HomeMy WebLinkAboutSDP201800081 Application 2018-10-26 _,�;, Albemarle Cour'-� Community Development Department
tU 401 lire Road Charlottesville,VA22902-4596
rm 1 e:(434)296-5832 Fax:(434)972-4126
`,0:.. ,)Y Planning Application
PARCEL j OWNER INFORMATION
TN1P 07600-00-00-05400 .Omer(;); GAMBIT LLC & SNOW PAWS LLC ET ALS
Application## SDP201 SO00$1, .
,PROPERTY INFORMATION
Legal Description FREAGE A
Magisterial Dist. Scottsville Land Use Primary Forest n
Current AFD Not in A/F District I Current Zoning Primary;RIO Residential J,__.!
[APPLICATION INFORMATION
Street Address I Entered By
_-____ i _Judy Martin.
Application Type Site Development Plans
_ _---- 1Of26f2018
Project Royal Fern Townhomes - Final
Received Date 10/26/18 Received Date Final Submittal Date 11/05/18 1 Total Fees 1613
Closing File Date 1 Submittal Date Final Total Paid 1613
Revision Number
Comments
Legal Ad r"--------
WITHDRAWN
Per Zoning Ordinance
SUB APPLICATION(s)
Type 1 Sub Applicatio Comment
Final Plat : 11/05/18
APPLICANT / CONTACT INFORMATION
ContactType Name Address CityState Zip Phone PhoneCeli
awrterlapp4ics t GAMBIT LLC& SNOW PAWS LLC ET ALS PO BOX 6846 CH ARLOTTE SVILL 22906-
Pnmay Contact SHIMP ENGINEERING,PC 912 E.HIGH STREET SCH.ARLOTTE54IL 22902 4342275140
Signature of Contractor or Authorized Agent Date
•
Application for
Initial Site Plan or Final Site Plan or Site Plan Exception !
Project Name: 1Zay AI fe-AN TD,4)h ho1N‘g5
Tax map and parcel(s): 'fl"i? 76 'ya?cA Zoning: 1Z10
Contact (who should we contact about this project) S ,416, 'r t/x 1^t vt�
Street Address &IZ S.:- �k J 5*I , U
City CLol 1d4a5Vt l\ _ ' State V A- Zip Code 22 cZ
Phone Number 4,34-2Z7 — ' Email Jkc'fin $h.`o,,p-- ri-�gi;�-ta° /t,lat
Owner of Record A nn b,"-1- LLG G 11 5r to I? LLC UU�f- 4(//s
�"
Street Address Pc; ?v) 6$ cj
City C_Lc--1i4kV-5V(' State V A Zip Code 2-290 g."C 8 S C
Phone Number Email
Applicant 5 I u►v‘p C,
Street Address 5o1.,v_.G
City State Zip Code
Phone Number Email
Type of Development
a Residential U Non-residential
Type of unit(s): Towrt k/PWC-5 ❑ Commercial
U Industrial#of building(s): G
❑ Quasi-Public
Sq.ft.of building(s): �'5i 2 7`f S F
Sq.ft.of building(s):
#of units per building: \14•Watipte
Acreage of site:
Total#of units: �J Acreage in open space:
Resulting density: 61,1 vntl-5 ear acre Acreage in roads:
Acreage of site: '3.L( Ore_ Average gallons of water used per day:
Acreage in open space: 75 A-G
Acreage in roads: • 6 et W{
Average gallons of water used per day:
FOR OFFICE USE ONLY SDP#
Fee Amount$ Date Paid By who? Receipt#_ Ck# By:
County of Albemarle
Department of Community Development
401 McIntire Road Charlottesville,VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
REVISED 4/23/2018 Page 1 of 2
Intended use or justification for request:
Comments/Attachments: /� /
KW— R+ W� Ca�MWe-Vci feS,G1nI Si- �6 r�S o,+e C�o a/!� '
?1..r�r �,,,,/ ewse►Ve�t1 elch 't'�l(JRit.B, GppEr7, eerytq� /fc3tl
fir Te s c. -e <J
FEES
SITE DEVELOPMENT PLAN SITE PLAN EXCEPTION
Initial Site Plan Final Site Plan Exception to drawing of site
plan under section 32.3.5(a)
Approved No
Preapplication plan Preapplication plan
❑ $752 plus$16/dwelling ❑ $1,290 plus$16/dwelling 6 $1,613 ❑ $1,613
unit and/or$0.016 per unit and/or$0.016 per +Fire Rescue Fee of$100 +Fire Rescue Fee of
square foot of square foot of $100
nonresidential structure nonresidential structure
$ +Fire $ +Fire
Rescue Fee of$100 Rescue Fee of$100
16 folded copies of the plan #of copies required for submittal will be noted with 8 folded copies of the plan
plus an additional 6 copies if within an Entrance Corridor your initial approval letter. Copies of the plan should
be folded and in blue or black ink.Also provide I
reduced copy of the plan no larger than 11 by 17 in.
