HomeMy WebLinkAboutWPO202100064 VSMP - SWPPP 2022-06-29VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY PERMIT #:
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM PLAN/ID #:
CONSTRUCTION ACTIVITIES (VAR10) TECHNICAL CRITERIA: 1113 ❑ IIC ❑
REGISTRATION STATEMENT 2019
Application type. ❑ NEW PERMIT ISSUANCE
(CHOOSE ONE) ❑ MODIFICATION WITH ACREAGE INCREASE
❑ MODIFICATION WITHOUT ACREAGE INCREASE
❑ EXISTING PERMIT RE -ISSUANCE
Section I. Operator/Permittee Information.
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have
operational control over construction activities to ensure compliance with the general permit. A person with
signatory authority for this operator must sign the certification in Section V. (per Part III. K. of the VAR10 Permit).
Operator Name:
Contact person:
Address:
City, State and Zip Code:
Phone Number:
Primary and CC Email:
B. Electronic correspondence. To receive an emailed coverage letter or to pay by credit card, you must choose YES
and include a valid email. May we transmit correspondence electronically? YES ❑ NO ❑
Section II. Construction Activity Information.
A.
Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land
disturbance, construction entrances and all waterbodies receiving stormwater discharges from the site.
B.
Project site location information.
Construction Activity Name:
Address:
City and/or County and Zip Code:
Construction Activity Entrance Location
(description, street address and/or
latitude/longitude in decimal degrees):
Latitude and Longitude
(6-digit, decimal degrees format):
C.
Acreage totals for all land -disturbing activities to be included under this permit coverage. Report to the nearest
one -hundredth of an acre.
Total land area of development (include entire area to be
disturbed as approved in the Stormwater Management Plan):
Primary estimated area to be disturbed (include portions with
Erosion and Sediment Control Plan approval only):
Off -site estimated area to be disturbed (if applicable):
D.
Property Owner Status:
FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE ❑
E.
Nature of the Construction Activity Description (i.e. commercial,
industrial, residential, agricultural, environmental, utility):
F.
Municipal Separate Storm Sewer System (MS4) name(s) (if the
site is discharging to a MS4):
G.
Estimated Project Dates (MM/DD/YYYY).
Start Date:
Completion Date:
H.
Is this construction activity part of a larger common plan of
development or sale?
YES ❑ NO ❑
Rev 11/2020 PAGE 1 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
1. 6`h Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Include additional areas on a separate page.
HUC T NAME(S) OF RECEIVING WATERBODY
Section III. Off -site Support Activity Location Information.
List all off -site support activities and excavated material disposal areas being utilized for this project. Include additional
areas on a separate page.
Off -site Activity Name:
Address:
City or County:
Off -site Activity Entrance Location (description, street
address and/or latitude/longitude in decimal degrees):
Latitude and Longitude (6-digit, decimal degrees format):
Is this off -site activity an excavated material disposal
area?
YES ❑ NO ❑
If this off -site activity is an excavated material disposal
area, list the contents of the excavated fill material:
Will a separate VPDES permit cover this off -site activity?
YES ❑ NO ❑
Section IV. Other Information.
A.
A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the
General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the
Registration Statement. By signing the Registration Statement, the operator is certifying that the SWPPP has been
prepared.
B.
Has an Erosion and Sediment Control Plan been
submitted to the VESC Authority for review?
YES ❑ NO ❑
Erosion and Sediment Control Plan Approval Date (for
the estimated area to be disturbed MM/DD/YYYY):
C.
Has land -disturbance commenced?
YES ❑ NO ❑
D.
Annual Standards and Specifications. If this project is utilizing approved Annual Standards and Specifications
(AS&S), attached the completed AS&S Entity Form.
AS&S Entity Name (if different from the Operator
identified in Section I):
E.
Billing information (leave blank if same as the Operator identified in Section I. above). This entity will receive
Annual Permit Maintenance and Permit Modification Fee invoices (if applicable).
Billing Name:
Contact Name:
Address:
City, State and Zip Code:
Phone Number:
Primary and CC Email:
Rev 11/2020 PAGE 2 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section V. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements
of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that
operator is defined in 9VAC25-870-10 as follows:
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater
associated with a large or small construction activity, operator means any person associated with a construction project that meets
either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including
the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those
activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state
permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the
stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from
Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system.
9VAC25-880-70. Part III. K. Signatory Requirements. Registration Statement. All Registration Statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer
means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or
any other person who performs similar policy -making or decision -making functions for the corporation, or (ii) the manager
of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management
decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term
compliance with environmental laws and regulations,• the manager can ensure that the necessary systems are established or
actions taken to gather complete and accurate information for state permit application requirements; and where authority
to sign documents has been assigned or delegated to the manager in accordance with corporate procedures,
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively' or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official.
For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the
agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the
agency.
Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this
document and all attachments were prepared in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage
the system or those persons directly responsible for gathering the information, the information submitted is to the best
of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting
false information including the possibility of fine and imprisonment for knowing violations."
Printed Name:
Signature (signed in ink):
Date Signed:
Section VI. Submittal Instructions. Submit this form to the VSMP Authority. If the locality is the VSMP Authority, please
send your Registration Statement submittal directly to the locality; do NOT send this form to DEQ. A list of local VSMP
Authorities is available here: VSMP Authorities.
If DEQ is the VSMP Authority, please send to: If the locality is the VSMP Authority, please send to:
Department of Environmental Quality
Office of Stormwater Management Suite 1400
PO Box 1105
Richmond VA 23218
constructiongp@deg.virginia.gov
Rev 11/2020 PAGE 3 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
This Registration Statement is for coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities. This form
covers the following permit actions: new permit issuance, existing permit modification with an increase in acreage, existing permit modifications
that result in a plan modification but do not result in an increase in disturbed acreage, and reissuance of an active permit coverage.
