Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO202100058 VSMP - SWPPP 2022-07-05
Al ,rl COUNTY OF ALBEMARLE �oF v Department of Community Development ." _J 401 McIntire Road, North Wing Charlottesville, Virginia 22902-4596 Tel. (434) 296-5832 • Fax (434) 972-4126 Stormwater Pollution Prevention Plan (SWPPP) Project Name: Address For Construction Activities At: Seminole Trail and Ashwood Blvd. Arbemarle County, Virginia Prepared by: Name: Ryan T. Yauger, P.E. Prepared for: Name: SWPPP Preparation Date: October 7, 2021 (This document is to be made publicly available according to 9VAC25-880-70, Part II, section D) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County CONTENTS: (from Albemarle County Code Sec. 17-405) 1. Registration statement 2. Notice of general permit coverage 3. Nature of activity 4. Erosion and Sediment Control Plan. 5. Stormwater Management Plan 6. Pollution Prevention Plan. 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. 8. Qualified personnel 9. Signed Certification 10. Delegation of authority. 11. General permit copy 12. Inspection logs Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 1. Registration statement (Provide a signed completed copy of the DEQ registration statement) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES (VAR10) REGISTRATION STATEMENT 2019 Application type. ® NEW PERMIT ISSUANCE (CHOOSE ONE) ❑ MODIFICATION WITH ACREAGE INCREASE ❑ MODIFICATION WITHOUT ACREAGE INCREASE ❑ EXISTING PERMIT RE -ISSUANCE Section I. Operator/Permittee Information. PERMIT #: PLAN/ID #: TECHNICAL CRITERIA: IIB ❑ IIC ❑ A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must sign the certification in Section V. (per Part III. K. of the VAR10 Permit). Operator Name: Contact person: Alex Mays Address: 168 Business Park Drive, City, State and Zip Code: Virginia Beach VA 23462 Phone Number: 202-498-0317 Primary and CC Email: aleX rstdevel0 ment.com / au er(cDbohleren .com B. Electronic correspondence. To receive an emailed coverage letter or to pay by credit card, you must choose YES and include a valid email. May we transmit correspondence electronically? YES X) NO ❑ Section II. Construction Activity Information. A. Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances and all waterbodies receiving stormwater discharges from the site. B. Project site location information. Construction Activity Name: RST Residences Address: Seminole Trail and Ashwood Blvd. City and/or County and Zip Code: Chartoftesville. VA 22911 Construction Activity Entrance Location (description, street address and/or latitude/longitude in decimal degrees): On Ashwood Blvd between Seminole Trail and Ashland Drive 38.112566:-78.451508 Latitude and Longitude (6-digit, decimal degrees format): 1 38.1100537 -78.441985 C. Acreage totals for all land -disturbing activities to be included under this permit coverage. Report to the nearest one -hundredth of an acre. Total land area of development (include entire area to be disturbed as approved in the Stormwater Management Plan): 19.51 Acres Primary estimated area to be disturbed (include portions with Erosion and Sediment Control Plan approval only): 1 cres Off -site estimated area to be disturbed (if applicable): 143 Acres D. Property Owner Status: FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE (Sj E. Nature of the Construction Activity Description (i.e. commercial, industrial, residential, agricultural, environmental, utility): Residential F. Municipal Separate Storm Sewer System (MS4) name(s) (if the site is discharging to a MS4): VAR040051 G. Estimated Project Dates (MM/DD/YYYY). Start Date: 07101/2022 Completion Date: 01/01/2023 H. Is this construction activity part of a larger common plan of development or sale? YES ❑ NO IN Rev 11/2020 PAGE 1) 6 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 I. 6'^ Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Include additional areas on a separate page. HUC NAME(S) OF RECEIVING WATERBODY South Fork Rivanna River Section III. Off -site Support Activity Location Information. List all off -site support activities and excavated material disposal areas being utilized for this project. Include additional areas on a separate page. Off -site Activity Name: Address: City or County: Off -site Activity Entrance Location (description, street address and/or latitude/longitude in decimal degrees): N/A Latitude and Longitude (6-digit, decimal degrees format): N/A Is this off -site activity an excavated material disposal area? YES ❑ NO 23 If this off -site activity is an excavated material disposal area, list the contents of the excavated fill material: N/A Will a separate VPDES permit cover this off -site activity? YES ❑ NO EN Section IV. Other Information. A. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities prior to submitting the Registration Statement. By signing the Registration Statement, the operator is certifying that the SWPPP has been prepared. B. Has an Erosion and Sediment Control Plan been submitted to the VESC Authority for review? YES X NO ❑ Erosion and Sediment Control Plan Approval Date (for the estimated area to be disturbed MM/DD/YYYY): TBD C. Has land -disturbance commenced? YES ❑ NO D. Annual Standards and Specifications. If this project is utilizing approved Annual Standards and Specifications (AS&S), attached the completed AS&S Entity Form. AS&S Entity Name (if different from the Operator identified in Section 1): 1 N/A E. Billing information (leave blank if same as the Operator identified in Section I. above). This entity will receive Annual Permit Maintenance and Permit Modification Fee invoices (if applicable). Billing Name: Contact Name: Address: City, State and Zip Code: Phone Number: Primary and CC Email: Rev 11/2020 PAGE 2 1 6 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 Section V. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that operator is defined in 9VAC25-870-10 as follows: "Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a large or small construction activity, operator means any person associated with a construction project that meets either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system. 9VAC25-880-70. Part III. K. Signatory Requirements. Registration Statement. All Registration Statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy -making or decision -making functions for the corporation; or (ll) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: Signature (signed in ink): Date Signed: Section VI. Submittal Instructions. Submit this form to the VSMP Authority. If the locality is the VSMP Authority, please send your Registration Statement submittal directly to the locality; do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities. If DEQ is the VSMP Authority, please send to: If the locality is the VSMP Authorityplease send to: Department of Environmental Quality Office of Stormwater Management Suite 1400 PO Box 1105 Richmond VA 23218 constructiongp@deg.virginia.gov Albemarle County Department of Community Development 401 McIntire Road Charlottesville. VA 22902 Rev 11/2020 PAGE 3 1 6 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 20191NSTRUCTIONS PLEASE DO NOT PRINT OR SUBMIT This Registration Statement is for coverage under the General VPDES Permit for Discharges of Stormwater from Construction Activities. This form covers the following permit actions: new permit issuance, existing permit modification with an increase in acreage, existing permit modifications that result in a plan modification but do not result in an increase in disturbed acreage, and reissuance of an active permit coverage. Application type. Select NEW PERMIT ISSUANCE to obtain a new permit coverage. Modifications are for modifying an existing, active permit coverage. Select MODIFICATION WITH ACREAGE INCREASE when the previously approved acreage(s) increases (permit modifications are not performed for decreases in acreage unless they result in plan changes — see Modification WITHOUT Acreage Increase). Select MODIFICATION WITHOUT ACREAGE INCREASE when there is a change to the site design resulting in a change to the approved plans with no increase in acreage(s). Select EXISTING PERMIT REISSUANCE to extend an expiring permit coverage for the next permit cycle and include the existing permit number. Section I. Operator/Permittee Information. A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over construction activities to ensure compliance with the general permit. For companies, use the complete, active, legal entity name as registered with a state corporation commission. Entities that are considered operators commonly consist of the property owner, developer of a project (the party with control of project plans and specifications), or general contractor (the party with day-to-day operational control of the activities at the project site that are necessary to ensure compliance with the general permit). If an individual person is listed as the operator, that person (or a legal representative of) must