HomeMy WebLinkAboutARB202200056 Plan - Submittal (First) 2022-06-06RIO HILL
FACADE II RENOVATION - ARB PRELIMINARY DESIGN REVIEW
SUBMISSION 1"
"(Phase 2 of ARB Document entitled "20002_Rio Hill ARB _4th submission" dtd. 21.06.28)
June 06, 2022
Perspective looking from E.C.
Perspectives looking SW
EXISTING SITE CONDITIONS
R R W A R C H I T E C T S
i ix loom n dvbnnNlb92290
u4
r-orcM1in
7a
lWR
hi..
bmmm
We are pleased to submit to the Architectural Review Board the Preliminary
Facade Redevelopment Design for the continuation of the Rio Hill Renovation -
'Rio II' being the existing Jo-ann block at Rio Hill Center. This scope of work is
a continuation of the current facade remodel now in construction. And this 'Rio
II' is a complete facade remodel of the areas shown in this design package;
which constitutes a small section around the currentJo-Ann store and pre-ex-
isitng Crutchfield store. The exact scope of work is shown in the following
drawings. (Also note: The exisitng SE corner of the strip mall will remain as -is
for now as plans develop.)
While the existing buildings will remain, new construction involves removing
portions of the existing canopy and store entries and transforming these build-
ing fronts using a variety of new materials, forms and storefront windows. The
new siding materials will borrow completely from the Facade I remodel - ma-
terials already submitted to the ARB. Again, As strictly a 'facade remodel', the
plan is to minimize site work.
Please see original Rio Hill Package for a more detailed description and intent
of the overall Facade Renovation but generally Given Rio's oversized scale
and length (1600' In. ft.), the design team has proposesd demolishing portions
of the existing canopy. Also, removing the external 'wing walls' seen between
the canopies, helps to restructure the current relentless march of the disorga-
nized facade design. This removal of the major existing architectural elements,
in turn, begins this process of site reorganization by'breaking down the scale'
of the facade. Removing these most visible features clears the way for a more
interesting, varied front and for the potential of replacing the block walls with
new materials.
We see this idea of 'breaking down the scale' as working hand in hand with
creating a more human scale. Currently, the site's pedestrian experience is
dominated by the parking lot and the uninspiring covered canopy that stretch-
es nearly the entire front. Through the reorganizing of a series of new and
various building fronts, this design concept looks to the idea of the pedestrian
experience that is enhanced through a variety of experiences and walkway
that changes and evolves at different locations.
In changing the dynamic of Rio Hill, concepts like 'breaking down the oversize
scale' of this large strip mall and 'introducing ways of better relating to the
human scale' are vital to the overall project success in the way they relate to
our changing world and the future viability of the retail business center. As we
work through this process, our hope is to balance this initial project with a more
general road map for how to make Rio a more pedestrian friendly, attractive
space that has stronger connections to its surroundings.
We respectfully ask for the ARB guidance in finding the best possible solution -
for the Center's redevelopment in its relation to the Entrance Corridor.
SCOPE OF WORK
PREVIOUS SCOPE OF
WORK (DTD.
■FUTURE SCOPE OF
WORK - N.I.S.
PROJECT NARRATIVE
RIO HILL II FACADE RENOVATION
1 st Submittal -June 6, 2022
FIiR 511. D01K
T ._ .r I
LL
R R W A R C H I T E C T S
i ix bunM1 n.ee.e
dvbnnNlbn u497RlWR
.hi. na
r-
borcM1inmmm
a RATO'r-
r 77p
1+ JI _
,• }}tea.._• .• _ v .r~
.. s Yam•
OVERALL PROPOSAL
RIO HILL II FACADE RENOVATION
1 st Submittal -June 6, 2022
SO Sl S1.11 S1.2 S2 S3 S3.11 S3.2 S3. S4 S4.11 S5 S5.11 S6 S7 S8 S9 �S1oj S10.1 (Sl1)
EXISTING CONDITIONS
NEW PROPOSAL
1 01
NEW PROPOSAL MATERIALS
9 R W A R C H I T E C T S
iix loom 2290
dvbnnNlbn 497RlWR
uahi. ne
br-orcM1inmmm
I
[EXISTING M
NEW STAIN
TJX SECTIO
_I
I I
FIFC T(1 AAATr"
NEW STAIN FINISH APPLY ON EIFS TO MATCH ARCHITECTURAL PANEL - VALENTIAL EIFS TO MATCH NEW STAIN FINISH APPLY ON
(EX) MASONRY WALL - COLOR SURROUNDING TEAK (AP-6) BY STONEWOOD MINK GREY (EX) MASONRY WALL - COLOR
TO MATCH TJX SECTION STAINED MASONRY EIFS-BAJA DUNES -I#997 BY BEN TO MATCH TJX SECTION
(MINK GREY) (MINK GREY) MOORE (SAME AS (P-6) IN RIO PROJECT) (MINK GREY)
r
I
I
NEW STEEL PERGOLA -
BE CH�OLOR TO EXISTING WINDOW AND — MTL. EDGE OF OVERHAND - NEW STAIN FINISH TO NEW COVERED PERGOLA -
`COAL GREY DOOR TO REMAIN CHARCOAL GREY MATCH MTL. EDGE CHARCOAL GREY
PLA
VISIBILITY OF ALL MECHANICAL EQUIPMENTS FROM
ENTRANCE CORRIDOR SHALL BE ELIMINATED.