Application type. Select NEW PERMIT ISSUANCE to obtain a new permit coverage. Modifications are for modifying an existing, active permit
coverage. Select MODIFICATION WITH ACREAGE INCREASE when the previously approved acreage(s) increases (permit modifications are not
performed for decreases in acreage unless they result in plan changes — see Modification WITHOUT Acreage Increase). Select MODIFICATION
WITHOUT ACREAGE INCREASE when there is a change to the site design resulting in a change to the approved plans with no increase in acreage(s)
Select EXISTING PERMIT REISSUANCE to extend an expiring permit coverage for the next permit cycle and include the existing permit number.
Section I. Operator/Permittee Information.
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over
construction activities to ensure compliance with the general permit. For companies, use the complete, active, legal entity name as registered with
a state corporation commission. Entities that are considered operators commonly consist of the property owner, developer of a project (the party
with control of project plans and specifications), or general contractor (the party with day-to-day operational control of the activities at the project
site that are necessary to ensure compliance with the general permit). If an individual person is listed as the operator, that person (or a legal
representative of) must sign the certification in Section V. An operator may be one of the following:
9VAC25-870-10. Definitions
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a
large or small construction activity, operator means any person associated with a construction project that meets either of the following two
criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those
plans and specifications or (if) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance
with a stormwater pollution prevention plan for the site or other state permit or V5MP authority permit conditions (i.e., they are authorized to direct
workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context
of stormwater discharges from Municipal Separate Storm Sewer Systems (MS4), operator means the operator of the regulated MS4 system.
"Owner" means the Commonwealth or any of its political subdivisions including, but not limited to, sanitation district commissions and authorities,
and any public or private institution, corporation, association, firm or company organized or existing under the laws of this or any other state or
country, or any officer or agency of the United States, or any person or group of persons acting individually or as a group that owns, operates,
charters, rents, or otherwise exercises control over or is responsible for any actual or potential discharge of sewage, industrial wastes, or other
wastes or pollutants to state waters, or any facility or operation that has the capability to alter the physical, chemical, or biological properties of
state waters in contravention of § 62.1-44.5 of the Code of Virginia, the Act and this chapter.
"Person" means any individual, corporation, partnership, association, state, municipality, commission, or political subdivision of a state,
governmental body, including a federal, state, or local entity as applicable, any interstate body or any other legal entity.
B. May we transmit correspondence electronically? If you choose YES to this question and provide an email address in Section I. A., all
correspondence, forms, invoices and notifications will be transmitted by email to the operator. This will also give the operator the ability to pay by
credit card and to receive Dermit coverage aooroval letters immediately uoon Dermit aooroval.
Section II. Construction Activity Information.
A. A site map indicating the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances
and all water bodies receiving stormwater discharges from the site must be included with the submittal of this form. Aerial imagery maps or
topographic maps showing the required items are acceptable. Plan sheet sized site maps are not required. Please consult your VSMP authority if
you have additional questions regarding site map requirements.
B. Construction Activity Name and location. Provide a descriptive project name (it is helpful to use the same naming convention as listed on the
Stormwater Management plans), 911 street address (if available), city/county of the construction activity, and the 6-digit latitude and longitude in
decimal degrees format for the centroid, main construction entrance or start and end points for linear projects (i.e. 37.1234N/-77.1234W).
C. Acreage totals for all land -disturbing activities, on- and off -site, to be included under this permit. Acreages are to be reported to the nearest
one -hundredth acre (two decimal places; i.e. 1.15 acres). Provide the total acreage of the primary development site as approved on the
Stormwater Management Plans and the primary on -site estimated acreage to be disturbed by the construction activity as approved under the
Erosion and Sediment Control Plans. The off -site estimated area to be disturbed is the sum of the disturbed acreages for all off -site support
activities to be covered under this general permit. Do not include the off -site acreage totals in the primary, on -site total and estimated disturbed
acreage totals. Permit fees are calculated based on your disturbed acreage total for all on- and off -site areas being disturbed under this permit
coverage (the sum of all on -site and off -site disturbed acreages).
D. Property owner status. The status of the construction activity property owner. Any property not owned by a government entity or agency (i.e.
federal, state or local governments) is PRIVATE.
Rev 11/2020 PAGE 4 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
E. Nature of the construction activity description. Choose the designation that best describes the post -construction use of this project (you may
choose more than one). (i.e. Residential, Commercial, Industrial, Agricultural, Environmental, Educational, Oil and Gas, Utility, Transportation,
Institutional, etc.). Describe the post -construction use of the project (i.e. Commercial — one new office building and associated parking and
utilities; Transportation — Linear roads, sidewalks and utilities; Agricultural-3 Poultry Houses, etc.).
F. Municipal Separate Storm Sewer System (MS4) name(s) if discharging to a MS4. If stormwater is discharged through a MS4 (either partially or
completely), provide the name of the MS4(s) that will be receiving water from this construction activity. The MS4 name is typically the town, city,
county, institute or federal facility where the construction activity is located.
G. Estimated project dates. Provide the estimated project start date and completion date in Month/Day/Year or MM/DD/YYYY format (i.e.
07/30/2019).
H. Is this construction activity is part of a larger common plan of development or sale? "Common plan of development or sale" means a contiguous
area where separate and distinct construction activities may be taking place at different times on different schedules per 9VAC25-870-50.
Definitions. Le. a subdivision, commercial development, business park, etc.