sign the certification in Section V. An operator may be one of the following: 9VAC25470-10. Definitions "Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a large or small construction activity, operator means any person associated with a construction project that meets either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications or (H) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a stormwoter pollution prevention plan for the site or other state permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwoter discharges from Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system. "Owner" means the Commonwealth or any of its political subdivisions including, but not limited to, sanitation district commissions and authorities, and any public or private institution, corporation, association, firm or company organized or existing under the laws of this or any other state or country, or any officer or agency of the United States, or any person or group of persons acting individually or as a group that owns, operates, charters, rents, or otherwise exercises control over or is responsible for any actual or potential discharge of sewage, industrial wastes, or other wastes or pollutants to state waters, or any facility or operation that has the capability to alter the physical, chemical, or biological properties of state waters in contravention of § 62.1-44.5 of the Code of Virginia, the Act and this chapter. "Person " means any individual, corporation, partnership, association, state, municipality, commission, or political subdivision of a state, governmental body, including a federal, stale, or local entity as applicable, any interstate body or any other legal entity. B. May we transmit correspondence electronically? If you choose YES to this question and provide an email address in Section I. A., all correspondence, forms, invoices and notifications will be transmitted by email to the operator. This will also give the operator the ability to pay by credit card and to receive permit coverage aooroval letters immediately uoon permit aooroval. Section IL Construction Activity Information. A. A site map indicating the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances and all water bodies receiving stormwater discharges from the site must be included with the submittal of this form. Aerial imagery maps or topographic maps showing the required items are acceptable. Plan sheet sized site maps are not required. Please consult your VSMP authority if you have additional questions regarding site map requirements. B. Construction Activity Name and location. Provide a descriptive project name (it is helpful to use the same naming convention as listed on the Stormwater Management plans), 911 street address (if available), city/county of the construction activity, and the 6-digit latitude and longitude in decimal degrees format for the centroid, main construction entrance or start and end points for linear projects (i.e. 37.1234N/-77.1234W). C. Acreage totals for all land -disturbing activities, on- and off -site, to be included under this permit. Acreages are to be reported to the nearest one -hundredth acre (two decimal places; i.e. 1.15 acres). Provide the total acreage of the primary development site as approved on the Stormwater Management Plans and the primary on -site estimated acreage to be disturbed by the construction activity as approved under the Erosion and Sediment Control Plans. The off -site estimated area to be disturbed is the sum of the disturbed acreages for all off -site support activities to be covered under this general permit. Do not include the off -site acreage totals in the primary, on -site total and estimated disturbed acreage totals. Permit fees are calculated based on your disturbed acreage total for all on- and off -site areas being disturbed under this permit coverage (the sum of all on -site and off -site disturbed acreages). D. Property owner status. The status of the construction activity property owner. Any property not owned by a government entity or agency (i.e. federal, state or local governments) is PRIVATE. Rev 11/2020 PAGE 4 16 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019INSTRUCTIONS PLEASE DO NOT PRINT OR SUBMIT E. Nature of the construction activity description. Choose the designation that best describes the post -construction use of this project (you may choose more than one). (i.e. Residential, Commercial, Industrial, Agricultural, Environmental, Educational, Oil and Gas, Utility, Transportation, Institutional, etc.). Describe the post -construction use of the project (i.e. Commercial —one new office building and associated parking and utilities; Transportation — Linear roads, sidewalks and utilities; Agricultural — 3 Poultry Houses, etc.). F. Municipal Separate Storm Sewer System (MS4) name(s) if discharging to a MS4. If stormwater is discharged through a MS4 (either partially or completely), provide the name of the M54(s) that will be receiving water from this construction activity. The MS4 name is typically the town, city, county, institute or federal facility where the construction activity is located. G. Estimated project dates. Provide the estimated project start date and completion date in Month/Day/year or MM/DD/YYYY format (i.e. 07/30/2019). H. Is this construction activity is part of a larger common plan of development or sale? "Common plan of development or sale" means a contiguous area where separate and distinct construction activities may be taking place at different times on different schedules per 9VAC25-870-10. Definitions. Le. a subdivision, commercial development, business park, etc. 1. 6th Order Hydrologic Unit Code (HUC) and associated Receiving Water Name(s). Provide all 6th order HUCs and receiving waterbody names, for the primary site and any Off -site areas included under this permit coverage, that could potentially receive stormwater runoff discharging from this activity. The HUC can be either a 12-digit number (i.e. 0208010101) or 2-letter, 2-number code (i.e. JL52). Include additional HUCs or receiving waters on a separate page. You may utilize DEQ's web -based GIS application, VEGIS, to obtain this information. • VEGIS application link: DEQ's VEGIS Mapping Application • Instructions for utilizing DEQ's VEGIS application link: CGP-GIS HUC Instructions Section III. Off -site Support Activity Location Information. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) located on -site or off -site provided that (i) the support activity is directly related to a construction activity that is required to have general permit coverage; (ii) the support activity is not a commercial operation, nor does it serve multiple unrelated construction activities by different operators; (Ill) the support activity does not operate beyond the completion of the construction activity it supports; (iv) the support activity is identified in the Registration Statement at the time of general permit coverage; (v) appropriate control measures are identified in a SWPPP and implemented to address the discharges from the support activity areas; and (vi) all applicable state, federal, and local approvals are obtained for the support activity. Off -site activity name and location information. Provide a descriptive off -site project name, 911 street address (if available), construction entrance location (address or decimal degrees coordinates and description), city/county and the 6-digit latitude and longitude in decimal degrees (i.e. 37.1234N, 77.1234W) of all off -site support activities. Indicate whether the off -site support activity will be covered under this general permit or a separate VPDES permit. If excavated material (i.e., fill) will be transported off -site for disposal, the name and physical location address, when available, of all off -site excavated material disposal areas including city or county; 6-digit latitude and longitude in decimal degrees (i.e. 37.1234N,-77.1234W) and the contents of the excavated material. List additional off -site areas to be included under this permit coverage on a separate page. Off -site areas not included on this registration will need to obtain coverage under a separate VPDES permit. Section IV. Other Information. A. A stormwater pollution prevention plan (SWPPP) must be prepared prior to submitting the Registration Statement per 9VAC25-880. See 9VAC25-880-70. Part II. of the General Permit for the SWPPP requirements. B. If the Erosion and Sediment Control Plan for the estimated area to be disturbed listed in Section II. C. has been submitted to the VESC Authority for review and plan approval, choose YES. If you are submitting this application to reissue an existing permit coverage, please provide the date that the VESC Authority approved the Erosion and Sediment Control Plan for the estimated area to be disturbed. C. If land disturbance has commenced, choose YES. "Land disturbance" or "land -disturbing activity" means a man-made change to the land surface