HomeMy WebLinkAboutWPO201900009 Plan - Submittal (First) 2019-02-22IDA GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS: 1. The plan approving authority must be notified one week prior to the pre -construction conference, one week prior to the commencement of land disturbing activity, and one week prior to the final inspection. 2. All erosion and sediment control measures will be constructed and maintained according to minimum standards and specifications of the Virginia Erosion and Sediment Control Handbook and Virginia Regulations VR 625-02-00 Erosion and Sediment Control Regulations. 3. All erosion and sediment control measures are to be placed prior to or as the first step in clearing. 4. A copy of the approved erosion and sediment control plan shall be maintained on the site at all times. 5. Prior to commencing land disturbing activities in areas other than indicated on these plans (including, but not limited to, off -site borrow or waste areas), the contractor shall submit a supplementary erosion control plan to the owner for review and approval by the plan approving authority. 6. The contractor is responsible for installation of any additional erosion control measures necessary to prevent erosion and sedimentation as determined by the plan approving authority. 7. All disturbed areas are to drain to approved sediment control measures at all times during land disturbing activities and during site development until final stabilization is achieved. 8. During dewatering operations, water will be pumped into on approved filtering device. 9. The contractor shall inspect all erosion control measures periodically and after each runoff producing rainfall event. Any necessary repairs or cleanup to maintain the effectiveness of the erosion control devices shall be made immediately. 10. All fill material to be taken from an approved, designated borrow area. 11. All waste materials shall be taken to an approved waste area. Earth fill shall be inert materials only, free of roots, stumps, wood, rubbish, and other debris. 12. Borrow or waste areas are to be reclaimed within 7 days of completion per Zoning Ordinance section 5.1.28. 13. All inert materials shall be transported in compliance with section 13-301 of the Code of Albemarle. 14. Borrow, fill or waste activity involving industrial -type power equipment shall be limited to the hours of 7:00am to 9:00pm. 15. Borrow, fill or waste activity shall be conducted in a safe manner that maintains lateral support, or order to minimize any hazard to persons, physical damage to adjacent land and improvements, and damage to any public street because of slides, sinking, or collapse. 16. The developer shall reserve the right to install, maintain, remove or convert to permanent stormwater management facilities where applicable all erosion control measures required by this plan regardless of the sale of any lot, unit, building or other portion of the property. 17. Temporary stabilization shall be temporary seeding and mulching. Seeding is to be at 75 Ibs/acre, and in the months of September to February to consist a 50/50 mix of Annual Ryegrass and Cereal Winter Rye, or in March and April to consist of Annual Rye, or May through August to consist of German Millet. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approval by the County erosion control inspector. 18. Permanent stabilization shall be lime and fertilizer, permanent seeding, and mulch. Agricultural, grade limestone shall be applied at 90lbs/1000sf, incorporated into the top 4-6 inches of soil. Fertilizer shall be applied at 1000lbs/acre and consist of a 10-20-10 nutrient mix. Permanent seeding shall be applied at 180lbs/acre and consist of 115% Kentucky 31 or Tall Fescue and 0-5% Perennial Ryegrass or Kentucky Bluegrass. Straw mulch is to be applied at 80lbs/100sf. Alternatives are subject to approval by the County erosion control inspector. 19. Maintenance: All measures are to be inspected weekly and after each rainfall. Any damage or clogging to structural measures is to be repair immediately. Silt traps are to be cleaned when 50% of the wet storage volume is filled with sediment. All seeded areas are to be reseeded when necessary to achieve a good stand of gross. Silt fence and diversion dykes which are collecting sediment to half their height must be cleaned and repaired immediately. 20. All temporary erosion and sediment control measures are to be removed within 30 days of final site stabilization, when measures are no longer needed, subject to approval by the County erosion control inspector. 21. This plan shall be void if the owner does not obtain a permit within 1 year of the date of approval. (Water Protection Ordinance section 17-204G.) 22. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commences. (Water Protection Ordinance section 17-207B) CONTRACTOR'S COORDINATION RESPONSIBILITIES 1. The contractor is required to obtain any/all permits required for construction of these plans. ' 2. Any time work is performed off -site or within an existing easement, the. contractor is to notify the holder of said easement as to the nature of proposed work and to follow any guidelines or standards "which are associated with or referenced in the recorded easement. : 3. The contractor is to check that all easements, letters of permission, etc, are recorded/obtained prior to the start of any construction. 4. Contractor to verify all site plans and profiles and details for consistency and if conflicts exists, contact engineer for clarification and/or direction. Interpretation determined by contractor shall be done at his/her own risk. 5. The contractor is to verify that the relocation of all existing utilities in conflict with proposed work has been completed including utility poles. 6. Contractor shall comply with fencing and tree preservation signage required by Albemarle county code. 7. Contractor shall not rely solely on electronic versions of plans, specifications, and data files that are obtained from the designers, but shall verify location of project features in accordance with the paper copies of the plans and specifications that are supplied as part of the contract documents. 8. Contractor shall comply with all wetland permit requirements, if a permit exists. 9. Contractor shall be responsible for all relocations, (unless otherwise noted on plans) including, but not limited to, all utilities, storm drainage, signs, traffic signals & poles, etc. as requiredl. All work shall be in accordance with governing authorities requirements and project sitework specifications and shall be approved by such. All cost shall be included in base bid. 10. Contractor shall control stormwater runoff during construction to prevent adverse impacts to off site areas, and shall be responsible to repair resulting damages, if any, at no cost to owner. 11. This project disturbs more than one acre of land and falls within the Virginia Stormwater Management Program (VSMP), General Construction Permit (GCP) program as administered by the Virginia Department of Conservation and Recreation (DCR) under the jurisdiction of the EPA. Prior to the start ,of construction, the contractor shall file a GCP notice of intent with the DCR and prepare a stormwater prevention plan in accordance with the VSMP regulations. 12. Contractor shall coordinate with all utility companies for installation requirements anid specifications. 13. Contractor shall be responsible for site security and job safety. Construction activities ` shall be in accordance with OSHA standards and local requirements. 14. Contractor shall dispose of demolition debris in accordance with applicable federal, state and local regulations, ordinances and statutes. 15 Existing utilities shall be terminated, unless otherwise noted, in conformance with local, state'and individual utility company standards specifications, and details. The contractor shall coordinate utility service disconnects with the utility representatives. GENERAL CONSTRUCTION NOTES: 1. Prior to any construction within any existing public right-of-way, including connection to any existing road, a permit shall be obtained from the Virginia, Department of Transportation (VDOT). This plan as drawn may not accurately reflect the requirements of the permit. Where any discrepancies occur the requirements of the permit shall govern. 2. All materials and construction methods shall conform to current specifications and standards of VDOT unless otherwise noted. 3. Erosion and siltation control measures shall be provided in accordance with the approved erosion control plan and shall be installed prior to any clearing, grading or other construction. 4. All slopes and disturbed areas are to be fertilized, seeded and mulched. 5. The maximum allowable slope is 2:1 (horizontal: vertical). Where reasonably obtainable, lesser slopes of 3:1 or better are to be achieved. 6. Paved, rip -rap or stabilization mat lined ditch may be required when in the opinion of the County Engineer, or designee, it is deemed necessary in order to stabilize a drainage channel. 7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices. 8. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe -Class III. 9. All excavation for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR Part 1926). 