I. 6th Order Hydrologic Unit Code (HUC) and associated Receiving Water Name(s). Provide all 6th order HUCs and receiving waterbody names, for
the primary site and any Off -site areas included under this permit coverage, that could potentially receive stormwater runoff discharging from this
activity. The HUC can be either a 12-digit number (i.e. 0208010101) or 2-letter, 2-number code (i.e. JL52). Include additional HUCs or receiving
waters on a separate page. You may utilize DEQ!s web -based GIS application, VEGIS, to obtain this information.
• VEGIS application link: DEas VEGIS Mapping Application
• Instructions for utilizing DE(Xs VEGIS application link: CGP-GIS HUC Instructions
Section III. Off -site Support Activity Location Information.
This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards,
material storage areas, excavated material disposal areas, borrow areas) located on -site or off -site provided that (i) the support activity is directly
related to a construction activity that is required to have general permit coverage; (ii) the support activity is not a commercial operation, nor does
it serve multiple unrelated construction activities by different operators; (III) the support activity does not operate beyond the completion of the
construction activity it supports; (iv) the support activity is identified in the Registration Statement at the time of general permit coverage; (v)
appropriate control measures are identified in a SWPPP and implemented to address the discharges from the support activity areas; and (vi) all
applicable state, federal, and local approvals are obtained for the support activity.
Off -site activity name and location information. Provide a descriptive off -site project name, 911 street address (if available), construction entrance
location (address or decimal degrees coordinates and description), city/county and the 6-digit latitude and longitude in decimal degrees (i.e.
37.1234N, 77.1234W) of all off -site support activities. Indicate whether the off -site support activity will be covered under this general permit or a
separate VPDES permit.
If excavated material (i.e., fill) will be transported off -site for disposal, the name and physical location address, when available, of all off -site
excavated material disposal areas including city or county; 6-digit latitude and longitude in decimal degrees (i.e. 37.1234N, 77.1234W) and the
contents of the excavated material.
List additional off -site areas to be included under this permit coverage on a separate page. Off -site areas not included on this registration will need
to obtain coverage under a separate VPDES permit.
Section IV. Other Information.
A. A stormwater pollution prevention plan (SWPPP) must be prepared prior to submitting the Registration Statement per 9VAC25-880. See
9VAC25-880-70. Part II. of the General Permit for the SWPPP requirements.
B. If the Erosion and Sediment Control Plan for the estimated area to be disturbed listed in Section II. C. has been submitted to the VESC Authority
for review and plan approval, choose YES. If you are submitting this application to reissue an existing permit coverage, please provide the date that
the VESC Authority approved the Erosion and Sediment Control Plan for the estimated area to be disturbed.
C. If land disturbance has commenced, choose YES. "Land disturbance" or "land -disturbing activity" means a man-made change to the land surface
that may result in soil erosion or has the potential to change its runoff characteristics, including construction activity such as the clearing, grading,
excavating, or filling of land per §62.1-44.15:24. Definitions.
D. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity Form.
If the AS&S Entity is different from the operator identified in Section I. A., list the AS&S Entity Name. The AS&S entity is the entity or agency that
holds the approved annual standards & specification. Please indicate if this project is also requesting a plan waiver.
• AS&S Entity Form link: Annual Standards and Specifications Entity Information Form
Rev 11/2020 PAGE 5 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 INSTRUCTIONS
PLEASE DO NOT PRINT OR SUBMIT
E. Billing information. If the person or entity responsible for billing/invoicing is different from the operator, please complete this section. If they
are the same, leave this section blank.
Section V. Certification.
A properly authorized individual associated with the operator identified in Section I. A. of the Registration Statement is responsible for certifying
and signing the Registration Statement. A person must physically sign the certification, a typed signature is unacceptable. State statutes provide
for severe penalties for submitting false information on the Registration Statement. State regulations require that the Registration Statement be
signed as follows per 9VAC25-880-70 Part III. K. 1.:
a. For a corporation: by a responsible corporate officer. For the purpose of this part a responsible corporate officer means:
(i) A president secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who
performs similar policy -making or decision -making functions for the corporation, or
(H) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make
management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with
environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather
complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or
delegated to the manager in accordance with corporate procedures.
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively.
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this part
a principal executive officer of a public agency includes:
(i) The chief executive officer of the agency, or
(ii) A senior executive officer having responsibility far the overall operations of a principal geographic unit of the agency.
Section VI. Submittal Instructions.
Submit this form to the VSMP Authority that has jurisdiction for your construction activity. The VSMP Authority maybe either DEQ or your locality
depending on the location and type of project. If your project is under the jurisdiction of a Local VSMP Authority, please contact the locality for
additional submittal instructions. A blank area is provided for the Local VSMP Authority's mailing address.
Who is the VSMP Authority for my orofect? DEQ or the locality?
• DEQ: DEQ is the VSMP Authority and administers permit coverage for land -disturbing activities that are:
➢ within a locality that is not a VSMP Authority;
➢ owned by the State or Federal government; or
➢ utilizing approved Annual Standards and Specifications.