that may result in soil erosion or has the potential to change its runoff characteristics, including construction activity such as the clearing, grading, excavating, or filling of land per 462.1-44.15:24. Definitions. D. If this project is using approved Annual Standards and Specifications (AS&S), attach the completed AS&S Entity Form. If the AS&S Entity is different from the operator identified in Section I. A., list the AS&S Entity Name. The AS&S entity is the entity or agency that holds the approved annual standards & specification. Please indicate if this project Is also requesting a plan waiver. • AS&S Entity Form link: Annual Standards and Specifications Entity Information Form Rev 11/2020 PAGE 5 16 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 20191NSTRUCTIONS PLEASE DO NOT PRINT OR SUBMIT E. Billing information. If the person or entity responsible for billing/invoicing is different from the operator, please complete this section. If they are the same, leave this section blank. Section V. Certification. A properly authorized individual associated with the operator identified in Section I. A. of the Registration Statement is responsible for certifying and signing the Registration Statement. A person must physically sign the certification, a typed signature is unacceptable. State statutes provide for severe penalties for submitting false information on the Registration Statement. State regulations require that the Registration Statement be signed as follows per 9VAC25-880-70 Part III. K. 1.: a. For a corporation: by a responsible corporate officer. For the purpose of this port a responsible corporate officer means: (i) A president secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy -making or decision -making functions for the corporation, or (h) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations, the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures. b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively. c. For a municipality, state, federal, or other public agency., by either a principal executive officer or ranking elected official. For purposes of this part a principal executive officer of a public agency includes: (i) The chief executive officer of the agency, or (ii) A senior executive officer having responsibilityfor the overall operations of a principal geographic unit of the agency. Section VI. Submittal Instructions. Submit this form to the VSMP Authority that has jurisdiction for your construction activity. The VSMP Authority may be either DEQor your locality depending on the location and type of project. If your project is under the jurisdiction of a Local VSMP Authority, please contact the locality for additional submittal instructions. A blank area is provided for the Local VSMP Authority's mailing address. Who is the VSMP Authority (army Project? DEQ or the locality? • DEQ: DEQ is the VSMP Authority and administers permit coverage for land -disturbing activities that are: ➢ within a locality that is not a VSMP Authority; ➢ owned by the State or Federal government; or ➢ utilizing approved Annual Standards and Specifications. • The Locality: The local government (locality) is the VSMP Authority and administers permit coverage for all other projects not covered by DEQ as listed above. For these projects, please submit permit forms directly to the Local VSMP Authority. A list of Local VSMP Authorities is available on DEQ's website here: Local VSMP Authority List. www.deci.virginia.gov/Programs/Water/StormwaterManagement/VSM PPermits/ConstructionGeneralPermit.aspx Email the completed and signed form to: constructiongp@deg.virginia.gov Rev 11/2020 PAGE 6 16 Section 2. Notice of general permit coverage (This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.) (Provide a copy of the DEQ coverage letter when obtained) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 3. Nature of activity (Provide a detailed narrative of the construction activities. Include or reference a construction schedule and sequence. Include any phasing.) 1.0 SITE DESCRIPTION a. Nature of the Construction Activity The subject site is located along us route 29 Seminole Trail Road and Ashwood Boulevard the total disturbed area for the work proposed with this plan is 18.78 acres. The purpose of this project is to construct four (4) apartment buildings and six (6) strips of townhomes, as well as amenity areas and associate parking. To service the proposed development this plan will also include the installation of sanitary sewer, water lines, and storm infrastructure that will serve the proposed parking areas. There will also be two (2) underground detention systems with an isolator row pretreatment structure constructed with this plan. The total project is anticipated to take eighteen (18) months to complete. b. Intended Sequence of Major Soil -Disturbing Activities This project includes the attached general construction elements in order of the sequence of construction: 'See attached' c. Estimated Total Site Area to be Disturbed The construction limits encompass an area of disturbance that is approximately 18.78 acres of land. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 4. Erosion and Sediment Control Plan. (Provide a reduced, 11x17 copy of the latest Erosion and Sediment Control Plan. Do not reference only.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County n 1 , -- /�, j;�' I Li `'�1�1 ;; •� �� '`Fps. \ � is=' /u'sA, -'y�' '''•' � - / ,/ `,,.� ST- g'6 \ _ _ _ -r 1 '1 00 49 - ---_ ----------------- - - --- - - ------ ; \ _ __ --- - / ____ -__- ___-/ O : •/ '''O�,/�// / T� - -_- `JrI ,Y� /ice'\\\ /'-rw/ 418 i 66 �� , C...... %Q/NNTO /\ 215L.F.SFI0.25AC ''✓� '��Ay / ---------- /�� \ PHASE ►A SEQUENCE OF CONSTRUCTION Z '" / W co 1. OBTAIN ALL REQUIRED PERMITS. Z_ W U ` 2. ATTEND PRE -CONSTRUCTION MEETING. C7 Z j Z W C Z W 3. CONTRACTOR SHALL CONTACT JURISDICTION AT LEAST 1 WEEK PRIOR TO COMMENCING CONSTRUCTION. W H \ W WKWW_Uo � � \ 4. CONTRACTOR SHALL STAKE AND FLAG LIMITS OF DISTURBANCE. (D Z W W Uj > � 5. CONTRACTOR TO USE THE EXISTING ENTRANCE ON SITE AS CONSTRUCTION ENTRANCES PRIOR TO H I j a = w 2 GRADING AND INSTALLING THE PROPOSED CONSTRUCTION ENTRANCE ALONG ASHWOOD BLVD. > Q o W U) C - ` 6. DEMO ALL FEATURES NEEDED TO INSTALL ALL PERIMETER CONTROLS. mej U) Z) 2 Q mQ Z < 7. PERFORM GRADING SHOWN IN PHASE IA TO INSTALL THE CONSTRUCTION ENTRANCES PRIOR TO THE 0 p 2 W Z H O START OF ANY MASS EARTH MOVING ACTIVITIES. U Z D, U ~ 0 Q 8. CONTRACTOR TO GRADE AND INSTALL ALL SEDIMENT TRAPS AND SEDIMENT BASINS AS SHOWN IN PHASE IA Z J U%' U) Of 0 _ OF THE EROSION AND SEDIMENT CONTROL PLAN. Q Of Z U)d - _ 9. OF TO PROVIDE TEMPORARY SEEDING AND DUST CONTROL OF ALL DISTURBED AREAS AS J 0_ J 0 NEEDED. U O W __ _- ' NOTE: ----- _ -'--- _ • INITIAL DISTURBANCE SHALL BE LIMITED TO ONLY THE DISTURBANCE NECESSARY TO INSTALL INITIAL U)' ----- _ PERIMETER CONTROL AND MEASURES. - / • CONTRACTOR SHALL NOT COMMENCE PHASE IB OF THE EROSION AND SEDIMENT CONTROL PLAN PRIOR TO THE \ \ COUNTY EROSION AND SEDIMENT CONTROL INSPECTORS APPROVAL AND COMPLETION OF ALL PHASE IA CONSTRUCTION. j�/IfOS`Nr�;' ,%/ REVISIONS `\`\dY00Q�PRO�ER�oxY,/NIyBS_TiGfE,IX/TS7LL�' '} 4B', ✓ec",PG 390 '', , REV DATE COMMENT dORf(NC' \ Rl'\(REST LJi i 1 05/18/22 COUNTY COMMENTS SEE S/N\FAMILY RES% NT%AL 2 07/01/22 COUNTY COMMENETS 1 I \ \I i HATCH LEGEND ,,.. DB 527AO. �•v 1� 1 i E '4' OB 3 PG. J02 (TBVJ�= '� � �Y•n -' '-_ _ � 1 , � � A II II , 0 PCO EASEA/ENl --- NB 4 491 (TB) \ I ' T- \\ Sao MANAGED SLOPES PRESERVED SLOPES PRESERVED SLOPE FIELD -VERIFIED <25% PER SLOPE PERCENTAGE EXHIBIT �iso �� SO? ; &��, -"\ft ST-2 F ;zANas N/F ,; #j / "- --�';I \ ----- -------------- FOR \\ VIR EM ,,�� � / ,,-''� ;' GINIA UNIFORM CODING SYSTEM r COMM�JNWEALTH /OF X//ROfN/A, ---- - EROSION AND SEDIMENT CONTROL PRACTICES f O. ,-' O \ / --_ y \ „ . 6. 2063 Or 66.E \ / TRIP. 04685- 0-00-00100 �� �` \ ` TITLE KEY SYMBOL PUD; PLAN ED N/T IDEVELOPME/✓T ' i \`- - SIR, USEf VACANT'\ \ \��1'498'''' //OpO"Y �o /I / I , \\` A9 _ �f/ / / - /-�.. \ \\ ,,r/"�`„✓ . \ \\ \I '\ 3.01 SAFETY FENCE SAF /T \\ \mil / `! - - E �.+ i \ �P A `\I ,y `, \ \ `\I \ I �, I ', �\ TEMPORARY STONE 1/E _ / / - / \\ , \ \ 3.02 CONSTRUCTION ENTRANCE , ------------ _ l R I 480 ------------ 72 - \ - /Fi�F, C=0.fi0� -36 i / �� - p�\ / 245LF.SF \ ICA N p+°%a'< _ 104 LF. SF 10.25 AC \\\ Al2 T_g a 1 c=oso �''�' �- Rv - I\ 1\ '' �'-------- y\ ' 1 LANDS M/, / CIP RAXCES'BREEDEN BR/�K//EAD 4ND, W/LLARD HOWARD L RI�VIEAQ % sso FAM/L Y 7TRUST Et 4L 7W..• n4600400+00,-0�9✓6, II " \� i \ \ ZON11W R71(R�S/DDN LJ I J iF / 0/ E` ` \ :. /' /' l - h_, \ ..�^"'..", - USE. S/NEE F�M/L� RES/ ENF/AL O I I 6��'' l'' \ '/�% ,✓/ / ' it*^TwJj <,.�+r""rW�' / / ,\\\ \ i `` I x C-O.fiO J x PROP. � \� \ \ 1 1 r `a \ r i ITEMPORARYI \ I I - I 1 _ 1 1 1� I 1 irl � 11 ,� �., / 4.✓ I�FIO _ \ STOCKPILE I I _ - j� `Vl -i'�� 1 Ey / I� .I / / \ /`, / � `` 1. . �, `W�-✓31�YW - \ 1 1 \ \ \ \ 1 \ II IBd�/ c` i i C+++i%� Il / �� _F ��P-r•�, \`, ', 1 \ \` oil / 1 ` p r I 1 -4B0_ .....,,� I � 1 ---- - ----- \ \ \ \ I�.