Loading...
HomeMy WebLinkAboutSP199300007 Action Letter . . . _ .J> ~ , COUNTY OF ALBEMARLE Dept. of Planning & Community Development 401 Mcintire Road Charlottesville, Virginia 22902-4596 (804) 296-5823 ~L RECeIVED MAY 18 J99l ALSEMAAlE COUNTY ZONING DEPARTMENT May 17, 1993 1781 Productions ATTN: Charles or Linda McRaven P. O. Box G Free Union, VA 22940 RE: SP-93-07 1781 Productions Tax Map 94, Parcels 21 and 25 (Rt. 616) Dear Mr. & Mrs. McRaven: The Albemarle County Board of Supervisors, at its meeting on May 12, 1993, approved the above-noted request. Please note that this approval is subject to the following conditions: 1. Development shall be in general accord with the sketch and tax map parcel dated May 7, 1993 and initialled VWC. The area of development shall be 100 acres I and consistent with the natural boundaries and boundary distances described on the sketch. Only those wooded areas necessary to accommodate development shall be cleared. All other wooded areas shall be maintained in their natural state; 2. site plan shall not be processed until Health Department approval for potable water service and sewage disposal system has been obtained. Approval shall be of the water system design and the septic system design, including suitable soil evaluation and percolation test; 3. Lights used to illuminate parking areas shall be arranged or shielded to reflect light away from adjoining Rural Areas and away from adjacent streets. Lighting spillover onto public roads and properties zoned rural areas shall not exceed one-half (~) foot candle. Prior to final plan approval a lighting plan shall be reviewed and approved by the Architectural Review Board (ARB) which shall include methods for directing light downward; .r ) /~ /~rles /age 2 May 17, . or Linda McRaven . 1993 4. Public performances shall not begin after 9:00 p.m. Public performances shall not extend after 10:30 p.m. except due to circumstances beyond the applicant's control such as, but not limited to, rain, lightning or power failure. Under no circumstances shall performances extend beyond midnight. Public performances shall occur only from May 1 to September 30, with only weekend performances allowed prior to Memorial Day and after Labor Day. Weekend performances shall only occur on two (2) of the three (3) weekend nights. From Memorial Day to Labor Day, performances shall occur not more than six (6) nights per week; 5. This permit is for an outdoor, local historical drama theater and those accessory uses customarily incidental to, subordinate to and directly supportive of an outdoor, local historical drama theater. Approval of this request shall not be deemed to include uses such as craft shows, dog shows, music festivals, rock concerts and film exhibitions unrelated to the outdoor, local historical drama theater; 6. Methods for controlling on-site circulation shall include manpower assistance or such other methods as may be approved by the Planning Department; 7. provisions of section 4.14.1 are applicable. Verification to include submission of a certified engineer's report for the acoustics of the sound system and amplification in accord with section 4.14.8 which shall be required at the time of site plan submittal; 8. Staff approval of site plan; 9. Access shall be only from Route 250 and shall include left and right turn lanes on Route 250 to serve the site; 10. The applicant shall post with the Zoning Administrator a bond for its pro rata share of the cost of construction of a left turn lane and taper (200 feet + 200 feet) within the existing right-of-way of U.S. Route 250 onto State Route 616 (northbound). Such pro rata share shall be the fraction of the estimated cost of construction of such lane of which the numerator is equal to one-half the projected traffic to be generated by the proposed use (expressed in vehicle trips per day) and the denominator is the total traffic using the relevant section of u.S. Route 250 (expressed in vehicle trips per day) according to the most recent VDOT traffic count. The bond shall be conditioned that the principal thereof shall be available to be used to pay the applicant's pro rata share of the cost of construction of the said turn .. . . /ilarles or Linda McRaven Page 3 May 17, 1993 lane if, at any time within three (3) years from the issuance of a certificate of occupancy for the proposed use, the County and/or VDOT shall have appropriated money sufficient to pay the balance of the construction cost therefor. In the event that the County and/or VDOT shall not have appropriated the balance of such construction cost within three (3) years from the date of issuance of the certificate of occupancy, the bond shall be released to the applicant. The amount, terms, security and form of the bond shall be subject to the reasonable approval of the zoning Administrator. Before beginning this use, you must obtain a zoning clearance from the Zoning Department. Before the Zoning Department will issue a clearance, you must comply with the conditions in this letter. For further information, please call Babette Thorpe at 296-5975. If you should have any questions or comments regarding the above- noted action, please do not hesitate to contact me. Sincerely, ~ 0, ' v. ~mberg Director of Planni Community Development VWC/jcw cc: Amelia McCulley Jo Higgins