• The Locality: The local government (locality) is the VSMP Authority and administers permit coverage for all other projects not covered by DEQ
as listed above. For these projects, please submit permit forms directly to the Local VSMP Authority. A list of Local VSMP Authorities is
available on DEQ's website here: Local VSMP Authority List.
www.deg.virginia.gov/Progra mslwate r/Sto rmwaterM a nageme nt/VSM PPerm its/ConstructionGenera I Perm it. aspx
Email the completed and signed form to:
constructiongp@deg.virginia.gov
Rev 11/2020 PAGE 6 16
0 30
�"�F TREE PROTECTION
NOTES:
i - o SEE EROSION & SEDIMENT
., \ yY �qTF e2sz CONTROL PLAN FOR
GRADING AND PAVING
/ OOItNgR \ \ ` �fo� PROPERTY LINE OPERATION POLLUTION
�gfi4 / Fq PREVENTION
DRIP PANS SHALL BE USED
FOR ANY VEHICLES
/ STORED OVERNIGHT TO
.r PREVENT LEAKS
DEWATERING OPERATIONS
"COTTAGE" o SHALL OCCUR IN THE
SEDIMENT TRAP
CONCRETE WASHOUT
E A A OPERATIONS SHALL
OCCUR WITHIN THE LIMITS
SLT FENCE OF THE MATERIAL
3449 IVY RD I \,\ LAYDOWN AREA
O
CONSTRUCTION \ \� FERTILIZERS SHALL BE
ENTRANCE APPLIED IN ACCORDANCE
TO MANUFACTURER'S
\ �% \ CONSTRUCTION RECOMMEN
NOT BDAAT ONS AND
SHALL ENTRANCE DURING RAINFALL EVENTS
POND \ SEDIMENT TRAP
\ �y PORTABLE TOILETS AND
\ \ yl TRASH RECEPTACLES
r,~ THE MATERIAL LA DOWNN
, wm
qµ SILT FENCE AREA
THE MATERIAL LAYDOWN
AREA SHALL BE ENCLOSED
WITH FENCING DURING
'r CONSTRUCTION
TV 1-11
VEHICLE FUELING SHALL
SAFETY FENCE OCCUR WITHIN THE
CONSTRUCTION
ENTRANCE AREA
TIY MN rvl \
copyrRiT'6-2022 by Woolley Engineering p /
WOOLLEY ENGINEERING Pollution Prevention Plan - DS Tavern
Consulting Civil Engineers WPO Amendment #1 to WP0202100064
0 210 5th Street NE June 21, 2022
Charlottesville - Virginia 22902
(434) 973.0045 www.Woolley-Eng.com Scale: 1 = 30
VRRM SPREADSHEET SUMMARY ~�
n L5.
PRE -CONSTRUCTION DRAINAGE AREA MAP
Scale: I"= XI
sMmwaner their Va
marmot omwm or PMrpnorus removal real far she lmprovemenn reared
to mu slfe plan-co.ze IDJm me fz dgnxuc mrmeslfe Is: o?`T.ONpP1. me
Ovmer has bunch asea o RV In of numemo Hllsnam me Iry Clear xumem Bank.
MCro A. ache al M reaalremems sneer 5orc2l Ti In therefore
ala..s to ug if oflinnisk s surface For future developerent.
tb rudder WaMX'.
The poll of analysis for the protect buns chosen as the point enere all maaf Thenthe she eornerges last before omaag ender Iw Road (Route zwrva an calling
bovcu Ned me Or Arstanted analogy area at point as denrwa by Mul
SisamsMh,Nl9,7s3,Wd- pr maojectshe...ful es 4 Rhrl sf of aromas¢
area ro me poll of chains. or a cRR of the entire commomlr p tlmmage area.
This project resets rss 3enilG.a. and is outside AT thellmits of analyn's for
Food Proreclbn reaulremenh due to me site conMCWpg tralnoger area being
less man l er of the total conMbuflrq drainage area of me point of anothas.
Ounall order'.
Ranch ham me shy alxnarge ed an eushng morreade conveyance system
lea an the Runny IA, Road pcpemnrm . menarmwoferwmeyorce a haall
Me poll of charms vns radeuea to, aeforri a rriver rock I real oetlet
proet,oawould eo aua topwarnem:Ionmeounalcacaotammole
Met the maamum mlocAy though the buffet profechm aanng tM ILLyea
zHqu de, 9pm a 534 my one the peak tabu rate is tI WCR. The ofeet
psucffm bus mountain ass I , a saepth SIand for. star. A
<nw roar¢ defined by AAtNro to be a'course graterme auaxome veloc'Ay
to a R-reor xnosr deslpl f romr through a course gervel channel me and be (ass
.an a nkb pyvem ..or Soff— vlrgma Foshan a Sealmem conhd
xonabook-tably al%N_ The rm.irrum vyloclN through my propwsea suffer
number
on N les iMn me ollwoble valmlry w o I' aver rock Ilneu Duff at
firryiN considered A for atlepume Art respect to naton re5isfonce. me
peak flax rate Mil not cause amim to me conveyance system and therefore
qualifier to meet 9vAC359mM a. I nu far channel Rotecnon.
rvAGEnREw Nn.E
1. turner
nA
aP&N I
or
uA
0 loran
ad
o:i
m
pnIDa
4
a9
Ota
5
o
o
F DRAINAGE
ch
pAE
5oli
JOM
IW
R.