� -- • i OOO IP 4p - I I agot' C,1 I 1 I o c=oso T I \ c=0.6o \ \\I #, I ° 460 -' _ 460 _ Im v 0 O , /ice / \' ly ' IF 1 f 1 , I. CWP 1 11'..,,I--1 450 450O 446IAI I I `111\ 1 I o�l oo p6 �✓ y -' I-- �. ---- ., . 1`v/RON PIPE FOt/1%D I ol� \ 05AA60kE 042- I �I o - -' OTE (WQOD P- LOT OOL AND COMMON rA _ 1 �LOCiC ✓-TEAKGYOOD PHASE 2 ' 1 ,_ I FOREST LAKES `�OUTtJ :\ --- S SOUTH -MAR i KE I v _ -- USA- F§Do7NBG.Ls'Er_1 l GI�.S,E' (/DSNy(CPLLAENFNr4E�D12�X7✓A/�!�ES10E�£WTIOXJ�b�NTjI, `�!\ N/zPUD,So55 LET 7PMENTfir,uSE ---- PUDNED UNIT DE/EL020N/NG. (PLANE/EtALFAM/LS/N(CPLLEA �N�EtMDJGYUN RES/ N�l/NE, TI/OAPL J i1 / / \ 4 J642 3.05 SILT FENCE SF X X 3.07 RM DRAIN NLOETTPROTECTION IP 3.08 CULVERT INLET PROTECTION CIP 3.09 TEMPORARY DIVERSION DIKE Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: RTY DATE: 10/7/2021 CAD I.D.: OAP- 0 PROJECT: V►RGIN►A STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES PROPOSED LOCATION: SEMINOLE TRAIL AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 ALBEMARLE COUNTY, VA 3.13 TEMPORARY SEDIMENT TRAP ST BOHLER// 3.14 TEMPORARY SEDIMENT BASIN SB 3.18 OUTLET PROTECTION OP O 3.31 TEMPORARY SEEDING TS TS 3.38 TREE AND PRO ECTIONION Tp TP 3.39 DUST CONTROL 60 30 15 0 60 1 "= 60' 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com TH OF!/ Z V N YA R y .p Lic. No. 0402056625 Q. BOA, 07/01/2022 SHEET TITLE: OVERALL EROSION AND SEDIMENT CONTROL PHASE IA SHEET NUMBER C-600 REVISION 2 - 07/01/22 I / / I ' \ I SEE INSET SHEET \ -604 \ SEE INSET SHEET \\ C-614 x \ _ --------------- `:. h , 11'1 11, -SL P ASEd9ENT 99 46 PG 43 I o b,4N,95 N1 \ Ph'�Pg7Y `RVUES*ZNXS,• .� 3.779 PG 390 4600T00\00-02914; cp 7^" \ RP (RESLpENTS4L FAW Y R2FSLDE7V. SF + o TP C- 0.60 �, 400 LF. SF \ �1 <,;" ;� ENCROACHMENT ONTO �y '` / \ �l` �; \ APPROX. L sa�EMETERYPROPERTY `\ '' �r 215 L.F. SF/ 0.25 AC EASEMENT tLQ,527 PG. 177 :\.�I r L ^ ;' ���'DO 08 466 .491 (TB<� D.B. 2-TJ PC'-.i,92 (T9VJ c ROR WETSTORAGE ` ' ELEVATION: 464.5 3 / TP / '1 w 1TS TRESS (FO) 0029-002-195 ' I % / �I DC / / I / � SF � TP SF / T- / tr Z o p,��' -------------------- ---------------- TP j 1000 vz 1 --- --��k 72 / /;Roy- TP�'� li 661T0ZZ G �� I� / T SFto \ x_ TEMPORARY LvNSTRUCAON\ EAS ENTRAN p'\� /• EMENT \\\ ,,I kOG. ' /° OB 4699 PG 43 // \ /'' / / 266 ot�/ 1 / /' /' / x \ , / °p'\�/''/ /' ROP. WET STORAGE ELEVATION: 477 -------------- k 66019 �� �% / /T % / — DC 2 0 461 b1' / , / M / / TP 00, 9kTS 00 �\/ //�\\\ e \ \ 490 - �1 r oov F / 1 � c \ I VEP�33aPG I �'I i'\ C=0.60 s - - f ' ----1� DO 0 - ' / Dc / ----- - / / r — oo TIP I�Y \ CTS F 1 1 �\ \ h DC I � / GTIO J }5 �30 ` '� �i 1 S1RUi .0p1 i o ARE= p29 V.✓. IVVJ I V L�J DID IAPPROW '------. - -- / oroEdSEdrENT �0 O.B. -- - 41 B -------- 1 / - —CU ER (1& < B - R ` s- LSE AREA 2.15 AC— v� 0 1A, PAVr LOC. j Iry A -- `\ C= 0.60 OF;10' IEPCD EASEMENT TP SF I D.B. /'466 PG 494 (TBIJ RATE \ \ � WAY / \\ \� (MATCHLINE - SHEET C-602 1 rI1L0" MATCHLINE - SHEET C-603 HATCH LEGEND MANAGED SLOPES PRESERVED SLOPES PRESERVED SLOPE FIELD -VERIFIED <25%PER SLOPE PERCENTAGE EXHIBIT VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES NO. TITLE KEY SYMBOL El SAFETY FENCE SAF r�TT�TT�T�!T�T� TEMPORARYSTONE ImoCONSTRUCTION EN _ _q)-_� IL:ILIL:IL p SILT FENCE SF XX 3.07STORM DRAIN INLET PROTECTION Ir 3.08 CULVERT INLET PROTECTION 3.09 TEMPORARY DIVERSION DIKE DD -►pv 3.13 TEMPORARY SEDIMENT TRAP 3.14 TEMPORARYSEDIMENTBASIN SB 3.18 OUTLET PROECTION Or 3.37 TEMPORARY SEEDING TS TS 3.38TREE AND PRO ECTIONION Tr TP H DUST CONTROL 30 15 7.5 0 30 1 "= 30' z LU W W W 0 Wz z D z wOs LU�WU �zwwL ju z r U EE p D 0 " Z'EE 2 �W,C U) <<z< zco2Wz_FH �zQ - tz, i� � 0 Z 0 �Z) _ We Q Wzu�a< 0 —i OH O C) W REVISIONS REV DATE COMMENT 1 05/18/22 COUNTY COMMENTS 2 07/01/22 COUNTY COMMENETS Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING SDED FOR NICIPAL ANDIOR GENDY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERW SE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: RTY DATE: 10/7/2021 CAD I.D.: OAP- 0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES PROPOSED LOCATION: SEMINOLE TRAIL AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 ALBEMARLE COUNTY, VA BOHLERI 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA 23236 Phone: (804)893-8200 VA@BohlerEng.com �6-A�-TH Aw .p Lic. No. 0402056625 4r �A 07/01/2022 `�1� 2?ONAL E� SHEET TITLE: EROSION AND SEDIMENT CONTROL PLAN PHASE IA SHEET NUMBER: C-601 REVISION 2 - 07/01/22 MATCHLINE - SHEET C-6_01 \ �� 1 i/ j , /� TP \V TP " '-�00 i � � l �� __ - � o V Ar i- SF I Y' I \ It _ 1 OPINION / / / 0 I IN' 498 ------------ -- I r //I c / ' L I / 1 1 G 1 \ o \ mom � I p y V, 0 I I I 1 1 1 1 1 1 1 1 1 ' I I I I ' I / 1 I I EL7. (TBRJ (\�� u 1 \ o�g`• /i ` oa SF 1` � \'moo i \\ \\ U �I y ✓ -lip *01 It- , -- -- CWP \` {/ � ROX. La \ -- , - - -- - � .466 PO �' OF EASEMENT AREA = A .------- -' !�, - --- ----- -�; �'' APPyDk LOC � �'/ Z'� `� ----- '� ' C= 0.60 _---- 81 - OF 10'_I�PCD EASEMENT // i� EK AS 11 MN DC D.B. 466 PC: 494 / DC / °- i�' = TIP IN = 469. \``•"''/ ' I SF E.0 PO:S4N ESMT \ g0/ EX. 8"SANITARY \ SF \\—'�49�"� 'ram'-_____\-'�\ i//4 ' /// \ '//o \ Er MN — — �= .,-rr ,, APPROW LOCAT/ON PER AS-BU/LT \ �� ,-rr• ---_ -___ / �/� PROW,9f, BY.' ROUOABUSN, CALE & ASSOG:, INC ;` --" _ _ R) TITLED- ASNLANO TOWNHOUSES AS BU/LT WATER LANDS N/F TP `�' y� -- ' ' R"C� `' \ COMMON*EALTN /RGYN/A �� - 'CU4 - L/NEANOS4N/lARYSEWER" oa EX AS-10Mf D.B. �063 P 65 DD ST 3A \ \ '/ \\ dl F�Cy DATED 10/28/1994 REVSEO O7/09/1995 R/M = 46709 Wm TMP. 046 00- 0 00>D4"" nE »"'""APP -Lee =1" % r' \�\ TEL .'% O& ----------- \ rOEASEMENF ---- �-' O PU29 (PLA ED UNl O E OBJ \�� USE.• 1 _____ / .70 A AREA --- 1 _ 4g0�� 1 _//_ /--' '-'/-� HATCH LEGEND O LOPES O ' 0. 2'A90kF - MANAGED o RO r� PROX. LOG: �},/ \\ 1 PROP. WET STORAGE �� / / /��' jTpp) 'I / PRESERVED SLOPES \ \ ELEVATION:473 r/n' / - ROP.WETSTORAGE "o CT �ED � PCOESMT 1 DC ('jRR ELEVATION:474� RKE(.Z>i*� J 494 (TBVj , C <25%PER SLOPERESERVED PERCENTAGE ERCEN AGE (EXHIBIT \I\\ I 472 1vv V GRArE /NL B14 T 3 0 i 1 o l _ I 31' 1 C=' ' 0 \\ LNV1 A 4 39 A'12 IP / """- - I _ ,' 1 ;� VIRGINIA UNIFORM CODING SYSTEM 1\ /NV B- 2, a6�. 25 LF. -18" CMS `, °U i TP / 1 ;� u„ I FOR EROSION AND SEDIMENT CONTROL PRACTICES r \` CLEAN WATER PIPE `1 n \ % 1/ T 3 �1` / /1� W NO. TITLE KEY SYMBOL 1 1 EA= 0.05 1'1 cMR �' AZARDOUS �1 11 DG �,''' \ _ MATERIALS C 0.60 0ll OI STORAGE , , of, ` AREA = 1 TS \ SAF 1 ,\_ APPRO.K 3.01 SAFETY FENCE O l 474 1 LOG. 1 I 1 DO C= 0.60 yy, / I ? OF 10' V£PCO EASE,j/ENT % ��\�. ✓'n� I' '� I I �� <frL2B 466 PG: 494 MI/J LU \ o SOAP ,DETERGENTS, SOLVEN ILL AREq(TO ENSURE I \ ,� \ \�\ I SF AND WASTE WATER OF I t ` C. / ! \1 z TEMPORARY STONE CE DRAINAGE TO ST-3A `/ OOO CE \ „ CONSTR CTI NAREAAM NI ES I �. J / i 3.02 ro I / � � � � , CONSTRUCTION ENTRANCE IF I / V \\ p I VEHICLE FUELING AREA AND SPILL � I r\\ CONTAINMENT i I " 3.05 SILT FENCE —X—X SF O Q \ SF (101 T O R I _ p _� ''DIVER% 3.07 STORM DRAIN o E STAGING AREA, RAIN In I I FFC / c' G i� INLET PROTECTION I P ---- lq dd L SA GAUGE, BPORTABLE `t q'/ TOILETS t j ERA l'o _ I � SF N RE WASHOUT I `- �''��AV II�P I _ AREA I �� I\\ �i�' / 3.08 CULVERT INLET PROTECTION \\ o fC OF 10' VEP,G'O EASE , I , _ _-' B )_ - 1 - ,- O.B. 466 PG. 494 _ _ U ` - C/` 3 09 TEMPORARY DIVERSION DIKE O o I \ � � RJ= ClR / / I TP r I I ROADWAY SP T P SIF A AlEO PRNA TEMPORARY SEDIMENT TRAP ST \ 1 II NAB - LLfA. i / I - Y �N_zt \ 9R 0 1 11 I -- $ \\ 3.14 TEMPORARY SEDIMENT BASIN SD I `�I` 11 / SF i I DO ` — 480 __ -- _ 'i '\ \\\ �I A 1 1 A 1 1 3.18 OUTLET PROTECTION 1 1 0 , 1 o OP / 1 ------------------------------ TP I P _- ROP. WET STORAGE __ --' i i _ _ ' ` o ELEVATION: 467 `r DC \ 470 -_ __ ------ - / / 3.31 TEMPORARY SEEDING 1 T$ TS ----- - --- r REA = 0. 8 A . ---- // DC / / OF 10, VEPCO = / - . 