Loading...
HomeMy WebLinkAboutSDP202100087 Correspondence 2022-06-15FREELAND and KAUFFMAN, INC. ENGINEERS / LANDSCAPE ARCHITECTS June 13, 2022 To: Mariah Gleason (Community Development — Planning) From: Ankita Kot Subject: SDP202100087 Caliber Collision— Major Site Plan Amendment Below please find responses for the comments received for 3rd Submittal for the above referenced project. 3. [32.5.2(a)] Zoning Information a) The special use permit information has been updated on sheet 4. 6. [32.5.2(b)] Parking schedule b) Bumper block has been added at handicap parking space. Refer to Sheet #4. Detail of bumper block has been added on site details sheet. Refer to sheet #6. 8. [32.5.2(s)] Circulation The swinging gate design has been revised on both the site plan and auto -turn exhibit. 10. [32.5.2(n)] Dumpster a) The swinging gate and associated fence has been revised in a way that allows large vehicles to turn and screens the proposed dumpster bins. Refer to sheet #4. 21. The revised plans include the original date of drawing and the revision dates) for each subsequent version of the plan. 24. Managed steep slope areas have been shown on site plan. Refer to sheet #4. 25. Sheet #8 (Site Details) has been added and total number of sheets are 13. 26.AII sheets have been updated to show uniform date (i.e. 6/13/2022). Please contact me with any questions at 864-672-3425 or akot@fk-inc.com. 209 West Stone Avenue ! Greenville, South Carolina 29609 1 Telephone 864-233-5497 FREELAND and KAUFFMAN, INC. ENGINEERS / LANDSCAPE ARCHITECTS June 13, 2022 To: Howard Lagomarsino (Department of Fire Rescue) From: Ankita Kot Subject: SDP202100087 Caliber Collision— Major Site Plan Amendment Below please find responses for the comments received for 3rd Submittal for the above referenced project. 1. Title has been revised to "Fire Prevention Demolition and Construction Notes". Refer to sheet #3. 2. Test hydrant is located +/-190' south (from the existing southern building corner) at the entrance drive to CVS. A note has been provided on sheet #4. 3. Required ISO fire flow is 2000 gal/min. This note has been provided on sheet #4. 4. Available fire flow is 2610 gal/min (as per the latest ACSW flow test). This note has been provided on sheet #4. Please contact me with any questions at 864-672-3425 or akot@fk-inc.com. 209 West Stone Avenue ! Greenville, South Carolina 29609 1 Telephone 864-233-5497 FREELAND and KAUFFMAN, INC. ENGINEERS / LANDSCAPE ARCHITECTS June 13, 2022 To: Richard Nelson (Service Authority) From: Ankita Kot Subject: SDP202100087 Caliber Collision— Major Site Plan Amendment Below please find responses for the comments received for 3rd Submittal for the above referenced project. 1. Existing water meter has been shown on Irrigation plan. The service line from water main to the meter has been shown. Refer to sheet #9. 2. The irrigation meter connection on the service line between the meter and water main has been shown. Refer to sheet #9. Please contact me with any questions at 864-672-3425 or akot cDfk-inc.com. 209 West Stone Avenue ! Greenville, South Carolina 29609 1 Telephone 864-233-5497 FREELAND and KAUFFMAN, INC. ENGINEERS / LANDSCAPE ARCHITECTS June 13, 2022 To: Khristopher Taggart (ARB) From: Ankita Kot Subject: SDP202100087Caliber Collision — Major Site Plan Amendment Below please find response for the comment received for 3rd Submittal for the above referenced project. 1. Sheet SP1.1 Site Details has been added which provides details for the proposed fencing. Refer to sheet #8. Please contact me with any questions at 864-672-3425 or akot@fk-inc.com. 209 West Stone Avenue ! Greenville, South Carolina 29609 1 Telephone 864-233-5497