5
ourch
IB
I.,
IW
pA5
5
otA
/ 1%
fack
lieldreLFARrysloss
r
NroR(RAIRR
'At
'�/ d,.b/� w'A oAe
ex stwstoamw i��
I/ Then —A 0 �s' .� aaNVEy..NGEau
Rik
JAu�__
DAIe / P�T �If
� S t
If
_ Vi
0
WUow:r but hiLLARING
Fro.w,
fruslisyrvr Bmau.'uc
yearch ma
A had-.f-
n'.RR9tu
WPO/VSMP
PLAN
AMENDMENT
C Q
� Z
C w
0!� w
LU Q Q
C
� w
Q CL
Of-
p o
O0
ao
U
STORMWATER
MANAGEMENT
PLAN
Scale
SM1BGI NO.:
c., Alt a ins w w,aelle, Enanemno
C6.0
9 of 20
ttownaum`aeroy. I,dby n. ab.e9rmcmFa Ph,
IF, lilAdod Mth,OESC PFRON
ca:.p.mm" IMpi.,l=1 by,IF Ady, i m:1a ewapm9mulaprapmmaam,ablood re:lre lmlI
Nob" G III COSSOFFSON
y :.elan It Voywm mboyho a othom mme p,apeM la Nu...Food
d mdbam..my'.wmmm.mm.m d.Rm
Th 1Fa Alto11.1 ma'malrelaewiurtl*ho amS doll.1..amply—o YmM pwY I. bmFn.rn
OFNSIFTEAREAS
Niagen Nagem
SOILS
Mydbol aPmNnv. IF, At1111 mle 9a.l.9la.neon
wrurW Fpnme unmlSnB mabmerpnlelwreak m amabNm
,only Pub, AN, netre.d Fm by eabdrren.n l, lwdydoolm mbody olcanmomamlal end 9.0 mnpaanI
relnrre.Wy III I.mmigrylllbme mnln iMW1. durvm MroaPoearb Mwmmxedhun memmwryi..ed
.,.I. Wm ILL: Tnia Aeon doll litho V-15x1, r,.Imw�d rii Imw y mow, worew wore. IN Iwo e m.iM
me1Sil�sreauli me.ueunwmummadymu u�.seymeiy uFIFOSSalesd
mmiryure miiwl.neai aiwx. Rumm."'A SAINA.mumummewa.
Pwdmbmgemtlyelady,nIm rslrex.enwe. a
WMn10 Fmebm L.ana1m11 mlldtaxnn�yel.pi,013-1%I.wll areinae wil ie Pnnwowm deed, nrvmoolhow.
n ..a TMimm dap(6)w el liak. meaumaii iarcAyhoteamaamay
WiayFelmb red ad vxiaxib lm,seamnpemin®rw
xA,of A, ,A_p.mxbii Aim xiry 1. wx. Suao nmOla
Foloold wim mmmte emxm ream. s,w.ii Why bxamm-aweii puvmiae Bohn m pene.iN At e mom mNor 0)
Amy I thy ,IS lotae 01tyl y me Foot OfAHe.erb s'Pneol SlmI Ammend
m, prep yL.wenm ae e.b, an I Alpo Of m. am'm w'Min me 1111w1 Pot, 1-1011
Fly
Mnlp vdool" of of unalemaknaa to xdhibW mm.lmpanlIIIwlu
rpwrIII .00d ITI max amr 9111 mmeI. hol
boot
e, mlaviui AlimlllyloyhorthoWswlm'mNothremaeim ttllcey,prilmmees
to AOPItaN.
hol by. �1�1� re d dae�ym: ALINAPAINA SAI.Ir9ena9ldity-N
P� himbodahy,phooy, III dlalurpl othinyamomtlmwho b rrem MyySwity,0 All
ONboyll It
UNms IRn
6bei iivli.n mrwm Neu ea eppiiea m wmam amwNm wM r aerte, diAr eM aireaaz ImmNimNnnn Paein,i.m.
hrA
lII
ryy
Thom yrnlwl.lboyboayl I — to mpdwe adund®wwlereeael.a IF.Voydidlob a weilme bread wm.e-Isom
91,Iy�me.,w ev.sblmNmml�i t �m w40-11,.rmaegmgamd
NlI:wmle lon.blm. w®i,:. .niy. ,.m..m l.mlama,m.,
Sol Fold. ra1Pr%1k®wlF nlmpmmemedamwalrgnmerelm.memaxlbrm yllevlWma[rwe,amd
Aerry pryMSm. nl I III lrm SO Pont aminlm.md
OdleependYSbamrWn. FLwbwuemru,�W.I.N.—d.n.w.idnmmelme '.
_ yNrvv xlMm uaadvemae wlmepNManamay mne4eoaweukn lM gamma%
ar%..dGa,m.IF entrammblityl
reamy OL �rtt V yVAJ � w eym�mevmlFl mme dn. wool d mnml.,In9md. md.9red. mmIm..
ueud ml to
Ft.
11ermhAm lne:tetto II Oil A IA eL, bowIy
r«mwab hold
....
Imroreamlm.dotdml alwn. am Atylobby
.mu naalw..dwMmmrrom.dl.
lohodid
. y.— A m.ewmea.w.rm mw by, abbm t od, mews e, q.n
pm a mioihy IFVoi t M mmaa9aMWaupa. AS A. Ym woloodo. III
mnnred.by. IpmmIII to. Fwn lAddo U..m. I d— .. oboddy IF Al loy.
NVVAAwmvN,: as ado. wn n rm w,aa rew. w and parr
1Ay.Imel Poo am fi+Ire,....d.n`-alter:."I.I. im by., m pmdoloolmlF.m mmnrre mm, dmmm.
ammo. p�,lmampmarr.r al. r.a .I .m.
,A,pra..e..,wnr,..e.pape.Iwmm..w.erlwme.»e.aw
:emm aannm=wmegolto AM drpmYa�iq.�mt.dwapp..,WwdN.m,a
m.