466 PC =0.60 N C O 60 I �' J ` -3.38 i ✓ � 1 `OB 4 C TREE P SERVATIO ___ 1 S I it 1 � / \ � ❑ AND PROTECTION O TP CWP , , 1 , 1 0 ; 1 III< _ ____-'-" DUST CONTROL i I IP I I � A DC oc of -- -- / / �� � ,' I� ' — C= 0.60 I , y i SEE I�SE'�THfS SHEET � �I IP _ / � � ter• 1 ��I 30� lip ✓y j U CLEA�µYRI Ih� Q - / , l� DO vo DID 1 ° i `Do TP 1 � /NV- 46 TP SS --------- , - -_ I , / rQ SF ------ __ - - - , 1 i 30 15 7.5 0 30 1 "= 30' � \ 3 S F� w" LU 8L EE LU LU Z H W W W Z WH(D W W� O¢ �gU-U� �< Ur Z W W WJU > W Zr( E00 O_z 'g3 ~wax wZ , J>ZUw U)0 �E r=n��a<ZQ < 00<Q_ _Of H �Q0!Urn�d &c J U' (i 0_ U) < Of U) < s a Q of �> > F Nc O U " �F LU 5 s 02 REVISIONS REV DATE COMMENT DRAW CHEM 1 05/18/22 COUNTY COMMENTS PC FIT 2 07/01/22 COUNTY COMMENETS PC Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: RTY DATE: 10/7/2021 CAD I.D.: OAP- 0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES PROPOSED LOCATION: SEMINOLE TRAIL AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 ALBEMARLE COUNTY, VA BOHLERI 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com _ ZTTH ;1 RTAN YAUZ•iER Lic. No. 0402056625 6, 07/01/2022 j SHEET TITLE: EROSION AND SEDIMENT CONTROL PLAN PHASE IA SHEET NUMBER C-602 REVISION 2 - 07/01/22 LMATC H LINE -SHEET C-601� _ 50 X \\ APPRo�1`.' "IOG - 0 OF ;10' VEPCO EASEMENT--\\\� \^ + C 0.60 SF \\ / D.B. 466 PG. 494(MY/#`��'' -- �. \\ -' - .v v �� \ ll -CRATE \ \ \ --- _- /� R \ / It eel It It er 0 / E TSIt I��APPROX. ` \ PROx. LOG: E 4SfXNT // \ / / :� %I' D.B. 466 Pc. 494 (TBVJ EN \\ r r, / 1 , \ / _ , It ItIt APPROX. LOC. \ 111 \ \ �^ / \ o o' V£PCO r V' \\ (7Vi N - \\\ 1 PO 49 \\ / � :,gip N TEL ®WM - ; \ j / / � _ — — — `� � � \ � � 466 PG--4N lE 1 \' "� F, _____-_____ GV> / - --' E1`flCiER7'(TA1 AREA 0.5� AC �EXTAFicscN6g\m 0.60 - LMETV1 It IER G°L------ �`` \ `\ __� / 245 LF. SF �-- ---o-- 000---- 104 LF. SF 10.25 AC 1►• R0 } > �` I i W Q W� 1 ER1��R�/ I�Iv ADD PR \'. -G LV ALT P'' _ V J ! / `'�gR) / /sue / '\\ \ \\ Z \ R)i /' / ART// //' /' APPROX. LOG: J ? of 10' lEPCOIt AL D.B. 466 PO. 494 (Te1'J APPR01�, COG / \ \\ 'of OF 10, VEPGb EASEMENT\` l \ D.B. 494 PG. 11540 \ It \� iGUw / \ ///•Y /PED. (TBR); % /l / j/ �\ ---- ItB-1)1111 V CUL FF AREA = 6 30 ACC ` '� Al N r� / kk, T� GULVER` �?'' C- 0.60 � /1 / / '. -- AP,PROX. LOG: / \I ,\\ l / ; // / � vF 10'VfPCo EASEd(EM : D.B. 466 PG 494(TBVj�, y APPROX. ZOO v , . / OF 10'12P,40 EASEMENT a / 111 rrrrr \ 1 PROP. TEMPORARY / x STOCKPILE,-__ SF — J F TILE PARCEL'ONE 11 . \� , I , LANDS PETER A. I ZO�L/S AND 1 /ERAf //A ZO[7LfS� TMAI '9 5 650 P64`,507 dj60000-m-028A0 \ 110 N/(l/G I, R?`, (RESIQENT/ALJ' \ S)iy\GGr- FAM/,LY Rg1DENT/AL \ SF \1 �_� w n ' o� s � o 1 -, TP v — — — — ------------------ - \ \ ---------- — -- ---- — --� 1 1 _i ------------- APPROX. COG: / l �f OF 10' (�PL'0 EASEMENT 494 PG. 540 (79Y) / LANDS NIF FRAiVCE.S BREEDEN BRICIfHEAD ,AND ; W/LLARD HOWARO BR/CKHEAQ I FAMILY TA(ST, ET AL 1 W.B. 128',PG 719 TMP.• 04600-dQ-00-029✓0 ZONING.• Rl (%'ES/DENT/ALJ U TP SINGLE FA)lAY RES/DEN{/AL 1 I I I I I I SF I APPROX. COG: IF OF 10' IEPCo EASEMENT DO D.B. 494 PG. 540 (MY) I� ' I I I I ' , ' 1 1 , 1 I 1 , 1 1 W W CA I '1 O CS1 O I , N N , O N Gj 1 y ///rLTJl 90 L I I I I I I V. / '% 1 /' y / //11 111 TS I? OF 6X0 EASEA%EMT III `I �� 11 \ � LANDS OF � �' I I / \ '� 1 � / � ,� E . (7B _ � ')'iB. 4 540 (TBVJ " HP -PARK LP D 6. 1883 PG 2g8' \\\ �/' \ \/ / r/v x \1 \ 1 1 / TMP,.• 04600-00,00-10900 `--- �/ / y - \ 1 - A 67f,929 S.F,�R 15.540 A (M) �\ AREA: 15.558 AC. (R) (T�1/J \ \\\ \\ \ 1 /.�%� •�= _� . A � 1 •iT,i/ lTTb /TTl / �/ lTT3 /TT1 / \ � I , I I I Jii \ \\ I I I 1 � ' ` ,', '/ `` � \� ___\ F` `\�``\ 11� `\�\\ \ .'1.ir/mac/��/c.c.cr /.�•�c /1.c.�/ \ I 450 ROP. 36" RISER WITH— \ PROP. 130' BAFF - j i / \ 54" TRASH RACK (79 __ 1 l ` /�, `\ 11 •` ��c. � 1 � 1 `0�� ENT 11 �-�- 450 448 rn 1 1 I OP. TEMPORARY 21" 11 11 1 1 1 CMP @ 2.5°h 1 it 1 `, ', NV. 447 p 'i li I �� 11 1 \"--'—[.LLG 12' 1 I I 'PED (TBR) " I COkff ()BR) 1 II � SF '' PROP, TEMP RARY` 1" `` \ �� ,' APPROX' DD I '. A II DD __ - �` 1 CMP @ 2.�°k 1 /l OF /0' EASE E I DD O.B. 494 PG: .I'T�/ EMERGENCY / / / I ! _— I----_--J' INV.446 SPILLWAY. ; I l s TP \ u S65054'00"W 1025.97' (R) rP I 1 1 1 1 1 1 1 ♦I —\APPROX. ZOO. OF 10' VEPCO EASEMENT I 9..E 494 PG. 540 (TBVf 1 1 " IRON P/PE FOUND' ' ' SF 05' ABOVE GRADE HATCH LEGEND MANAGED SLOPES PRESERVED SLOPES PRESERVED SLOPE FIELD -VERIFIED <25%PER SLOPE PERCENTAGE EXHIBIT VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES NO. TITLE KEY SYMBOL 3.07 SAFETY FENCE SAF . • ... • � riiiii •iiiii • • ,I��I �l �1 �I. H SILT FENCE SF XX 3.07STORM DRAIN INLET PROTECTION IP 3.08 CULVERT INLET PROTECTION Cep 3.09 TEMPORARY DIVERSION DIKE DD �--►— 3.13 TEMPORARY SEDIMENT TRAP SI 3.14 TEMPORARY SEDIMENT BASIN SD 3.18 OUTLET PROTECTION Op 3.31 TEMPORARY SEEDING TS TS 3.38 rREE ND ION PROTECTION AETp TP H DUST CONTROL 30 15 7.5 0 30 1 "= 30' LU z EE W W W co z F w D Wz W19w9 CWgzWwIW5u z r C9 t= Wp D' o ~ W Q 2 W E> z U W W r=nS2ej aQz< Z U)2 W ZFH 0zQQQ~C < 0U)WU z a< o O U W H V) REVISIONS REV DATE COMMENT 1 05/18/22 COUNTY COMMENTS 2 07/01/22 COUNTY COMMENETS Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: RTY DATE: 10/7/2021 CAD I.D.: OAP- 0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES PROPOSED LOCATION: SEMINOLE TRAIL AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 ALBEMARLE COUNTY, VA BOHLERI 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com _, TH e,. RYAN YAUZ•iER Lic. No. 0402056625 6, 07/01/2022 j SHEET TITLE: EROSION AND SEDIMENT CONTROL PLAN PHASE IA SHEET NUMBER C-603 REVISION 2 - 07/01/22 1 1 , , I I 1 , I I , I � l I ' ' I � , I ' ' I � � I I � I I � I , I I � I , ' 1 I ' I , I I ,\ I I \ I r \ 1 I �i / /vl , 1 r 0 I , 1 1 , , , I , 1 1 1 I 1 JI 1 , , , L , ,---------------- / 4f00 �I TI �1�LOB��LOD��C� I I , i I _ B INLET RIM=471.87 ` INV A- 46790 }---- INV B-46722 SEN/NOLE TRAIL - U.S. RFE-29 �- --- ------ -- `-------- -CURB INLET --- ------ __ --------- ----F _ - --- _ %dT 380LV- /NV A=469.28 i ASPHALT PAVED PUBLIC ROADWAY \ — — _ _--------- ------------------ - _ INVB=46923 1 \� --- __----------- IP _=47b_Ti---- - -----$__------ -- --____ --___ -��_ _----_----_ -------------- _ — — - --- -- -- I 47a__ I I ' _001 - - OOl _ COL — —Op1 — — 11DL — ________________ 2657AOO LOD�LOD 2658,100 I 21,99 00 ODD — pp - 1—Eoe�—Lw^ Ion Lp�--------- ---- — — - -------- -- ------------------------------ - -- ---- _ ____ — — — .------------- M1 ^ -4777� h y o --48B.3r -- ' INV - TJ51-' --- -------------------- --- _ 1 \__------ - --------"------------------------- I I o SF N --------- Jam\ /- - - - - _ —4Bo— — — - _ - � - '. - --- - - as -- -- -------'. �\GRATE YNLC�J /GRATE INLET ,� �1 t 07)CM-475VO ��� = R/M-47B36 /, --- ---', I, 7�i30 BOTTOM47536 , 1 1 - _-1 1 I - , I 1 - , I --------�1 / / ------------------------------------------------------------ 6ZW7Nff)-0 / ---------------- ------ ------------ - c------------------R/M=48Li ------------------------ - - /Nt 4i/E IP i---------------------------------------------- ---- /1---•-� _M—TM �� .. - �X(sF -- - 8 , fR112 _ •� ENTRANCE EASE -- Pq RY CONSTRUCTION w f �� Hm I i I I I I I W cf ) c --------------- ------------------------ _ - \ -- `_- / 266 "--------� y _ ---___ /_ -___-__ --- -- - _/L--llz-&-R ' g /ABLEPT-------- - __ _-_ ----- "`-----" ASPhA\TA°0 PUBLIC ROADWAY W _____________'_------_- _______ QO __ — �OOl�001 ---IP 90770M=47J.79 I �F� —X ) _ X - /i X i 626.68' R6M) � \ I I ' �i ✓ U- i---------- � -- _ ----------- _ , ------- i I I -----_---------- --- ------- ,I ,I 266100', / i 2662t00----.-- '� l� -------_ -________________________ SL+M►/ 04E TRAIL--�[/-&-RTE 25 1ABLZETWP/1,DRGW—OF—WAY _ ----- �` D PUBLIC ROAON',4Y -- ------ O01 OOl COl OOI- 001001 0( -SF u 4 M M M M Mf -4i -- _ .. APPROX. COO. \ OF VEPCO EASEMENT lS 0 YIB-�30 PO 193 HATCH LEGEND MANAGED SLOPES PRESERVED SLOPES PRESERVED SLOPE FIELD -VERIFIED <25%PER SLOPE PERCENTAGE EXHIBIT I W W 2 rU) V �W z EE W W W U z F � p W z Wb-w6 rj z rW C¢ 2 W E ww - H �ofoC U)a¢'F v»�¢ m( z 0 0< CL W z F H °zD<~c Z J W U)W� 0_ C) O0� ¢ zcnD_< a O O W H Cn REVISIONS REV DATE COMMENT 1 05/18/22 COUNTY COMMENTS 2 07/01/22 COUNTY COMMENETS I Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION VIRGINIA UNIFORM CODING SYSTEM DOCUMENT UNLESS INDICATED OTHERWISE. FOR EROSION AND SEDIMENT CONTROL PRACTICES PROJECT V1920 DRAWN BY:: MEG / PMM CHECKED BY: RTY NO. TITLE KEY SYMBOL DATE: 10/7/2021 CAD I.D.: OAP-0 PROJECT: 3.01 SAFETY FENCE SAF VIRGINIA STORMWATER (�[ MANAGEMENT PLAN TEMPORARY 3.02 CONSTRUCTIONONE ENTRANCE CE �E FOR 3.05 SILT FENCE SF X X RST RESIDENCES STORM DRAIN IP PROPOSED LOCATION: 3.07 INLET PROTECTION SEMINOLE TRAIL AND ASHWOOD BLVD. 3.08 C CULVERT INLET PROTECTION CIP ® ALBEMARLEV11 COUNTY, DD -�►- 3.09 TEMPORARY DIVERSION DIKE BOHLERIO 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 ST Phone: (804) 3 13 TEMPORARY SEDIMENT TRAP VA@BohlererEng.cng.com p TH OF 3.14 TEMPORARY SEDIMENT BASIN SD o� �y V N YA R y 3.18 OUTLET PROTECTION OP .0 Lic. No. 0402056625 Q. BOA 07/01/202��1�� F 3.31 TEMPORARY SEEDING TS' TS ���NA►" SHEET TITLE: EROSION AND TREE 3.38 AND PRO ECTIONION AND TP TP SEDIMENT CONTROL PLAN 3.39 DUST CONTROL DC �� PHASE IA SHEET NUMBER: C-604 30 15 7.5 0 30 1^=30' REVISION 2 - 07/01/22 m PHASE IB SEQUENCE OF CONTRACTOR TO BEGIN MASS EARTHWORK OPERATION TO REACH PROPOSED PAD ELEVATIONS. AS THE ONSTRUCTION , EARTHWORK OPERATION IS BEING PERFORMED CONTRACTOR TO ENSURE THAT ALL TEMPORARY DIVERSIONS \ ARE MAINTAINED TO KEEP RUNOFF DIRECTED TO THE EROSION AND SEDIMENT CONTROL MEASURES SHOWN IN Z PHASE IB OF THE EROSION AND SEDIMENT CONTROL PLAN. l i♦ i (, (lC �� `\ \ ._-' _ _ �/ '- ''' / ,% 2. CONTRACTOR SHALL GRADE AND BUILD THE SIX TOWNHOMES PROPOSED WITHIN SB-1 LAST SO THAT SB-1 CAN W 1 '♦ 1 i ' \ `. ` / ''J/ �' /% ' �_- . ' \ REMAIN IN USE UNTIL THE SITE ADJACENT AND UPHILL OF THE SEDIMENT BASIN IS PERMANENTLY STABILIZED. co 3. ONCE SITE IS STABILIZED AND STORM DRAINAGE NETWORK IS INSTALLED AND IN USE, CONTRACTOR TO MUSK OUT I- of SEDIMENT BASIN AND OVEREXCAVAE TO UNSATURATED SOIL. CONTRACTOR TO BEGIN WALL CONSTRUCTION TO Z W H Z W C / `\\ `,\ \ \ \`\\♦\'-; `♦ `♦` \ ` :\ ` /'/' ' ' / ; h �';%' ' " /; ' \`\ \V\`C BRING REST OF SITE UP TO GRADE AND FINALIZE TOWNHOME PADS. W (0 U U p ` \ `, `♦ h \ \�\� -` '` `♦`� ' ' /,, _ _�-'- ' `` ` , , 4. CONTRACTOR SHALL KEEP ST-1, ST-2, ST-3A, ST-4, AND SBA OPERATING UNTIL SITE IMMEDIATELY ADJACENT AND UPHILL Z Z W U) U ----' OF THE SEDIMENT TRAPS IS PERMANENTLY STABILIZED- ---------- r ~ U / \ \ \a`♦yII, `♦♦ \ ` `-♦ / / 1 :: '-'" ' , ' rrr -. `\ ` ' ' i H W Q 2 W 2 (s,S 'S"' 1� _ i I 5. CONTRACTOR TO BEGIN INSTALLATION OF ADS SYSTEM 1. J i Z U W U " ,` ♦\ .