HomeMy WebLinkAboutWPO201800044 Bond Estimates 2022-06-02Project Name: VSMP Plan Amendment ABC Block 1 Mass Grading Major Amendment for Multifamily, Amendment #2 to WP02018-00044 WPO file number: WP02018-00044 Amendment #2 TM P(s): 07600-00-00-046AA Date Estimate Completed: 05-19-2022, K.Rucker; cbk. by J. Anderson, 6/2/22 Erosion & Sediment Control Plan Bond Estimate. NOTE: THIS ESTIMATE WILL REPLACE THE ACTIVE BOND AMOUNTS. THE QUANTITIES HEREIN INCLUDE THE EXISTING BONDED QUALITIES AND THE NEW ADDED QUANTITIES. Item Item No. Unit Unit Cost Cost Number installed 1 stablization (PS, TS) acres $5,000.00 $27,000.00 2 silt fence (SF) 209ft $5.00 $10,200.00 3 safety fence (SAF) 1620.0 ft $5.00 $8,100.00 4 diversion (DID, FD, RWD) -ft $13.00 $22,425.00 5 temporary slope drain (TSD) pipe length -ft pipe diameter 0 in $0.00 $0.00 6 Sediment Trap #1 7 earthwork for trap/basin 8 height of dam at toe It cut at high side 8 ft 9 height of fill at faceoft ft cut at face 4 ft 10 length of damft length of cut 50 ft 11 top width width of cut 20 ft 12 (area above transition) 14 sf (area below transitio 112 sf 13 (total width of dam) 6 ft (total width of cut) 44 ft 14 (height below transitior 1 ft (depth below transiti, 4 ft 15 (area below transition) 2 sf (area above transitio 72 sf 16 (total fill volume) 35.6 cy (total cut volume) 340.7 cy 17 length of spillway -ft (TOAL CY estimate) 353 cy $13.00 $4,589.00 18 width of spillway ft (spillway stone tons) 8.3 tons $50.00 $415.00 19 Sediment Trap #2 20 earthwork for trap/basin 21 height of dam at toe It cut at high sideoft ft 22 height of fill at faceOft ft cut at faceft 23 length of damft length of cutft 24 top width width of cut 25 (area above transition) 0 sf (area below transitior 192 sf 26 (total width of dam) 2 ft (total width of cut) 52 ft 27 (height below transitior 1 ft (depth below transiti, 4 ft 28 (area below transition) 0 sf (area above transitio 88 sf 29 (total fill volume) 0.0 cy (total cut volume) 518.5 cy 30 length of spillway _ft (TOAL CY estimate) 519 cy $13.00 $6,747.00 31 width of spillway ft (spillway stone tons) 11 tons $50.00 $550.00 32 Sediment Trap #1 (PHASE 2) 33 earthwork for trap/basin 34 height of dam at toe -It cut at high side -ft 35 height of fill at face ft cut at face ft 6/2/22 Project Name: VSMP Plan Amendment ABC Block 1 Mass Grading Major Amendment for Multifamily, Amendment #2 to WP02018-00044 WPO file number: WP02018-00044 Amendment #2 TM P(s): 07600-00-00-046AA Date Estimate Completed: 05-19-2022, K.Rucker; chk. by J. Anderson, 6/2/22 Erosion & Sediment Control Plan Bond Estimate. NOTE: THIS ESTIMATE WILL REPLACE THE ACTIVE BOND AMOUNTS. THE QUANTITIES HEREIN INCLUDE THE EXISTING BONDED QUALITIES AND THE NEW ADDED QUANTITIES. Item Item No. Unit Unit Cost Cost Number installed 36 length of dam LAft length cut WMft 37 top width ft widthoff cut ft 38 � transition) 14 sf (area below transitioi 112 sf 39 (total wiath of dam) 6 ft (total width of cut) 44 ft 40 (height below transitior 1 ft (depth below transitii 4 ft 41 (area below transition) 2 sf (area above transitio 72 sf 42 (total fill volume) 23.7 cy (total cut volume) 340.7 cy 43 length of spillway ft (TOAL CY estimate) 349 cy $13.00 $4,537.00 44 width of spillway ft (spillway stone tons) 8.3 tons $50.00 $415.00 45 Sediment Trap #2 (PHASE 2) 46 earthwork for trap/basin 47 height of dam at toe 1 ft cut at high side ft 48 height of fill at face 0 ft ft cut at faceoft 49 length of dam 30 ft length of cutft 50 top width 3 ft width of cut 51 (area above transition) 0 sf (area below transitio 192 sf 52 (total width of dam) 2 ft (total width of cut) 52 ft 53 (height below transitior 1 ft (depth below transitii 4 ft 54 (area below transition) 0 sf (area above transitio 88 sf 55 (t-"' `I, ..^' —) 0.0 cy (total cut volume) 414.8 cy 56 length of spillway �ft (TOAL CY estimate) 415 cy $13.00 $5,395.00 57 width of spillway ft (spillway stone tons) 11 tons $50.00 $550.00 58 59 .00 $0.00 60 silt fence inlet protection (IP) $10000.00 $100.00 61 stone inlet protection (IP) 13 $200.00 $2,600.00 62 outlet protection (OP) length 0 ft width 0 ft 0 $0.00 $0.00 63 channel (SCC, matted) length 0 ft width 0 ft 0 $0.00 64 check dam depth in channel 0 ft channel width 0 ft 0 $0.00 $0.00 65 construction entrance (CE) 0 $2,500.00 $0.00 66 wash rack 1 $2,000.00 $2,000.00 67 paved construction entrance 1 $3,500.00 $3,500.00 68 rip -rap, placed depth 0 ft length I&0.0 ft 69 width 0.0 a $60.00 $0.00 70 6/2/22 Project Name: VSMP Plan Amendment ABC Block 1 Mass Grading Major Amendment for Multifamily, Amendment #2 to WP02018-00044 WPO file number: WP02018-00044 Amendment #2 TM P(s): 07600-00-00-046AA Date Estimate Completed: 05-19-2022, K.Rucker; chk. byJ. Anderson, 6/2/22 Erosion & Sediment Control Plan Bond Estimate. NOTE: THIS ESTIMATE WILL REPLACE THE ACTIVE BOND AMOUNTS. THE QUANTITIES HEREIN INCLUDE THE EXISTING BONDED QUALITIES AND THE NEW ADDED QUANTITIES. Item Item No. Unit Unit Cost Cost Number installed 71 survey and layout (price per 0.1 mi.) acres 5.4 traps and basins 4 $4,700.00 72 mobilization $2,500.00 cost sum $106,323.00 WP0201800044 Royal Fern Phi, Amendment for Mass Grading_ESCP_bond_SE03-08-2021 contingency $10,632.30 Total $116,960 6i2i22