.Aamrw,m mrm II.MNO.WMm-NobrmwW oabevrt9Nm-
gu IFVNyAbe mrcr X bodd m,n.x
yAVAdA Mpul 11A ",dolor V. .1,"Aty. BM.Mfiandlr Vy adepmo, th glnmv ho
mionwr yot
da.uaminF pmed.re
a0mfim0lg aerb IaNr. d�niMI1111 V.d.t,V p
wnme Ali moor. depsm roan to 111 a year I Is tobe e W s Ise abbot., eat mml A
�eatl dme epp�
d
,zly,arraaw uvemmwmaa.mpxwd erBeyrpoto mamrvmaswapmropemuuerdrmrrsmwrr. im i
ll
olory"d� a1gv�11v mw y gamlre tho e. wanoadad+aa-bred". to byro lm I. caeewa
pyhy
rythool
SIVIVAabrc--Puma.uNnakpwbbopoodmodrerXarul.fim um_en®.
ol
See ltrlymem uaeaebylemoe arson mabeaune yaoolylr0omubve avrvlre enapepaeear.To
pral.vt eryrywpab 1pn.NpmWlba.rmliep,em+niMl,p.riy lnrn,miuidarelwiryamaBm.e
Abod mr reM rroM.hoodyeaear Npe4YMm NunW rweuryeYma
RavprNh Imd Pd.rn,mCwrrry Myre.M..
A ThoFTM ke.e�m a M1pmmmrenlmlen mnerlqurydurinp landd6WMnpeM mmW,llmerllNry.
Pmbeuensweaappaam.aml repardmm tlremua�ew.anmaryanpaamanyMp
daM'dr9e.ardrev.
, F_cave
Ityl proary lnte® m pevm OIL b1,to III To nub Fboodlelymmrm„abbe Ldyly— rweltamduq
.Amda.em.p.d..gnwp.dythody Y.
No Al
All Shbol d `ohnottod Urea.dlltrnwnFpml®,m1,.e1,91m,.dl.mrymllmN,9n,FF,.d1,9. Allan.
m°iMbIIMn9myyyyyyyyw.2w en. e1aagvym® t Allx.mr,9,dlwinglootootw
bonaa�..messlnwlllmmrawllM1
�fp Ponx %enmauV urre9mu (Pmererenxul, ywaWN:mtm'mrea9S%Wmvam90%gmmeem: mawmm� I%wa
�(d�Wrmcerendd 10equx(tadun panme)eymlOStmrcwmas%omMandm%pemmmrvn:mwmnn tx
FINVIVIx-FNm,F.bo.:,.mm„9a%pwv.m9o%9., A,:---l%eam...d.
All. Shloyboyhoodybooldly—thodyly.—�1im.�
Pholootthoodr.•.�np.marNw'Wom 1idrmam.
wmxalVIt m,moy"Nod.°"
...rlmmw.d..mtlm..d.mmm.,Ialmpls111r., aydy. Hyma.9pe
pmpmd reI,m"imd nvmlm F-u1C, eoumdmblm:Gmw Pw4 mvnlmmmubr9m.rvenprelulgr 11W1
1 aama a mwpanla a Iw ppgNly.
IN nwgrwk�mA e St, 12a%
o%
wnn.Na.lnrols»wmmalreNmgmlmm. wr.w.I.rl.Fmw9ml. arm.
AWyrerl.tmtt remdlaoomx.rzma.
Ap'arorrmdetxm9 lVolo
rPIAVId'.�,m,.mrewwermmmmrw dPoo ygvrm
rm rbd AbWm rylmbv.
Lot holya mprwmawn.rr(d lnadx dbaxl raarvkmraevnoa�prwm..empGmmbmamm. rnacw,e.a
AddyAod »1,9ra aroV.aeAdemp dmra. AydV1
mV do a°.,mo avpmbm.
"`°r`a°edmnmm.rrr9.a..rrp..m"`doAmp.dm9mrarrmam;xm..ama ".,
.wam aw..tl,m.,
Ally „r,lna -IFl n .Ny n .rea F.an.a. .d. s oloy.—n)roul,a.d.w.
todyllyhol
MrymImuemntlnur l loyla
ealmmpmu.IrG almxl re MCAlnmmd ne
OINOSIIION OF11 %PAY MGSSUR
Al Ampory, ee by Mlml peg madmia dlnlmwh,
mpyd.af ,rlU1, Ill
�ry hyyy trNOb.Wde'm a bmwary„ma.rrOIL by pmnemmry
SroxSFxareR xanA E"
A. Symnyth, oath:
onde mmnmwlna al do m aue lmpmnmmu bloom to mla to to 110281",. ib 12
dPI Iu
F.1.1 r1 A: Whoyb4o 3. To Owr., In. P.-. U]91d11-.'p .Not Na I,.
N oemwe eunxe m,watdreepnmt.Iremtm. umw 9vne25a2oss. Thy Wrdr®too trAx at
B. mepIlidrIV RodlItle NOO)11, w Al mi do thy ,Al iee e,Ilnho wIII Ith Vill batayaIt bothood, NO am."Sho"nl aa�Eennelry�
VSGSSIream.mra, It 119FALSOd. To prei.dtlm.o,aleum..;oyt n d belnaw tea b W ty. d byl I,
1,..Ivw amte AdAcz5eroeF Ga.. ON 1 mom d by, Id
womnig i.apa.n.r lnm.ld.nao1 m Wng dnl.ye am Ml,9lNo ma. 1% 0 me mml
cl Mtul¢
hothFly u..Ia almluy.em,0an.emnr9m.mm...nv.repa VVIIlw,amd w FONdG I.y Rem All
e wlnl t ere ryna wu mnauw -,boot n e nrcr and uto ...
pool wvle Mam..mmpoem emelm. Tne wool oldyli Nom hill to mvlmum al.dly pool eb
pomrli.. e.rir011v 16yeu mn.w me9. I.m, la Sle Ne SM W rwdl Iw No la It os did me MM
pIMN., Abby 'I v�wlde, 06depm,31'Imp pamhY. t.M.mI. A A Nrer mdla nn,M y M9MO mb
ep mrybra2-ynr2Mwrdeel9neerm-1 a do �rarel bmrcl ..it ee
neMmmPm.nr bur ls.au.:I rO� Fmi.m. 65rimeA�Ge.a HVJAI F %Rrl. me mmil,um
WiAlly Ohl
ItAttly
annyvra e". me maerm.otho b by. NAG25d...1A. b Gb d. PNsvM.