PREVIOUS SCOPE OF WORK
- � rf -�.I• '...I ii tl I ,I'I � I I III
Scale: 3/6 l" = 1'-0.
SOUTH ELEVATION -'PHASE 2'
RIO HILL II FACADE RENOVATION
1 st Submittal -June 6, 2022
r � � � � � � � � � � � � � � � � �-� �. � � � � � � � � � 7
NEW STAIN FINISH APPLY ON EIFS TO MATCH ARCHITECTURAL PANEL - VALENTIAL EIFS TO MATCH NEW STAIN FINISH APPLY ON '
(EX) MASONRY WALL -COLOR SURROUNDING TEAK (AP-6) BY STONEWOOD MINK GREY (EX) MASONRY WALL - COLOR
' TO MATCH TJX SECTION STAINED MASONRY EIFS-BAJA DUNES -I#997 BY BEN TO MATCH TJX SECTION '
' I (MINK GREY)(MINK GREY MOORE (SAME AS (P-6) IN RIO PROJECT) (MINK GREY) '
_ 1 MR Wf16t1�' - QRLS� ECR, Iag,IS E SUBWAY HBR BLOCK
TIAMMiL
I � I I
NEW STEEL PERGOLA' COLOR TO EXISTING WINDOW AND MT .EDGE OF OVERHAND - NEW STAIN FINISH TO NEW COVERED PERGOLA -'
BE CHARCOAL GREY DOOR TO REMAIN CH RCOAL GREY MATCH MTL. EDGE CHARCOAL GREY ■
III♦ t t t � � � � t t t♦ t♦ t♦ t♦ t♦ t♦ t♦ t♦ � � � � � t m t■
6 R W A R C H I T E C T S
i i2 ku. e.ee.e
aFvbnn kwgino 290
u49n.71M
br hi.mm
PLATOS
VISIBILITY OF ALL MECHANICAL EQUIPMENTS FROM
ENTRANCE CORRIDOR SHALL BE ELIMINATED. SCOPE
OF WORK HIGHLIGHTED IN DASHED RED LINES.
View from Route 29
(see existing condition photo adajacent)
Scale : 3/64" = V-0"
SOUTH ELEVATION - PHASE 2
RIO HILL II FACADE RENOVATION
1 st Submittal -June 6, 2022
EXISTING PERSPECTIVES
R R W A R C H I T E C T 5
�Farlmrtr.ille;,i7 22902
]a.971 71M
b— or�M1irtnx�om
LA ! O'
CLOSET
NEW - SOUTH ELEVATION PERSPECTIVE
I
x �
`
NEW - SOUTH ELEVATION PERSPECTIVE
RIO HILL II FACADE RENOVATION
1 st Submittal -June 6, 2022
FINISHES - VISUAL KEY NOTE: VISUAL KEY FROM RIO HILL 1
4 MAIN ADDITIVES FINISHES
TYPE
AP- ARCHOECTURAL PANEL
MANUFACTURER: STONEWOOD OR EQ.