1O.SL-1 safety slab locations are based on the assumed use of precast structures. if cast -in -place structures are utilized, and the interior chamber dimensions are less than 4 feet, the safety slabs shall not be required. e 1 OWNER UNIVERSITY OF VIRGINIA FOUNDATION P.O. BOX 400218 CHARLOTTESVILLE, VA 22904 LEGAL REFERENCE & SOURCE OF TITLE: DEED BOOK 4170, PAGE 689 SITE AREA: 72.90 AC MAGISTERIAL DISTRICT: SAMUEL MILLER SOURCE OF BOUNDARY SURVEY: ALBEMARLE COUNTY GIS SOURCE OF TOPOGRAPHY: ALBEMARLE COUNTY GIS CURRENT PROPOSEDSPOILS AREA VICINITY MAP SCAM: '1" - 1000' EROSION AND SEDIMENT CONTROL LEGEND 3.02 CONSTENTRANCE CE [3.0]3 �CONSTRUCTION CRS ROAD STABILIZATION �Rs HFiT FENCE [3, 0]5 WIRT BACKED SSF - - [3.32 ENCF P SEEDING T PS Ps MODIFIED NSA MUD TRAP MT *REFERENCE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH) FOR DETAILS REGARDING INDIVIDUAL CONTROL MEASURES. 50 0 50 100 150 SCALE: 1" = 50' l f 1 f l 1 1 1 it I I I I I I I I I IIL0 I I I I I I I I I I I,i 1 SF i 1 I 1 I 1 I '� l\ \• \ NOTE: \SPOILS PILES TO BE DUMPED ` NQ CLOSER THAN 25' TO\ AMC PERIMETER�.CONTROLS 5/70 \ \ \ \ \NOTE: \ VERL0, SIL FENCE 6' _ - - CONSTRUCTION SEQUENCE ; \ \ \ \ Q IDE WIRE B CkEDLLT x `SF' 1 \ \ \ \ FENCE CE TMP- 76-13B "'to, be \ \ \ \ \ \ \\ \\__used as Spoilsq Area \� \\ - INSTALL EROSION AND SEDIMENT \ SSF for "dredging \ CONTROL MEASURES \ } \ "".",,operations - at TMP , % . . _ . S P �- � � 'COMMENCE DUMPING OF SPOILS WITHIN \ \ \ \ \\ \ S6 ^59D2-01--2 (Boars `, \ -n -'---5- . PROTECTED FIELD TO WEST OF FOXHAVEN ` \ \ \ \ \ \ \ \ Head"14ke \ \ \ " 7a 1 / FARM ROAD \ \ \ \ \ , SPOILS TO BE LEFT TO DRY BEFORE \ G BEING SPREAD ABOUT PROTECTED AREA \ \ \ \\ \ X \ \ SPREAD SPOILS UPON REACHING DESIRED \ MOISTURE CONTENT PERMANENTLY SEED DISTURBED I P I TURBED AREA AS \ \ \ L NEEDED \ \ REMOVE PERIMETER CONTROLS AT THE DIRECTION OF. ALBEMARLE COUNTY INSPECTOR \ TOTAL DISTURBED AREA: 2.42 Acs. ' v ' / , \ \ \ MUD TRAP TO $E \ X \ \ \�35'05"AND 3\ EI (CAVATED DEPTH \ / \ MT CRS I I :SSF I , \\ XJ -CE/ /r /� ��r /r ,/\zzz a 0 � O 0D N 0 Q� zo U ® >-o +� W Z 4 �W JJ Z �Z w CC W VQ ON Q K- aL9 o �? CN' 0 Ca o CO W� O� 4.? C o� n , �� O0 W Q.W WLQ y �^ U0 vJw '� z 0O W 0rn cY) 0 rnIt W Z z W o W I III I � I I i I Z i i i f 0 i CN zw � 0. I , W � �- ............. i I I 1 i I ....... _..... � � ; � a .. ci .-.. ._ p_........... a ..._� ( .. .. .. ....... Z I + 3 OF v j� .0 DAVID M. ROBINSON Uc. No. 56760 w� `�SIONAL E�_ Cc O LL. Q Z z 0- w J _J Om< >z m Z < O u- () w O Z im I- W O U w E-4 LIJ CL U rr >< W ® o L 0 w J J Z O J W �� U) O II W DATE: 02-22-2019 SCALE: 1 "=50' JOB: FILE: 19.0377 SHEET: OF 02 CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) 2. EXCAVATE A 4" x 4" TRENCH 1. SET THE STAKES UPSLOPE ALONG THE LINE OF 1. SET POSTS AND EXCAVATE A 4"X4" 2. STAPLE WIRE FENCING TO THE POSTS. STAKES. .� 6„ � TRENCH UPSLOPE ALONG THE LINEMAXr-- -0F POSTS. i — 3. 4. BACKFILL AND COMPACT STAPLE FILTER MATERIAL _ I I FLOW I III �II' (IIII �II TO STAKES AND EXTEND THE EXCAVATED SOIL. 4�, IT INTO THE TRENCH. 3. ATTACH THE FILTER FABRIC TO THE WIRE 4. BACKFILL AND COMPACT THE FENCE AND EXTEND IT INTO THE TRENCH. EXCAVATED SOIL. t I; 1 /_ _ ice-'.. ��*•• '., FLOW SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) I EXTENSION OF FABRIC AND WIRE INTO THE TRENCH. A MAX � A 0 FILTER FABRIC \ / —I I POINT A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) 'WIRE BACKED SILT FENCE- DETAIL (SSF) 3.05 SILT FENCE DETAIL (SF) 3.05 Not To Scale. Not To Scale 70' MIN. EXISTING A � PAVEMENT 5:1 III—ll-1 11=1 11=1 I I-111�1 i 4_ FILTER CLOTH 6" MIN A MOUNTABLE BERM (OPTIONAL) 2' SIDE ELEVATION — — #3, #357, or CLASS u #5 STONE RIP RAP EXISTING GROUND FLOW 70' MIN. T o v o B WASHRACK 10' MIN. (OPTIONAL) - �- 0 0 0 r STONE WEIR DETAIL 3 10' MIN. 12' MIN. � _ EXISTING Il PAVEMENT - �=III=11F=11r— 6' WIRE SUPPORTED SILT FENCE VDOT �1 EXPOSITIVE DRAINAGE 10' MIN. COURSE. AGGREGATE B TO SEDIMENT I I TRAPPING DEVICE y _ * MUST EXTEND FULL WIDTH AND EGRESS � � ^ � VIEW OPERATIONPLAN(E \ ^ / 12' MIN. 3" MIN. SEE STONE Note: Modified Mud Trap To Be Placed At Low Point WEIR DETAIL 3" MIN. MODIFIED MUD TRAP FILTER CLOTH—� NOT TO SCALE ..SECTION A —A s'-7" REINFORCED CONCRETE DRAIN SPACE SECTION B—B �: w 0 O U !w� CV `� Q ZO U Z °-�� o j 0) > LL ® ^ Ld Q W �W Z azW- Jz °N p ol; U rn `` N 4 CO Lu O � 4. �u LL o Ln (/) W U04 �w Q z 04 2 a) W d. cr (vR W Z - O EL i I � ! ! i { j i I I ! I ' E � { O E V N I i W O I I I I E I 0 ! _.............i... ...... _....... ? ... .. ............ O I Z j ! 4 �I,TH pF vI� O /DAVID M. ROBINSON L c' . No. 56760 `S610 AL E� LL O Q L" Zz __F i (� W J OF m2 CO W 'r— m � Q J�5) 7-% 9m () z O LL LL o W � O Q 0- U <T_ ® � w (] o � Iz 06 W z V W tY w DATE: 02-22-2019 SCALE: N/A