❑ The initial site plan has a parking structure. U The final site plan has a parking
❑ Included are architectural elevations,drawings, structure.
photographs or other visual materials showing any ❑ Included are revised architectural elevations,
parking structure proposed on the site and surrounding drawings,photographs or other visual
structures and land uses. materials submitted with the initial site plan.
The elevations shall be part of the approved
final site plan.
GROUNDWATER ASSESSMENT
(Required for all non-residential site plans not serviced by public water)
❑ If the plans show a use using less than 2,000 gallons/day(average) Tier 3 Groundwater Review=$548
❑ If the plans show a use using greater than 2,000 gallons/day(average) Tier 4 Groundwater Review=$1,183
❑ Special Exception=$457
This application may require additional review by the Fire Marshal. Fees in addition to those shown on this application may be required by
the Fire Prevention Code Fee Schedule. A copy of the schedule is available from the Fire Marshal.
Notices required by Section 32.4.2.1 (I)
Preparing and mailing or delivering up to fifty(50)notices=$215.00 plus the actual cost of first class postage.
Preparing and mailing or delivering,per notice more than fifty(50)=$1.08 plus the actual cost of first class postage.
Owner/Applicant Must Read and Sign
This site plan as submitted contains all of the information required by Section 32.5(Initial Site Plan)or Section 32.6(Final Site Plan)of
Chapter 18 of the Code of the County of Albemarle. I understand that plans which lack information required by said sections shall be
deemed incomplete and shall be denied by the agent within ten(10)days of submittal as provided in Section 32.4.2.1 or Section 32.4.3.1
of Chapter 18 of the Code as the case may be.By signing this application I am consenting to written comments,letters and or notifications
regarding this application being provided to me or my designated contact via fax and or email. This consent does not preclude such
written communication from also being sent via first class mail.
For Final Plans Onl :To the best of m knowled e I have com lied with Section 32.4.3.1 a of Cha ter 18 of the Code.
gnature of Owner,Contract Purchaser,Agent Date
e7e -r- Srel Y. y-u7 5/yo
Print Name Daytime phone number of Signatory
Site Plan Application REVISED 4/23/2018 Page 2 of 2
Patricia "Paty" Saternye
From: Patricia Saternye
Sent: Friday, November 1, 2019 10:40 AM
To: Justin Shimp
Subject: RE: SDP2018-81 Royal Fern Townhomes - Final Site Plan comments
Justin,
Thank you for letting me know.
I will officially withdraw SDP2018-81 Royal Fern Townhomes.
Thanks,
Paty Saternye
Senior Planner
Community Development
01
1".
41L��
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
434-296-5832 ext.3250
psaternye@albemarle.org
www.albemarle.org
From: Justin Shimp <justin@shimp-engineering.com>
Sent: Friday, November 1, 2019 10:37 AM
To: Patricia Saternye <psaternye@albemarle.org>
Subject: Re: SDP2018-81 Royal Fern Townhomes - Final Site Plan comments
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Paty
Thanks for the follow up, Peter no longer works here. I think we are fine with the plan being withdrawn as inactive.
-Justin
On Nov 1, 2019, at 10:01 AM, Patricia Saternye <psaternye@albemarle.org> wrote:
Peter,
I just wanted to touch base in reference to Royal Fern Townhomes SDP2018-81.