Loading...
HomeMy WebLinkAboutSP199700057 Action Letter . . -.....' ... . . ::f- '~\\, 9. COUNTY OF ALBEMARLE Dept. of Planning & Community Development 401 Mcintire Road Charlottesville, Virginia 22902-4596 (804) 296-5823 June 23, 1998 James Hill Virginia Land Company 195 Riverbend Drive Charlottesville, VA 22911 RE: SP-97-57 Townwood Mobile Home Park Tax Map 61, Parcel 8 Dear Mr. Hill: The Albemarle County Board of Supervisors, at its meeting June 10, 1998, approved the above- noted request to add fifteen (15) additional units to an existing mobile home park. Please note that this approval is subject to the following conditions: 1. 2. 3. Not more than 13 additional units shall be permitted. All new units shall be setback at least 15 feet from the designated internal road. The minimum street width shall be 20 feet with a prime and double seal surface except in the area noted on the plan by staff as "Portion of Road with Island, WDF 4/9/98". The existing travelway in the "Portion of Road with Island" shall be paved. Defined roadside ditches and drainage culverts shall be provided where deemed necessary by the Director of Engineering. The provisions of Section 5.3 shall apply to all new units except as noted in this special use permit or as may be modified by the Planning Commission during the review of the site plan. A tot lot meeting the requirements of Section 4.16.2.1 of the Zoning Ordinance shall be provided. The tot lot shall be located such that it is not within 50 feet of any existing unit. The applicant shall obtain Engineering Department approval of modifications to the drainage system at the rear of the property which conveys water from Greenbrier Drive. Fire hydrants shall be located to serve the entire Townwood Mobile Home Park and the location of the hydrants must be approved by the Fire Official. One recreational vehicle parking space shall be provided. 4. 5. 6. 7. 8. . . . 10. No clearing or grading shall occur other than that which is necessary to improve the existing internal road, meet building code requirements for the placement of units and to provide for utilities. 11. A minimum 6-foot high screening fence shall be provided on Greenbrier Drive and adjacent to the gas pipeline from the end of the existing fence to the edge oflot 3 where it abuts the open space. A vegetative buffer, presumably white pine, in an amount at least equivalent to what would have been spent on the proposed 6-foot high screening fence, shall be provided adjacent to the Four Seasons Development on lots 8, 9, 10, 11 and 12, with the intent being to provide a large screening buffer behind the new mobile homes. Required fencing shall be maintained and replaced if it should be damaged. 12. Building Official verification of adequate water pressure to all units, both new and existing, prior to approval of site plan; and 13. No site plan shall be approved until all violations cited in Zoning Administrator's Notice of Determination of Violation, dated May 6, 1998 have been abated. ";).\\-, In the event that the use, structure or activity for which this special use permit is issued shall not be commenced within eighteen (18) months after the issuance of such permit, the same shall be deemed abandoned and the authority granted thereunder shall thereupon terminate. For purposes of this section, the term "commenced" shall be construed to include the commencement of construction of any structure necessary to the use of such permit within two (2) years from the date of the issuance thereof which is thereafter completed within one (1) year. Before beginning this use, you must obtain a zoning clearance from the Zoning Department. Before the Zoning Department will issue a clearance, you must comply with the conditions in this letter. For further information, please call Jan Sprinkle at 296-5875. If you should have any questions or comments regarding the above-noted action, please do not hesitate to contact me. Sincerely, ~?iSl~ Ronald S. Keeler Chief of Planning RSK/jcf cc: Amelia McCulley Jack Kelsey