Loading...
HomeMy WebLinkAboutSDP201600007 Checklist - Project Closeout (Administrative) 2021-04-09 - � SUBDIVISION/SITE PLAN 1- ,,,ALi Rkotm, � i %LE CLOSEOUT /IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC a i , •tus label. CDA will forward to the Imaging•Center for digital closeout. SDP/' : # �t�� 7 PRO TITLE 4 /- kirc — •4 51Vc. . FULL NAME OF LEAD REVIEWS „,43 -7 FINAL ACTION DATE: (,/_,G, Conn View— ❑Appl • tion,Page 2 Data Entered • ❑ Staff eport,Ground Water Assessment,,or other documents placed in"Does&Pics" Hardcopy. File Folder•Closeout:• All items listed should be placed in project folder,in reverse • .chronological or er(latest on top). - • Please check each itom included in this.folder. To indicate that an item is not applicable to this file, next to the check box. a Lead Reviewer has the discretion to include anyitem deemed necessary toprovide /A" clarity to the file,please' dicate that itemion the"Other"lines provided. Digital Closeout Ins uctions: Below each item please indicate if Imaging Center is to scan the•document;or,.if the document' already in digital format,can be saved to LaserFiche. Please provide the digital location(path/name)of the doc ent in the space provided. . ❑ Engineering Folder Informed° documentation 0 Scan 0 aved;location . ❑ Application(signature copy) . ❑ Scan 0 Sav d.location • . • • ❑ Public Notification records/Abutting�wner correspondence. ❑ Scan 0 Saved lbcation . ❑ Applicant Correspondence'(to/from,mein s/emaffs) . • • • •❑ Scan 0 Saved loca ' n • _ .❑ Complete.set of printed Review Comments Scan 0 Saved location. • Approved plan/plat(signed,or stamped"Approv d"with Planner/Engineer name). . .. • 0 Scan 0 Saved location • 0 Action Letter(Administrative Approval) . • la Scan 0 Saved location . •. • . 0 White Envelope-PC/BOS Meeting Package:Staff Repo, (include plan/plat presented,PC/BOS Action Letter) ❑ • Scan ❑.Saved.location • • 0 Ground Water Assessments` • . 0 Scan 0 Saved location • 0 Other(Please explain—i.e.Studies). . . 0 Scan 0 Saved location Other(Please explain—i.e.Studies) • . . • ❑ Scan 0 Saved location • • • . • •❑ At the planner's discretion,copies of unapproved plans/plats*nay b placed in the file if it is.referenced in the staff report or minutes and lends clarity to the review at a later date. \such plans are included,they should be clearly marked as unapproved and contain a note clarifying why it vies included.. • ❑a Scan 0 Saved location ` • • Additional Information on:this project: • • • . • Planning Commission Minutes—maybe obtained online or by contacting PC R- ording Secretary •: Board of Supervisor Minutes—maybe obtained online or by contacting the Cl- •f BOS • • Construction Documents—will.be added to this folder after completion of project. •rior to completion, . . documents may be obtained by contacting the County Engineer.. _ NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the following it- 1 s are complete: 1) Checklist is completed and included in folder; 7 • 2) Folder has a typed status label(same font&label color as project label)placed under 'e project label to •;reflect current project status and date; . • • • 3) Documents are.Acco-fastened.(except.plats/plans),and in lchronological.order(latest.documents on top);.• 4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche, , If the above items are not complete,Imaging.center staff will circle the•incomplete item and return folder to the Chief of Planning for corrective action. .• • . Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012 . ' • • .