NONE
0
PRODUCT: STANDARD
PANEL TYPE/SYSTEM: 1 Y PLANK/ 8"
PLANK ON CLIP SYSTEM FINISH
'AP -1 'AP .2
'AP -3 'AP .4 'AP -5
'AP -6
Pewler Mesh 5th Ave Elm
Grey Mesh Copper Brown Bronze
Valential Teak
Impression
TYPE '11
BN BRICK
MANUFACTURER: "GE G
I
N IN RIO
::
PRODUCT: THIN BRICK
'BR' -1
'BR' -2 'BR -3
F PEARL WHR
MINK GREY SMOOTH #737 PLOWED EARTH
—
WATERSTRUCK
----
TYPE '
E - EIFS/ STUCCO
MANUFACTURER: STOCORP OR EQ.
'F-1
'E'-2
STOLIME ONETEXTURE
STANDARDTEXTURE
TYPE C
MP - METAL PANEL
■ ■
MANUFACTURER: MOON OR EQ.
wn.w�n
'MP-1 COLOR: 'MP-2 COLOR:
PROFILE: MATRIX 1.0 BLUE
GREY PROFILE: MATRIX 1.0 DOVE GREY
+ MATRIX 3.0
7YPE'CP
CP -CERAMIC CLAD PANEL
TYPE'P
P- EXTERIOR PAINT
MANUFACTURER: CERACIAD OR EQ.
■
MANUFACTURER:
NONE
PRODUCT: ZEN GARDEN
BENIAMIN MOORE
OR EQ.
'CP-1
'P-1 'P-2
'P-3
'P-4
MEDIUM GREY
ONYX G
2133-10 16 3
NGLEWOOD
IFFS 1607
SILHOUETTE
AF-655
TYPE'�
a
PT - PORCELAIN TILE
MANUFACTURER: MOHAWK
■
■
N.A.
p7-1
SANDUEWOOD
'P-5 'P-6
TICONDERO A BAIA DUNES
'P-7
ND'S
'P-8
OXFORD
TAUPE 99 997
TH 981
WHITE 869
_11
TYPE
M - WIRE MESH
MANUFACTURER: MONCHOLS OR EQ.
PRODUCT: DESIGNER MESH
\
'M'-1
TECHNA 3150, TYPE 30
P OU USED & APPROVED FOR TJX
BRICK STAIN -1-R H
CANOPY CANOPY E-
EIFS/STUCCO E- EIFS/STUCCO
FRENCH GREY WN TIMBER
COLOR COLOR 'CHINAWHOE' 'ACADIAWHITE'
'MINK'ISM ERIORSTAIN
'PISTOL 'AGED
6004 BY S.W. #SC-109
BLACK' BRONZE'
WRANGLER BROWN'
R R W A R C H I T E C T S
wgmin.ee.e
dvbnnNlbn 4971.71M
u hi.. a
br-orcM1inmmm
—THI
MATERIAL PALETTE
RIO HILL FACADE RENOVATION
4th Submittal -June 28, 2021
2nd Rev. of Submittal dtd. December 21, 2020
SD Sl S1.1 1 S1.21 S2
Lftam. Ma- eW—= F
AO
NEW STEEL PERGOLA
BE CHARCOAL GREY
�S3 1
Y
(EX) MASONRY WALL -COLOR SURROUNDING
TO MATCH TJX SECTION STAINED MASONRY
(MINK GREY) (MINK GREY)
TO EXISTING WINDOW AND
DOOR TO REMAIN
S3 2
Y
TEAK (AP-6) BY STONEWOOD
EIFS-BAJA DUNES -I#997 BY BEN
MOORE (SAME AS (P-6) IN RIO PF
M OAO V U V
MTL. EDGE OF OVERHAND
CHARCOAL GREY
F7-o
4' LINEAR
RECESSED
(3' TYP)
S3-3(:S4)
Y
Y Y
MINK GREY
ROo SS
DRESS FOR LESS
NEW STAIN FINISH
MATCH MTL. EDGE
LJ
Y1
(EX) MASONRY WALL - COLOR
TO MATCH TJX SECTION
(MINK GREY)
NEW COVERED PERGOLA -
CHARCOAL GREY
RCP FIXTURE LEGEND
• RECESSED INCANDESCENT LIGHT(F-1)
LED LIGHT STRIP (F-2)
g WALL LIGHT (F-3)
BOLLARDS (F-4)
IN -GROUND UP LIGHT (F-5)
LINEAR LIGHT- CEILING MOUNTED(F-6)
LINEAR LIGHT - RECESSED (F-7)
------ ABOVE CANOPY UPLIGHT (F-8)
LIGHTING PLAN
RIO HILL II FACADE RENOVATION
1 st Submittal -June 6, 2022