gI
V�
8383u PnRCELBOUNDARY
SOIL MAP
SCALE: I"-300'
KEY
4E
ASHE LOAM
19c
MINNIEVILLE LOAM
19D
MINN IEVILLE LOAM
36D
HAYESVILLE LOAM
83
COLVARD FINE SANDY LOAM
0
wnoln:Y e>'GINLINI.NG
doll 111,11 Pro,rea
miugbPnmw : —
Pot R. tot
holmfinel
d,=p;lw
WPO/VSMP
PLAN
AMENDMENT
E&SC
NARRATIVE
ssmo
019 01 q
00. Ac %e0
ode:
Ap1II 8, R0Yt
Scc
AS NOietl
SM1BGI NO.:
Itholt At wayw. "Otood,p
ES 1.0
18 of 20
EROSION CONTROL LEGEND
BLANKETS & MATTING
CE CONSTRUCTION ENTRANCE
DC DUST CONTROL
IP INLET PROTECTION
OP OUTLET PROTECTION
PS PERMANENTSEEDING
SAF SAFETY FENCE-M--H—x-
SF SILT FENCE
SR SURFACE ROUGHENING
® TREE PROTECTION x—x
O TEMPORARY SEEDING
"DRAINAGE DIVIDE
/./LIMITS OF DISTURBANCE
DFL,NAGEONIOEM,
LIMITS OF DIiTUSAC o61 78 NF �\
TP
NOTE
DINAGE
/ �V �� A•
DRAINAGE AREA MNNFORMAiION �T \
Px-
NRAINFIEIIJ INSEF FOR
EPSURFS
EM M";- / �P ��
Ass If
ATo WITH
�e
DISAINFIR
P i AA v
wsiAuwnoN - \f i°e° P$ / �.�li ♦ \ 02,1s,, 'p0
UF
♦ v \
/ ps
1p
� / O/
0.60
� a
.. , O IP
P
V pS
aa��—
� N
$eQ i5p,
\
\(�i\�+ — s _ / /ea•T� Y \ \ �tY\\ % slow P
��
/�--- -- Nam✓\\\\� \ Xu\\ \ \ \\ \ \ \/�� f \
whw
/ As Sfl a,e
TI
SR\ 1
\ 1
SR
Sp ♦♦
IF
IPA'
IF/, \A
`1
w / SF p \ \
/ IP AV caNamuaS
emnxcrswul
e W IR3F. MOewMSS
iFE6iD Wx DESn11
0
csnoN,:. a\I:I.NF:F:RI.NG
IR.R��•��Ero�,
�S I"va�i
.mow
WPO/VSMP
PLAN
AMENDMENT
C Q
N Z
a�
c �
N
ui
J
Lu Q Q
% a w
Q CL
0 0
O
ao
U
E&SC
PLAN
OF
TO
R30I0
I
UL
1
\
\ \
ITS
_ �� `
�T✓� \ \
Dale:
ANN 8. 20S2
Revision:
1 � \
JVnB 21.2(Yf]
I
�\ V
"-10
SM1BGI NO.:
ES2.0
sw.. m
sERnc o4nwNEln wsEr
19 Of 20
r �awwPoll°.a,a°°ate
0
wnDM,:x E>cI.N ..
1ED
vi+' IRREFFE
CE CONSTRUCTION ENTRANCE
TP TREE PROTECTION
QP OUTLET PROTECTION
S F SILT FENCE,
t'ARMAisLH"
0.WIN9GE sal
FLgYroSEOIMENI BASIN?A
0' NIN
A A
EXTEND FILTER FABRIC %AKE
INTOTRENCH
\ \ B
.
°°jut"a-.A
YW
4L5'�
DRIP ME
SG °
lam
us al isle lAY api new_ _new ExsHwro
Exb'MlCw Lr uF+1'ELINC.
F.IF
61ALTRNACl
p
Al. WENT NO DEFINED
PUN VIEW CHANNEL
x
e
WPC/USMP
i.112 - ....1..
BACKFILL AND COMPACT POINTS A SHOULD BE HIGHER THAN POINT B.
PLANT
Ep5fin ASPHALT T'rLWr N ]OF COIJMSE
FEE EXCAVATED SOIL.
AMENDMENT
EnsFina caarn DRnr
in
Et _
SIDE ELEVATION
JH""
LO�
GENERAL NOTESSILTFENCE
D%— a
II Me M1aight of sill fence will be a miniaum of 16iriches and a mix mof 841ncM1n
IMk3S. FBI
- �H
above ground elevoM1'on.
IIL..a, WAFT JJ SIAYF
SECfIONA-A THERCULLETH IFYINey RECOMMENESEDIFFOR
21 Extra slreal filter faNc sMll be a continuous roll VlbenlonK are unavoidable, a spice
ma y
H,. FENCE
PERIMETER
ale suPPDII post with aS W¢HaP�
Has 0.RABACE
JI The ¢Rcavated trench shall be 4 inches wee and 4!MhW deep on me upslope:ae of
Ed
m sEwMENr Haw En
Me Mb .atle
me aapowa DUST on.
ITT5>µc
poss
4L5'
g
NOT..APRory uNINGAUx6ERPRAP, GRWIEORPRAP, GAarou
O Suppod pmh sM1011 beamovimum Of lOfeaf opod wM1da wire suppM is usetl. and na
mIXa than dfeet aped wM1erewir¢Is notused When pla[irg siX hands a¢fOssa tlilCM1 or
I
SR SURFACE ROUGHENING
g OIs'HEU S..1 THE RIIME APRON AS canallIFO
''°i TiwR`awcxiB.ImuM STaNEOIaaRa. BUT NOT
VARTE, the posh are to be set at a aw.imm zmterol.
me bench the
us RGVFE im pw 6rvo) Plow haw
5l mall be backnuea ana son compoclea overt)»nuerfobnc.
gyBTAC AS 11 IXASIHNC ASWLILr 12'MIH. Rw.