\ � _ � ..____.\ ,/ �` i !�; ,'' - � , \ , �.`�`,`,. •. ,- 1 I I STORMTECH MC 7200 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS U) Q U H Z COMPLETED A PRE -CONSTRUCTION MEETING WITH THE INSTALLERS OR PRIOR TO UPSLOPE STABILIZATION. Z U) W F \. 5.2. - CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE STORMTECH MC 7200 - ♦ STORMTECH MC 7200 CHA 0 p Q Q Q H p CONSTRUCTION GUIDE". Z (J H g ( __ \\` ` _ _ -------'' ' ' `\ P� �1n' f"--,: - -- 1 ` / 1 \ `\``\\ \� �(`e`,�`-�. `- -��"' /,,' ,,' 5.3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR EXCAVATOR SITUATED OVER THE CHAMBERS J U 0 w U_ Z RMTECH RECOMMENDS 3 BACKFILL METHODS' Q ------- _ vV 4=\'' � v ' ' \\` �` - \ 5.3.1. OSTONESHOOTER LOCATED OFF THE CHAMBER BED. ; a 0 r v Z ' __ ___ 5.3.2. BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR S __ y �.s�; __ _ _ - , 69' -' ��� ' ' ��` / 5.3.3. BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG e00M HOE OR EXCAVATOR W ---------------------------- �� _ / r % ` �� ``♦♦♦` - � � _ 5.4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS. - -__ — — — — _ _ /'� �%�-;�%s� /;;; h/' ,--- � � v;`_ A ``� /'; __ -__ __ -___ '' 5.5. JOINTS BETWEEN CHAMBERS SHALL 8E PROPERLY SEATED PRIOR TO PLACING STONE - to, _______________________________%::. , - -- - . _ -, _ � - / / � � � ,,' � q�1 - � ` �%�'/r 5 6 MAINTAIN MINIMUM 9 (230 MM SPACING BETWEEN THE CHAMBER ROWS �-` - --__ ______________ Q9 -,,� ', 00� g5' - �T 480 �' v� V r / 5.7. INLETAND OUTLET MANIFOLDSMUSTBE INSERTED A MINIMUM OF 12" (300 MM) INTO CHAMBER END CAPS. a - „ / 4 4 � -- -� o '� y:�s'!%� ! ' !- -- ,\ � \ ` "- /;' ; 5.8. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE MEETING THE \ ^.o _v� AASHTO M43 DESIGNATION OF #3 OR #4. � _ /' O° j ",__\�\' Im 5.9. STONE SHALL BE BROUGHT UP EVENLY AROUND CHAMBERS SO AS NOT TO DISTORT THE CHAMBER SHAPE. STONE _ ------- - - \ 484 ,. \ \ \\` \\\` \` , \\ \ `�\;`. `. DEPTHS SHOULD NEVER DIFFER BY MORE THAN 12" (300 MM) BETWEEN ADJACENT CHAMBER ROWS --_, _______________ ------- STONE O,`\ 5 10 THE TOP CENTER OF THE CHAMBER TO ANCHOR THE CHAMBERS IN PLACE AND \ \ _________________ Q ?AND M�E� - \ ` STONE MUST BE PLACED ON %:;: s / \` \ ``�% ` PRESERVE WSPACING. - -- \ --_____________- - /y ;-, '� - 486 `' _ \ \ , P♦ERTX 1/UUES.TaVT'S,LL� `� i 5.11. THE CONTRACTOR MUSTEPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIAL BEARING '/ - 0.A SF 'g& (, �'`REVISIONS \ _____� — — ARtA_ _ \\,\`\`` `♦-` CAPACITIES TO THE SITE DESIGN ENGINEER REV DATE COMMENT _ - ---__ - '' 'b0 00-0O— '' '1 `\ i 5.12. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT' INSERTS DURING CONSTRUCTION FOR ALL INLETS TO ` _ o - ; - �. \ \� PROTECT THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF. 1 /1 /22 NTY MMENT \ --_- -- / - - _ \ \a 05 8 COU CO S wT _ a / ST-1 � \ �(i��'�.``�'` R�`\rRES)D�- LJ ; n _ - _ _ _ / S`` !LY RESNTIAb • \ �`.,'`.__ '�-__ -�--__ � ` �----_ _ -___ -` ---__ � -- � __ -_ - ' `. __- � , SEE SHEET C-908 AND C-909 FOR MORE INFORMATION REGARDING THE ADS STORMTECH SYSTEMS. _ -'/ / /" ./'� " /+�/ / \ ' 49 _ �." `♦\ , \ \2 07/01/22 COUNTY COMMENETS - - - ____________j' / y%' i ,/ _ __-__ C-0.60 ,`\\\`.; \ \ `, `I``\; `` •I NOTE: THE COUNTY E&S INSPECTOR SHALL APPROVE PREVIOUS PHASE PRIOR TO THE NEXT PHASE COMMENCING. _ - - ---- -- _____ - 489 L/: -.. 481 \ SOD �\`` \//A�' ♦` ` 1 i II i II I \I \ I \1 , � \ ,` ,1 \ �/- / / 61 a6 �� i.� - r'✓CY-- 0 I 'i ii`,`\\,\\`i `1� 1,\'\ `,I � `\`\'1 '\', I'\ i O 00 `, I ' i 0 - ���� 470 ' I bi i i i b ♦ v `v ` � '` `v vI '' ' 'i i ', V'v '1 I, 'v ` - - V `♦ Y�� � � ° a0 � ' �" 1 A - � � 475 ' , � i 1 v �n v , , `, `, `, vv 1� v `, v ', , 1 v� vv `, v� 1 ♦ 15LF SF/ 0.25AC _ -, y i ``v V,I, 'z,- r .> I .i '''G$�S' ry _ `v� 'v Know WhaVs below. IN-9 _-' / l' 4l6 �O �v ♦ `------ Call before you dig. ,''AVA -_-__ �— _ _____-- ALWAYS CALL 811 ; ash ; -- -- -- �� �" ----- - ----- HATCH LEGEND I' fast. free. I' h l w. `, V v , <"r" //'/1 / ,,,ice r / i i i i' A - ♦ h� SOp- / a°' - '/ _• ,- a `��vv 1S BS1 1S(S(@B , , i- ` MANAGED SLOPES C WN{hE4 H OF -- PRESERVED SLOPES NOR rMP;o4�e CONSTRUCTION \ ?::\ I I 'f �. 1' .�✓C,`• p00 �PLAiUED%!-�N�T''D ELOPMENTJI, — ___ - - - ----- -- _489 I „J, `�--. - _ , - `\ \ ' \ '1 ' I �_� \ �'I ` ` ,�, _ \ \` PRESERVED SLOPE FIELD -VERIFIED/ Ir '♦ `` ` \ ®\nl,` , U•E VCAN ` ` \ 9ti-- -----, i .�' ' `\ ' ` _ `�\'\ <25%PER SLOPE PERCENTAGE EXHIBIT THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY A ` '\, I '\♦ `\ �s \------ �`�� , \� REVIEW AND DOCUMENT UNLESS INDICATED OO ERWIONSTRUCTION / -- , I I 'I \•� \' `\\ `\ `\ I I / I I \ ':�5"- �6 -� q.J[ ' , i1- i 1 ` - ``\` DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 ,` , `, `, `, , i i -a9 '-� ✓� _ t. �'` -':i / ,� _ , �`, ` V/)(y•�(�e,'Yyyv{}p``\, DRAWN BY: MEG/PM I ♦ � � 1 I , . . \, � , I CWP /----------- I \\ \\ \ �, 'll I ' I I, , 11\ , \ `♦ ♦` �`♦ ) O\`�.. �1 `\v` i C=0.60 ------ - 489 1,'/- �/ I',' ���� '-_ __ 1` '1 'l lll'`'I\�\`♦`\ _ \ , / I , \ 44 ------------ 0 - j � ' i i i i ' ' /' i i i•`^�1"� A I Ofi0 4 _ _ ' , '' _ 's v`, r 1 ` - - - _ - _----------- EA 1.22 AC r l r l I , ____`.`` \ \ ,I ♦\ \ ` 4 ,I I I \ l ' i %',n f�� \ `I 485586 _ ___ T /•3 i' ( ' 'i / f '/i's�-, , 'i ', '1 5L .SFI0.25 AC ------- SF ,''/�' i ' , / , ; ___� ♦`�`\ , , IP 480 ' \\' `\' ;' / / �' �,'.:%"_ ,`` ,' --` - _ '' LANDS N F BREEOEN B /CKHEAD AND vy ��." = o ;' / �' / - - -WIZ-64R0 HOWARD BR/CKHEAD ___---- ---" F, 1Z Y TRUST, ET AL 482 _ _ i ; i i ( ' i' ' I�I,I ,.` \ p r 472. ' i i, \ __ - __ `•_ \li o co q1\ d \ - ,TMP.' 04600 00 00,028✓0 IIIII ♦ ; ; ; 1h �/ h ',.y` o \ �s ZONING- R1 RESIDENT/AL) ✓SE.• '�-INGLE FAMILY RES/DENT/AL 465l`•�., , I, I ♦ ♦ 1 b - I \ , tr ' I I .___ i i -_ '"i "-,"-''"_ ',' ,_ _ __` 1 ``1i1111 I ?j \`, ' _ -_ - / i' , I I I I ' i 'I ' i I � i _____♦` `\ ,-- ` _____ ' � �i ',--,_'',-"-%_- �_-_,-', ,; .__` \1il\ 111 I `♦ _ 1 i / i , i i � I I i � _ � \ � \ p1� �B O � ., -'� ` ♦ ` � ( ' i , , I 1 IP480- A; ST 4 475 , L, In l I 47D -_-_ 1 I 470 - - - - (, 111'1 II O v I - \ '♦ 465 B —�- -- _/ _, , :'' `♦ `I , I ��� , Ii I i' i i'' S J 450 B� 450 4 1"IRON PIPE FOUND t� „ ` ABODE OWf 1� A ;,/,'�'„`\\`_ _ II11111` III _� _---- lI __♦. - I I 11,1 \`:` \ 11 � \ _: ©-I+VJI%U'LVLK_-- ,_� I I, I v , A \ , , v`♦ I �I `\ \` yOCl(�('�T I����\l%f'AI'S1 �2 LOT 17 OCK ✓ TEAKWOOD E � SOUTH _ 2 \ ♦�\ I �_`_ �-/ __ ,4f�E3'� '-;:= ''- � I �{ II \`\ `�\ D. 42 PG. !', / - i \ \ ♦ ;' \i/ �PL �; Fl/IIiT bZ''� OPMENT� l DB ' 6�-y'G. 558 r \ ZONING. PUD ( NED UNIT OL{l/ELOPMEN / / \ 7/SE;1S/�/ZY£(D7VT/AL LOT 18 USE.- S/NOLE FAMILY RE---ENT/AL --- 70N/NG-BUD (PLANN�FD�N��£1�ELbPMENT� / ` BLOCKI✓—TEAKWOOD PHAS 2 p �� , ---' , � � -- --. � \�\ , _ � �'' I r 1 ♦ I'. � - FOl4FST /AKF.S .SOUTH VIRGINIA UNIFORM CODING SYSTEM CHECKED BY: RTY DATE: 10/7/2021 FOR EROSION AND SEDIMENT CONTROL PRACTICES CAD I.D.: OBP - 0 NO. TITLE [KEY] SYMBOL PROJECT. VIRGINIA STORMWATER H SAFETY FENCE SAF MANAGEMENT PLAN FOR HTEMPORARY STONE CONSTRUCTION ENTRANCE lJC RST RESIDENCES H SILT FENCE SI• XX PROPOSED LOCATION: SEMINOLE TRAIL 2STORM DRAIN AND ASHWOOD BLVD. INLET PROTECTION �P CHARLOTTESVILLE, VA22911 2 ALBEMARLE COUNTY, VA H CULVERT INLET PROTECTION CIP BOHLER// H OUTLET PROTECTION H TEMPORARY SEEDING TS TS R PERMANENT SEEDING PS PS 3.38 TREE AND PROTECTION ION t TP El DUST CONTROL 60 30 15 0 60 1 "= 60' 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA 23236 Phone: (804)893-8200 VA@BohlerEng.com pLTH OF L �` CI 2 V N YA R y .p Lic. No. 0402056625 �O.t�_ 07/01/2022 AV# SHEET TITLE: OVERALL EROSION AND SEDIMENT CONTROL PHASE IB SHEET NUMBER C-605 REVISION 2 - 07/01/22 all TP 9 V �✓ � ;� A ; I 1, I ' /, � � ,� >- -I \ `GHQ //// /♦ - �\ . \\\ �`\\\` ♦ \� ♦ — \ \` -- - T '1 TEAYRORARY CvN5T1?1167/01V R_ EASFMEVT P0. 4.3 \ _ \ ♦ / �-- /:;',, O //��''�/ ';,. / PROP. WET STORAGE ♦ ♦-------- A, ELEVATION: 477 ------------------ / DC 5 / j - TS- ST- 490 / 111111 1 , JI'I I'1 1 `♦ S'o i45EMCN7- 466 Pc 4; D.f9, ------------------ , A�n It 00 00, \ , a _DC, Ts , „ , / , , , / b'l _ � 400 LF SF S1 � -- yi 215 L.F. SFI0.25 AC ��` AREA = 2.00 A . \ `♦ ,`I; i' TS , - -- / . 10 TP \ I ` / / _ l p05 pg,1 • o goo. - `v DC s .0p2-����, SF ---� -- �� vv`I �� TS lV V' 1 ..,. 1``\ , �pj ' GEAREA 0.87 AC C= 0.60 r 400 LF. SF 215 L.F. SF/ 0.25 AC DC , vp ----- / -Y ! :_ ------ -- ________________ J-______ ♦ '1' I I 1 ♦ \ice"'-=�6-1 1 �- ____ \ , , . .,. , MATCHLINE - SHEET C-612 �- ��` ��°� � LMATCHLINE - ♦ ♦ ♦ ♦ ---_ �\- \\` _ _ ` _-_---_-- \`_rl \ \ \ (�sxp�Nt,�� O \ \ \ 11 1� 1 1 1 I I I I I I 4ss I I I 470n I I I I I ,innnn 25� /I J4 / ROP. WETSTORAGE �`.