HomeMy WebLinkAboutWPO201800044 Bond Estimates 2022-06-02 (2)Project Name: VSMP Plan Amendment ABC Block 1 Mass Grading Major Amendment for Multifamily, Amendment #2 to WP02018-00044 WPO file number: WP02018-00044 Amendment #2 TM P(s ): 07600-00-00-046AA Date Estimate Completed: 05-23-2022 /revised, K.Rucker (Shimp Engr.); chk. by J. Anderson, 6/2/22 Stormwater Management Plan Bond Estimate Item Item Number 1 permanent diversion or ditch 2 standard manhole frame top (not inlet) 3 drop inlet or grate 4 manhole structure (per ft. rise) 5 pipe, rcp, cmp (15 to 48") 6 7 8 9 aggregate base or drainage stone 10 1 1 earthwork for ADS Stormtech system 1 12 13 14 15 16 17 18 19 20 21 22 23 earthwork for ADS Slonntech system 2 24 25 26 27 28 29 30 31 15.0 in 0 ES-1,2 18.0 in 0 ES-1,2 24.0 in 0 ES-1,2 42.0 in 1 ES-1,2 48.0 in d Ml�ftL height of dam at toe ft height of fill at face 0 ft length of dam ft top width ft _ove transition) 0 sf (total width of dam) 0 ft (height below transition 0 ft (area below transition) 0 sf (total fill volume) 0.0 cy length of spillway =ft width of spillway ft height of dam at toe ft height of fill at face ft length of dam tap width �ft ft __ --ove transition) 0 st (total width of dam) 0 ft (height below transition 0 ft (area below transition) 0 sf 50.0 ft W cut at high side ft cut at face ft length of cutIft ft width of cut transition) 120 at (total width of cut) 44 ft (depth below transition 5 ft (area above transition) 85 at (total cut volume) 1047.8 cy (TOAL CY estimate) 1048 cy (spillway stone tans) 0 tons cut at high side ft cut at face ft length of cutoft ft width of cut . , transition) 490 at (total width of cut) 77 ft (depth below transition 4 ft (area above transition) 138 at No. Unit Oft 8 ea 13 ea 154.0 ft 0 EC-1 139.0 ft 0 EC-1 197.0 ft 0 EC-1 188.0 ft 0 EC-1 68.0 ft 2016.0 ton Unit Cost (installed) $13.00 $500.00 $3,500.00 $450.00 $35.00 $40.00 $50.00 $75.00 $35.00 $13.00 $50.00 Cost $0.00 $4,000.00 $45,500.00 $69,300.00 $4,865.00 $7,880.00 $9,400.00 $5,600.00 $70,560.00 $13,624.00 $0.00 6/2/22 Project Name: VSMP Plan Amendment ABC Block 1 Mass Grading Major Amendment for Multifamily, Amendment #2 to WP02018-00044 WPO file number: WP02018-00044 Amendment #2 TM P(s ): 07600-00-00-046AA Date Estimate Completed: 05-23-2022 /revised, K.Rucker (Shimp Engr.); chk. by J. Anderson, 6/2/22 Stormwater Management Plan Bond Estimate Item Number 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 Item trees shrubs seedlings underdrain(LF) trash rack/ anti vortex devices maintenance access road (LF) rip -rap, placed survey and layout (price per 0.1 mi.) mobilization as -built drawings (per facility) materials testing (per facility) compaction testing (per dam) Survey and platting of Open Space r length of spillway ft width of spillway ft depth width acres Manufactured facilities 156 ADS Stormtech Chambers @ $900/chamber Includes remainder of stormtech raw materials (fabric, manifolds, etc) (total cut volume) 3837.8 cy (TOAL CY estimate) 3838 cy (spillway stone tons) 0 tons length _ft (tons) 0 basins_ No. Unit Unit Cost Cost (installed) $13.00 $49,894.00 $50.00 $0.00 F 0 ea $275.00 $0.00 0 ea $50.00 $0.00 0 ea $5.00 $0.00 300 ft $5.00 $1,500.00 4 ft $1,500.00 $6,000.00 0 ft $50.00 $0.00 $60.00 $0.00 $3,700.00 $2,500.00 2 ea $2,000.00 $4,000.00 2 ea $2,000.00 $4,000.00 0 ea $3,000.00 $0.00 0 ea $2,500.00 $0.00 $140,400.00 cost sum $442,723.00 contingency $44,272.30 Total $487,000 6/2/22