com From: David James <diames2@albemarle.org> Sent: Thursday, April 28, 2022 4:17 PM To: Campbell Bolton <cbolton@daa.com> Cc: Frank Pohl <fpohl@albemarle.org> Subject: RE: WP0202200001- Convenience Center Attention: Email sent from outside DAA. Campbell, One last thing,... you state on the plans that there's a surplus of nutrient credits. Can you provide that amount on the plans? The VRRM summary sheet can be added to the plan to show this surplus amount. Thanks, David James From: Frank Pohl <fpohl@albemarle.ore> Sent: Thursday, April 21, 2022 7:16 AM To:'Campbell Bolton' <cbolton@daa.com> Cc: David James <diames2@albemarle.org>; Emily Cox <ecox2@albemarle.org Subject: WP0202200001- Convenience Center Mr. Bolton, I am helping David out by wrapping up the review of this project and have a few additional comments: - Please remove the MOT plan from this plan set. - Add a PPP to the SWPPP. Was one ever submitted for review? If not, next time I suggest including it with the first submittal so we can review it prior to the final round of review considering we may have comments related to it. - Add the other required drawings to the SWPPP. - I'll check on the status of the forest and open space easement and the SWM agreement. The SWM agreement must be recorded prior to approval of the application. The FOS easement must be recorded prior to permit issuance. You can email the updated documents. Sincerely, Frank Frank V. Pohl, PE, CFM County Engineer Albemarle County fpohl@albemarle.org 434-296-5832 x7914 401 McIntire Road, North Wing, Charlottesville, VA 22902