Loading...
HomeMy WebLinkAboutSUB201900065 Checklist - Project Closeout Final Plat 2019-05-16 SUBDIVISION/SITE PLAN FILE CLOSEOUT /IMAGING CENTER INSTRUCTIONS CHECKLIST - Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC and status labeell.,/CDA will forward to the Imaging Center for digital closeout. SDP SUB # 20 Li 45 PROJECT TITLE AG 1/,L,µ A.C.k. `n tOribel y flariou FULL NAME OF LEAD REVIEWER' 4 C IA-Sa INAL ACTION DATE: 5/16k `•n^ j Co iew— j [implication,Page 2 Data Entered LStaff Report, Ground Water Assessment, r�rother docume s placed in"Docs &Pies" , I Hardcopy—File Folder Closeout: All items listed should be placed in project folder, in reverse 1 chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other" lines provided. `Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the 1 document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. ❑ Engineering Folder Information/documentation O Scan Saved location Application(signature copy) ❑ Scan ISCed location I&SU. `LL, ..Public Notification records/Abutting Owner correspondence ❑ Scan 0 Saved location Applicant to/ Correspondence fro memos em 'ls P ( / ) O Scan aved location Lt.SGK F!C14- -Complete set of printed Review Comments oh rf w� iIbvt - Wta►dwia* Ref' ❑ Scan 0 Saved location L Est •"[o„K blLv 5 'o„Ll1) 1 p.St K. e I L XApproved plan/plat(signed, or stamped"Approved"with Planner/Engineer name) O Scan ❑ Saved location g—Action Letter(Administrative Approval) ❑ Scan 0 Saved location 'White Envelope-PC/BOS Meeting Package- Staff Report(include plan/plat presented,PC/BOS Action Letter) ❑ Scan 0 Saved location i if r('round Water Assessments i 0 Scan ❑ Saved location Other(Please explain—i.e. Studies) 1S+ $vbwLt 140Lt LN/I- dyyswa —Wi' w.Wh-) 0 Scan 0 Saved location Other(Please explain—i.e. Studies) ❑ Scan 0 Saved location j-1 'At the planner's discretion,copies of unapproved plans/plats may be placed in the file if it is referenced in the i staff report or minutes and lends clarity to the review at a later date. If such plans are included,they should be clearly marked as unapproved and contain a note clarifying why it was included. L — ❑ Scan ❑ Saved location Additional Information on this project: — — ♦ Planning Commission Minutes—may be obtained online or by contacting PC Recording Secretary • Board of Supervisor Minutes—may be obtained online or by contacting the Clerk of BOS • Construction Documents—will be added to this folder after completion of project. Prior to completion, i — documents may be obtained by contacting the County'Engineer. NOTES: S% /SU project folders will be accepted by the Imaging Center when the following items are complete: 1) eckl' 's completed and included in folder; 1.45Fo as a typed status label(same font&label color as project label)placed under the project label to „ e ct current project status and date; ocuments are Acco-fastened(except plats/plans),and in chronological order(latest documents on top); Ni ) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete,Imaging Center staff will circle the incomplete item and return folder to the Chief of Planning for corrective action. Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012