61 ON fences mall he removed when me HoslOpe area nos been pemwnenily robllree.
E—
SAM ENmavcr
a
A
"HOC
Z
N
'
SAF TEMPORARY SAFETY FENCE
a
GENERAL EROSION AND SEDIMENT CONTROL NOTES
i
PLAN VIEW
�s\ea\��\�BQ\\\\\\`�"
Z
_
cEs H LINnoNAL POAFTEAD TEE1EEN
OR
IWIVESIHOrosrs wux MEAL
DG Tevem
Plan
EpoThe
J
vOAS Ol lul
Albemerk. Nrglnl¢
Cou65eailbmro, VISl
The County
Ll.T Q
of
\
12' Nlx
1. TMplsn aT proving auNOMy must be wall one week III the Ma na don
mnlerence, one week m Me mm° nrement ofknd msturdne orel am one
/
a<V
..
DOZER TREADS o
CREATE GROOVES -' j
prior
week Tiro to the final inspection.
rp
� a Q
PERPENDICULAR TO
z. All emson and aediment Laohd measureswll m corewded and mandirmdiHESLOPE
Jovid, RW E0UR5E
WE
rominmumskndardsan°spmMMons of Pe Vii Emelon an° Se°Imem Ccnad
QO
A—AErHsmm caANnEPA
HandhCk aM Virginia ReguNtions VR 625L?OD Erosion aM Badmen CmhdSECTION
S. Nl emsM and sedlmmt mnW m ure6 ere ro the plash prior B, a aS Me nr6t dorm
O
dealing.
O
AAsTM'MwD J/4'HOSE ALL B£
MPr THE L0.VSExHJCENM
TRACKING -
�etluaK�
4. Attq of Me pp. ..e and eOimmt sand plan 0.11 be meirteined On Me fit,
OL
� U
Ar
ENIAINCE F0.P Yd2/E xASxWC
at all times.
S. Prior HE commencing Land disturaing anivi ies in awes other Nan indiwbd on them plans
nX11coOvplHAiEpOPxmmmEOTwNivER Pv,'OxrO wsraWrpu,
Tholudmg, but not limited so.°nale Morrax or u sM ahead Hemno-e stall GMMRa
supplements I mosion control Wan W Me owner for mwm and appm/al by the Tan
SILT FENCE DROP INLET
P
DENNIS FROM SLOPE ABOVEIS CAUGHT 6x BT@S
aa PaN+ng amnalb.
PROTECTION
...wnO .
T
RAINAGE 21 all ON.
h I
BIM BLANKETS AND MATTING
TS TEMPORARY SEEDING
� s' x
^q
IIII
GREATU THAN Issi
ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS
HATHE
Glass
"Bass
DNOR SHOT
µTxPGALTRFATMxp-
FEET M6.5
♦
WITH DM NANA
°o�E.CUT � KAVootOw
A'vra150MLv EG
nMwvr,,,�.waw�„�i
�ANe`.�o °CRI�"RIA
141
Atoo44
IN
„Ci N
P 9
CFIfEµ w MER RVE
l6cakvmM1l
UNCTION PLOT
MIN IIVI IIVI
STAIR STEPPING CUT SLOPE$
wa la-APR9 ANNDALRYEGR.a w-Iro
M1uw*rrureawwnl
E cxmxam ROEEAD. vole.FRmumRl ..m
NALFdnSLOI
Joh Number:
r.MEN AUO. SI GERMENMR sD
E
CHECAmMK SLAS SILESINTO PE BURIJdNAF0ED ED TO 112.
22010
PREP INLET
6vdr4A&aIH
'I90Pp
ITN 6RPTE
STPKE `LON
FRPME
IIrrtENARM ONLVI az
!�
FABRIC
EDGE E AND JOUNT➢
D END
"UTE
IMIN
"MAN
6u wD
g 4„RFF
c
TEMPORARY DIVERSION DIKE
DD
�'" IEUOF DGC
DGE
A
�..:
GRGDFFEDCUTENGF wS
MANTION
Data :
.NGTNEcowoIl
aMUL sreEPmT
IRR�.MC IN ME SOIL
CATCH RAINWATER AM N
COMPAC'asso,
ANN 8,2022
ELEVATON OF STAKE AND
LIME Fell AND SEE,.
RaMsion:
GATHER EXCESS
FABRIC ORIENTATON AT [ERNERS
GROOVINGSLOPES
IB'Mw
hC 'ia.
TmLEFaRMEo
NO V ETEELWEE DM
June 21.2VY1
wow
OxecKsloT
_
1I II II II II III—
-6 LEMIry IE H
fOn6ANDY6cIl
SPECIFIC APPLICATION
—�1111TIiIiiiiiii
N
roR MER lwa
E
arrow.
VAR v
NOTHERau?
INLET en trine[ NO GREATER
as THE EE an
REO
eueN
frobs ITHISMENHAr lETHIC6 ovEaAND FLax6 (NOT
Fs.I ARE TVPOA- THE MEn1OD E LNOT
APPLViFSETOINN n.B.TR Gaow66Dcx AS
B LIWDIAaRnM
NGXwnvl ME.
scale:
M Noted
SM1B<t NO.:
ES3.0
20 of 20
"Ararat a = w"d id, mdnaelre