Loading...
HomeMy WebLinkAboutWPO202200005 Correspondence 2022-06-21 (2)Ma i I Chris Marshall <chris@shimp-engineering.com> Confirming Non -Reporting NW18 Castalia Farm Winery Pero, Vincent D CIV USARMY CENAO (USA) <Vincent.D.Pero@usace.army. miI> Thu, Jun 16, 2022 at 12:18 PM To: Chris Marshall <chris@shimp-engineering.com> Chris It appears you may qualify for a non -reporting NWP 18. It is up to you to make sure you meet all the terms and conditions of the NWP 18. Also, see attached and fill out and keep for your records. Thanks Vinny From: Chris Marshall <chris@shimp-engineering.com> Sent: Thursday, June 16, 2022 12:02 PM To: Pero, Vincent D CIV USARMY CENAO (USA) <Vincent. D. Pero@usace.army.mil> Subject: [Non-DoD Source] Confirming Non -Reporting NW18 Castalia Farm Winery Vinny, Upon further analysis of the stream crossings at Castalia Farm, we determined that there is less than 10 cy of fill above the high water mark at the two crossings. The high water mark was determined by analyzing the stream on multiple dates and taking multiple measurements to find an average depth. The top and bottom of the stream banks were recorded in our field survey so that we could accurately map the path and variable width of the streams within the disturbed area. I've attached an exhibit showing our calculations and the relevant plan sheets. We are proposing 110 LF of fill disturbance and 8.4 cy of fill above the ordinary high water mark in two streams. The fill does not result in the loss of more than 0.1 acres of waters in the US. This fill placement is not for the purpose of a stream diversion and site visits revealed no wetlands within the limits of disturbance. Can you provide confirmation that this project meets the conditions of the nonreporting Nationwide 18 Permit? Thanks, Chris CWA Section 401 General Certification Compliance worksheet.pdf 132K