`• 1 EL ATION: 180 ` p \ I w SF ^ TP SF f T- I ST-2 \ -0.60 \ s SHEET C-613 HATCH LEGEND MANAGED SLOPES PRESERVED SLOPES PRESERVED SLOPE FIELD -VERIFIED <25%PER SLOPE PERCENTAGE EXHIBIT VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES NO. TITLE KEY SYMBOL 3.01 SAFETY FENCE SAF TEMPORARY STONE CONSTRUCTION ENTRANCE :R�10I : E SILT FENCE E NLOET PROTECTION Ir 3.08 CULVERT INLET PROTECTION Clr 3.18 OUTLET PROTECTION Or 3.31 TEMPORARY SEEDING 3.32 PERMANENT SEEDING PS PS 3.38 TREE AND PRO ECTIONION j E DUST CONTROL DC pC 30 15 7.5 0 30 1 "= 30' F V z I_V Y W W W o z F � u z w0,9w (DKWwU) ju W _ �W o zrCO_n o ~Wax W-1 >Z LUU)C r=nZ) MaQz< zcn�wzF� Ozw<amc z J�� U) C O Z) Q �cnWe zo_� o O U W I- REVISIONS REV DATE COMMENT 1 05/18/22 COUNTY COMMENTS 2 07/01/22 COUNTY COMMENETS Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: RTY DATE: 10/7/2021 CAD I.D.: OBP - 0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES PROPOSED LOCATION: SEMINOLE TRAIL AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 ALBEMARLE COUNTY, VA BOHLERI 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com TH 0,, z V N YA R Jw .p Lic. No. 0402056625 BOA 07/01/202��1�� ���ONAL SHEET TITLE: EROSION AND SEDIMENT CONTROL PLAN PHASE IB SHEET NUMBER C-606 REVISION 2 - 07/01/22 N I IN 1 IN EI , 11 1 � i \` v IIII 1 1 I ib \ \ o0 % \ I \ V\\ I \ , t6' 10,0 `\ 1 \ o ` IP \ 1 \ 1 ` \ 1 \\ � ^A`� C= 0.60 N. 11 \, , IIII V A\ \` 1 ,, ; ; 111 �\I '1 If 1 I1f I, \ ' I \ II In1\ \ \ \ \ \ e 1 • II I \ II nl1 \ \ ` o I, gyp\ \ Il nu \ \ \ \IN\\ ` O� --- IN \ II IIIII I, In IIII II\\ \ \ \ \ \ iln, II IIII III. Io IN \\ IN, If ` \ `\ \ IN IN IN IN IN If ___-' ' / 1 ------------- J = — — -- _ _ _ - / ;% ' �/ ,-------//�-----;` I11'l lt'1 _ ------------ ------- "-' ! = ------- ---- If 1-------------- 1 %THIS SHEET ` ` ` \` If -------------------- )CWP CWP ------------ ATCHLINE SHEET C 401 ____ _______ ' / I I497 \ I ; 495 I \ // / 1 1 ' - .\\ R - - _ - o / / ; ; _ I ___ - EX 8"" SANITARY APPROX LOCAT/ON PER AS-BU/LT \\ 3 PROUIOEO BY ROUDABUSH, GACE & ASSOC, /NC y /TLED ASHLAND _ /NE AND SAN/TA E __ -_ / DATED / / 994 RLY/SED / / 99 - -- -- — ---- ----- I T04YNHOUSES AS BU/LT dYA L RY SETS' _ ST-3A / JD 2B 1 D, D9 , 5v � oo»a= r / / I � ------------ --- --- / — /- AREA =1.9 A 80 ,, - M RE --- , -- O ' N J PROP. WET STORAGE Vj x ELEVATION: 473 1 I 1 1 1 ,I I I ` I I Lp \ 1 1 1 I �/ T_g /r,\' 25 LF. -18" P ' U S R 480 1 / i ' / II W CLEAN WATER P 1y 1 v I AZARD \ MATERIALS s "1 STORAGE / i — IP 472 SF SOAP 4DETERGENTS, SOLVEN AND WASTE WATER OF CONSTRUCTION AREA AMENITIES 'I IP - 1 v VEHICLE FUELING AREA AND SPILL / 1 SF CONTAINMENT I l „ 1 \, I i CE STAGING AREA, RAIN x l A GAUGE, 8 PORTABLE J.. TOILETS I / J p0 4>S 1\\/ SF p, coN ETE WASHOUT AREA q10 r - I l 1 _ s ; It I \\Ji I TP TS N I II ' SF IA II IIII' SF II DO l —_480— Ijl III ---------------- - -- I T I --- - \ 1 1 ROP. WET STORAGE DC ---- ELEVATION: 467 t--- ----- - v� TS I AREA = . 8 — — — A oC �'`. C= 0.60 TS 1 T' 1 I I , p 472 - i l t C= 0.60 IP , iGC58 LF. -12" GMP � -' � - 1, CLEAN WATER PIP � 480 -. \ s ` --�-- - - — - - -- - '— --ems--� r TP o TP 11'\f0 IIII SF-- / Iw HATCH LEGEND AS-11 MH = 47250 /N = 46381 OUT = 46971If EX A5-10 Mf R/M = 46709 MANAGED SLOPES OPRESERVED SLOPES PRESERVED SLOPE FIELD -VERIFIED <25°h PER SLOPE PERCENTAGE EXHIBIT VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES NO. TITLE KEY SYMBOL 3.01 SAFETY FENCE TEMPORARY STONE CONSTRUCTION ENTRANCE STORM DRAIN � \ 3 S 5' /^ w� v SI Z �I W al w w � sl Z H 2' WZ w��w> � �ZW W�>Of ZrC)�w�m m FwQ=�wZ g[ � LYQ ofJ�O o. rnS main, ZQ a OpMaZ~_� pl H Z J � � Of � a Q �Z�aQ a: J F €I O O = w H o REVISIONS REV DATE COMMENT DRAM CHECM 1 05/18/22 COUNTY COMMENTS PC RI 2 07/01/22 COUNTY COMMENETS PC Know what's bBIDW. C311 before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: RTY DATE: 1017/2021 CAD I.D.: OBP - 0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES / E SILT FENCE PROPOSED LOCATION: SEMINOLE TRAIL INLET PROTECTION IP � AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 / ALBEMARLE COUNTY, VA awl 17M WE I I 3.OB CULVERT INLET PROTECTION CAP 3.18 OUTLET PROTECTION OP 3.31 TEMPORARY SEEDING TJ TS 3.32 PERMANENT SEEDINTREE G PJ PS 3.3B AND PROTECTIONION TP TP E DUST CONTROL DC pC 30 15 7.5 0 30 1 "= 30' BOHLER// 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com _.F.ALTH e,. NJ RYAN YAUZ•iER Lic. No. 0402056625 6, 07/01/202 2 SHEET TITLE: EROSION AND SEDIMENT CONTROL PHASE PLAN INS SHEET NUMBER C-607 REVISION 2 - 07/01/22 m LMATCHLINE -SHEET C-611 1 1 \ C= 0.60 �x S - \ \ \ _ 7 \ _ _ ------------------ 1 , ----------------- _ ,.'_ --------- - --- I [U ■ I ---------------------- , ------------------------- 1 ' / 4a7, ' --------------------- -- "- --- - - - ------------ --------- ---- -- _, 488 / -_- /' i' -��-\--- ------ ------------ DC I 1 , I 1 ---------------- �} - , \'1 \' \`, __-- _ I 1 , iI / 1 _ r , ' ------ \ \ —465 DC TS ------------- 47 / I 1 1 1 1 1 470 \ 1 1 ---- 455 PROP. 103' BAFFLE - \ ROP. 36" RISER WITH p 4" TRASH RACK - B' I 1 1 4a7 I I , I ROP. TEMPORARY 21'-- 6Md@`2.5% V � INV. 1 ■ / STM G-20 � 1 7 rP -- w- x-- -x �(R), I A _ - - .. ..0 I \\ `\TP P7---R A. I�jO6/L/K ANC{ 1 APH/A`\ZO[7L�5� . \ D'6.'659 d\\507 \ `TM�• ',0�6c�0�00�dQ-Q2BAQ - \ `\ '`. Z10 R� (rli�SIQE�IYT/ALf'`_, 7` LE AelC RE /OFiI�T/AL \\ I 1 SF I _ I 1 \ \ 1 \ , `- SF \ �`---- ----------------- O 1 \ �- - - _ _ - - �- TP / / -- __ - \\ 4 =1.22 AC - - ---- 0.60 _____________=_ 86 LF. SF --- �' ;' / �\, '`\ \' HATCH LEGEND SF 025 AC -----------' --_ / \ 1 ', ', � MANAGED SLOPES 1 , PRESERVED SLOPES <RESERVED 5%PER SLOPE SLOPE ERCEN AGEFIED EXHIBIT LANGl4 N/F / VIRGINIA UNIFORM CODING SYSTEM --- FRANCE.S BREEDEiV`TgR/CKHEAD ,�NL� ,' ;' j I 619LLARQ'HQIyARO Bf�/CKHEAD FOR EROSION AND SEDIMENT CONTROL PRACTICES FAMILY T,fNST, ET AL I II ThP.• 04600-dQ OOf�29A I I II NO. TITLE KEY SYMBOL ZOMYG.• Rl (A'ESIDE7YT/AL) I j ; U TP 51A'15�E FAM14Y RE -N{r/AL 'll ::3.0 SAFETY FENCE SAF SF TEMPORARY STONE 3.02 CONSTRUCTION ENTRANCE �!C SILT FENCE I 1 W W W O O ', `I \, \ STORM DRAIN Ln IP 0 0 3.07 INLET PROTECTION LO N O cn /90 O ' 1 ' 3.08 CULVERT INLET PROTECTION Clp , I 1 , 1 1 , I I I I , I , I I II OP :31:8] OUTLET PROTECTION I , SYSTEM 1: \\ PROP. t 87,000 CF i UNDERGROUND ' I DETENTION SYSTEM I O WITH ISOLATOR ROW :33:1] TEMPORARY SEEDING TS TS Jul , 1 \ , 1 \ , 1 , PS PERMANENT SEEDING PS \ I I \ \ \ \ I I 1 I I I \ , 1 I TM I G \\ 1" /, O P/PE F0UN0� i SF 0..5' kF RAOE \ \ \ �� • TP \ ✓ \ �. TREE PRESERVATION Tp TP AND PROTECTION E DUST CONTROL DC pC 30 15 7.5 0 30 1 "= 30' \ g w Z EE w s LU 'I)z �W w WZ w(DwOf (DKW WU) jW ZrCD~�O_z g ~wax wz J>ZUWU)0 o rj) 7 m Q mQ Z_ Q ` Op<aZ~O Z J I (/7 0_ (/7 < Q z�aQ J o Q of J F € O U w 6 H 6 U7 o REVISIONS REV DATE COMMENT CHECI 1 05/18/22 COUNTY COMMENTS P( R 2 07/01/22 COUNTY COMMENETS P( LKnowwhays below. before you dig. YS CALL 811 free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: RTY DATE: 10/7/2021 CAD I.D.: OBP - 0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES PROPOSED LOCATION: SEMINOLE TRAIL AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 ALBEMARLE COUNTY, VA BOHLERI 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com _, TH e,. RYAN YAUZ•iER Lic. No. 0402056625 6, 07/01/2022 j SHEET TITLE: EROSION AND SEDIMENT CONTROL PHASE PLAN IB SHEET NUMBER C-608 REVISION 2 - 07/01/22 � I I 1 � I I � I r I 1 , 1 I I I I 1 I 1 I I I I I 1 \ I I i i � J � CURB YINLET i 1\ - - I IP 'IV A=469.28� 1 A PRAZT PAYrg I I ` 1 - I I N B-46923 1 1 I I 1 f I 1 1 - - I -- I - T h , ---- - - - - - - -- `VY\ {'✓�) - - \ -_ ----- --- ------------------- --_-_- _-_ _-_-_ I ;I';' 1 ----- \ - - - --- _ - -7:7_ _-____ _______ _______ ______ - _ I \ \\ ____ I/ - __ _ __ —� ---------------- ------------------------------ - - - - ------------- - - - - - ---- ----- - -- - - I'------------- \ - - - - - - - - - - - - - - - 1 `I I 1 ------------ _ __ __ QOL - SL1 - OOI�O(TL — — SQL —110L — --- 1 ____ _ _ 4"Oq 2655T00 265� 0 D LOD _ --" 58"Od ' ' i / -- - / , 2659f00 2660t00 2661,400 1 "166#00 --- -- OB�LO 26 I �A==- I --- ' LDD OD 3D—LGD�r --' 1 f RIM=471e7_ - , - 1 1 I 11 -/'t "- - ; CLOD A p_ — '-- --; , ------- ------ ' _ - 1.' -- -----' _ ------ -- Ci -------- — — — - --------------------- -----_------- --- �'E/A/ E rR.1/ - US, fi�TE. 25 R/M=47776 `, ^ ��''�- --------------- ------ ----------------- ---- - - LEA tJGh`�, v -WAY ___ - ------------------ — — — — - -- - ___________ ---------------------_-_-_--------- ____--- _-_- ---- ----- __ _____ _________ iN'b�A-47361 �I `n II' Ir _-- _-_--------------- --, ___________ ____ ______ __ _ ------ ------- ---- -- AS ACT PA9CE01P- .FY' _ 111 __ _______ ____ _____ I \ I\ - 1 1 ' _ - aoT aoT abT, d - __- oT aoT ddT ao `< aoT aoT aoT aoT aoT aoT aoT ar ' 0 r /r r� ' aoT k�A ao .001�001.4 - — _ -- _ - - - � IP -- 0 SF SIF 6F SA ! \ l M MGM M M-�— x x x - _ x rtx x \ //-_ — x x - - X 1 A _ �� i \ X SqF -- ___ _ _-- I I _ _ ---_ _may M,' M M _ _ '� / i IP _ "!_ L _ __ _ _ � 485 ^c ' - -485 _ --_ o\ - - _ _ - 480 ��. —__ 485— _`�II /1_ __ -- -- `,G77Ai€,YN2>\'TJ•' / CRATE /NLE7 W W VJ U) W Z J U I I ' I I I I ' f I I 1 ' I 1 ' I 1 ' 1 _ O � C TF4/ ARY CONSTRUCT/ON� a's � /S - _ x ------ --v���.. I \ J 1 \ \ \ \ 1 ---------------------- ----------------------- - — ------ 1 - ------------ / —-----i669f00 -- ---� 2b - - _"-__________ ,. -- --__ ________ E rwa/ - �� Rf�: f9 �- - _______________ - ------------ _ ------ - ------ -- - - -- --- p _ -'1CTPrN(EO\PUBY�:;� ` ! r— "-- _---- _ -________________________ ___-_----_-: �._ / / HATCH LEGEND MANAGED SLOPES PRESERVED SLOPES PRESERVED SLOPE FIELD -VERIFIED <25%PER SLOPE PERCENTAGE EXHIBIT VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES NO. TITLE KEY SYMBOL 3.01 SAFETY FENCE SAF TEMPORARY STONE 'CONSTRUCTION ENTRAN� E SILT FENCE 3.07STORM DRAIN INLET PROTECTION IP 3.08 CULVERT INLET PROTECTION CIP R OUTLET PROTECTION OP E TEMPORARY SEEDING TS TS R PERMANENT SEEDING PS PS R TREE AND PROTECTION ION TP TP R DUST CONTROL DC pC H Uj W rU) V �LU z_ IY W W W o z F S u z WlgW� WC7gU-UO W (A - z u w z _ 0frj W I_ w p:w<= W2 F W Q 2 W e J>of-j WWc ofQJ CD UH mej z U)U) z< Q 00<a--FH <a c af < W U) W a �oZ)W� Q �zcna< o O U W H REVISIONS REV DATE COMMENT 1 05/18/22 COUNTY COMMENTS 2 07/01/22 COUNTY COMMENETS 15 Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: RTY DATE: 10/7/2021 CAD I.D.: OBP - 0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES PROPOSED LOCATION: SEMINOLE TRAIL AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 ALBEMARLE COUNTY, VA BOHLER// 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com _, TH e,. RTAN YAUZ•iER Lic. No. 0402056625 6, 07/01/2022 j SHEET TITLE: EROSION AND SEDIMENT CONTROL PHASE PLAN IB SHEET NUMBER C-609 30 15 7.5 0 30 1"=30' REVISION 2 - 07/01/22 N I N I N SI ' P a / . R of I -- 1 - 1 I v { 1 AI 40044 " , 1 H-10 / ------------- 0 m° 48 e _ 1 _ ------ _ \ - - - - - STY Q p� _ \ --_ --_ _ _ __ ----- -__ --- _--- --- \ ` - _ --- _ - - \ ----- --- -------- i �1 -- \ y .10 _ y - o� 5ti Co\ / ---- \ \ 1 i poi TM / Tit-fP.;'04BB,�j=Q0�0A7,y'd0 00 I I D'!/N/T;D ,ELOPMENT)'I I ` / a m; 1 __ , _ -'V, O _ --- - 1 IX 01 I ' _ /' 1 \ tea. \ 9� 1 - / STM l 1 1 1 : 1 i1 IN / ST4M lil\\\\\ STM Q / C-10 , '\`v`�� o III C-0.83 EX-F1 II II' D-10 11111 - - _ / /// /'- ' _ I 1 C-0.35 �I �I - 9p C=0.75 _ _ F20 STM li �I' -90 STM I �. ' TM XF �:\I 0 475v. ' EX F2 - - - --= C-30 C D-21 --�--'-'-""" USE.•-: •A D-30 558 �' �£1�EL bPMENT� ES/DENT/AL l / A-71 m • PHASE 11 SEQUENCE OF CONSTRUCTION " 1 W ' ' ; ` 1. CONTRACTOR TO INSTALL REMAINING UTILITIES ON SITE INCLUDING PROPOSED WATERLINE, SANITARY MAIN, AND 3 STORM SEWER. Z 8i 2. CONTRACTOR TO INSTALL STORM INLET PROTECTION IMMEDIATELY AFTER PROPOSED STORM INLETS ARE INSTALLED. of a 3. CONTRACTOR TO BEGIN CONSTRUCTION OF THE PROPOSED BUILDINGS. W 81 4. CONTRACTOR TO CONSTRUCT THE REMAINING CURB AND GUTTER FOR THE PARKING AREAS. Z F W I i of 5. CONTRACTOR TO INSTALL THE PROPOSED ISOLATOR ROW. /Z IZ F W ; o ." 6. CONTRACTOR TO BASE PAVE THE PARKING AREAS. W (0 U U of 7. CONTRACTOR TO BEGIN INSTALLATION OF ADS SYSTEM 2. Z } (D vj of � g 7.1. STORMTECH MC-7200 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS W COMPLETED A PRE -CONSTRUCTION MEETING WITH THE INSTALLERS OR PRIOR TO UPSLOPE STABILIZATION. J i Z U LI U O 7.2. STORMTECH MC-7200 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-7200 of CD Ci H CONSTRUCTION GUIDE Z U) IyJ Z 'g / 1 Of O d 0_ 7.3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR EXCAVATOR SITUATED OVER THE CHAMBERS Q Q H w ` \ ` ` N �`� \ ``- ' '1 STORMTECH RECOMMENDS 3 BACKFILL METHODS: U Q U g d &, �J U CC �i 7.3.1. STONESHOOTER LOCATED OFF THE CHAMBER BED. Z U U 7.3.2. BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE. Q a- Z (� Q s `' A / < of �- 7.3.3. BACKFILL FROM OUTSIDE THE EXCAVATION USING ALONG BOOM HOE OR EXCAVATOR. 7.4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS. - -- 7.5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE. O A-70 -_N I: 01` --'' _-- 7.6. MAINTAIN MINIMUM - 9" (230 MM) SPACING BETWEEN THE CHAMBER ROWS. ---- U 6 s %- �.�`�" ; ' '� 7.7. INLET AND OUTLET MANIFOLDS MUST BE INSERTED A MINIMUM OF 12" (300 MM) INTO CHAMBER END CAPS. \ C' 7.8. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE MEETING THE o B 480 \ \\\\\ �� `\�/;','„ /AASHTO M43 DESIGNATION OF #30R #4. sa \/ ` 7.9. STONE SHALL BE BROUGHT UP EVENLY AROUND CHAMBERS SO AS NOT TO DISTORT THE CHAMBER SHAPE. STONEIm o DEPTHS SHOULD NEVER DIFFER BY MORE THAN 12" (300 MM) BETWEEN ADJACENT CHAMBER ROWS. _ �.\ 7.70. STONE MUST BE PLACED ON THE TOP CENTER OF THE CHAMBER TO ANCHOR THE CHAMBERS IN PLACE AND ` \ ` ` PRESERVE ROW SPACING. 7.11. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIAL BEARING \ `\ `�✓D�S`.M{,,(� ; ';f'; ^ ` CAPACITIES TO THE SITE DESIGN ENGINEER REVISIONS 100 __ 7.12. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT' INSERTS DURING CONSTRUCTION FOR ALL INLETS TO \ \\ J` 3978 �G- 38Q'; ``, `I I ;; PROTECT THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF. DRnwx In l REV DATE COMMENT m SEE SHEET C-908 AND C-909 FOR MORE INFORMATION REGARDING THE ADS STORMTECH SYSTEMS. aECIa:D BY PC V\\rRESlOF LJ� \I /' /' 8. CONTRACTOR TO INSTALL ALL PROPOSED SIDEWALKS. 1 05/18/22 COUNTY COMMENTS RR Y SE`, Ou�AbpLY RESNT/4C\ \ 9. CONTRACTOR TO PERMANENTLY SEED ALL DISTURBED AREAS AS SOON AS FINAL GRADE IS MET. 2 07/01/22 COUNTY COMMENETS PCM `\ \ �` \\;\\ 10. CONTRACTOR SHALL KEEP ST-A, ST-2, ST-3A, ST4, AND SBA OPERATING UNTIL SITE IMMEDIATELY ADJACENT AND RTY \ UPHILL F THE SEDIMENT TRAP I PERMANENTLYSTABILIZED. U O S S S IN 11. CONTRACTOR TO BUILD WALLS AND SIX (6) TOWNHOMES IN THE SOUTHEAST CORNER OF THE SITE ONCE VAULT 1 IS FULLY OPERATING AND SITE IMMEDIATELY ADJACENT AND UPHILL IS PERMANENTLY STABILIZED. , 1'' ; (ee ( ', ` ` 1 1 1 A , , ,`, i ; ; I ', 1, \ `, \ NOTE: THE COUNTY E8S INSPECTOR SHALL APPROVE PREVIOUS PHASE PRIOR TO THE NEXT PHASE COMMENCING. vi i,qV iiih` I' %_ Know what's below. C311 before you dig. _ \ - - HATCH LEGEND \\`- ------- ALWAYS CALL 811 $rM It's fast. It's free. It's the law. A-23 a \ /-____` \`/�--- MANAGED SLOPES F s< 466 NOT APPROVED FOR 87 C=0.90 PRESERVED SLOPES CONSTRUCTION a / \ \ PRESERVED SLOPE FIELD -VERIFIED \`\k, <25% PER SLOPE PERCENTAGE EXHIBIT THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. T \ \ , PROJECT No.: V192076 DRAWN BY: MEG / PM A-51 A-31 A-30 <, A-22-- i STM ' � ',,'I,I ,; \'`• `�\'`\'` \\_ i \\'`, � ' 1 1 \ 1 1 - STM - -'LANDS N/F ?ANLES BREEDEN BR/CKHEAD AND c=o.a5 S-20 WIZ-bARO HOWARD BR/CKHEAD FA�1/LY TRUST, -T AL GVB, 129 PG 719 TMP. 04600-00-00-028✓0 ZONING• R1 (RES/DENTIAL) USE- '�FINGLE FAMIL Y RESIDENTIAL STM ' 2\P�ls2_ LOT 17 --- &0C14r '-TEAKWOOD PHASE 2 F- LAKES SOUTH OPMENT� zYJN/NG. PUD j; LO UNIT DE! ELOPMENT (DyT/AL LOT 18 USE• SINGLE FAMILY RE S/ ENT/AL BLOCKI✓-TEAKWOOD PHAS� p F(WF.ST /AKF.S' .SOUTH / VIRGINIA UNIFORM CODING SYSTEM HE BY. RTY DATE: 10/7/2021 FOR EROSION AND SEDIMENT CONTROL PRACTICES CAD I.D.: OBP- 0 NO. TITLE KEY SYMBOL PROJECT: VIRGINIA STORMWATER SAFETY FENCE SAF MANAGEMENT PLAN FOR TEMPORARY STONE 3.02 CONSTRUCTION ENTRANCE lJC CE RST RESIDENCES 3.05 SILT FENCE SF X X PROPOSED LOCATION: SEMINOLE TRAIL 3.07 STORM DRAIN AND ASHWOOD BLVD. INLET PROTECTION IP CHARLOTTESVILLE, VA 22911 ALBEMARLE COUNTY, VA 3.08 CULVERT INLET PROTECTION CIP BOHLER// 3.18 OUTLET PROTECTION �P 3.31 TEMPORARY SEEDING 3.32 PERMANENT SEEDING PJ PS 3.38 TREE AND PRO ECTIONION TP TP 3.39 DUSTCONTROL DC pC 60 30 15 0 60 1 "= 60' 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com _OOML ZTTH e,. R4%N YAIJ ER Lic. No. 0402056625 07/01/2022 SHEET TITLE: OVERALL EROSION AND SEDIMENT :ONTROL PHASE ►1 SHEET NUMBER: C-610 REVISION 2 - 07/01/22 m N I N , N EI i ANN \�,110 '1111', IN 00 \ \IN IN IN -_- SEE INSET SHEET qj40V) IN C-614 Ir __ _TP IN IN IN IN ------- \ IN SF IN, IN \ a , IN ____ , , , i I / , , y� ------- I ��2. l l ( \ ,�" 5� �`2 / ) / TE/0'RORARY`�. -1 ` -- ---- \ - _" III^,2��� '\ \ F N / 9119 sEME'MT :I 1 ` -- \ 46B9 PG 43 \ 1 \I :\- - , , , ' I " - IN IN N / -- - -,' ; - - — , IN 483 ' 80 405 IN IN PS SF 1 ' -10 _ AVX \- V 0 IN -00 IN , I ,00� C=0.85 Ip------------------ J n - �" -- ------ p6. TIP C-0.75 GOS�p10029'0� . �- -1 PS �12/ gE t pR9�. \IN'1 1 DC i ml, a � 1 I I � __ _ _ __ - — J -__---- - --_ -_ _ o---_-- h ------------------ - �� a I. CONNECTIONTO j CEMETERY MATCHLINE - SHEET I Z \` Ph�OP,E'1NS�LTENF� 380'`, \ \IN N,\ \ SHEET HATCH LEGEND MANAGED SLOPES PRESERVED SLOPES PRESERVED SLOPE FIELD -VERIFIED 15%PER SLOPE PERCENTAGE EXHIBIT VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES NO. TITLE KEY SYMBOL 3.01 SAFETY FENCE SAF TEMPORARY STONE CONSTRUCTION ENTRANCE ®' tX_tX�_tX E SILT FENCE 3.07STORM DRAIN INLET PROTECTION IP 3.08 CULVERT INLET PROTECTION CIP L1. OUTLET PROTECTION OP 3.31 TEMPORARY SEEDING TS TS 3.32 PERMANENT SEEDING PS PS 3.38 TREE AND PRO ECTIONION TP TP 3.39 DUST CONTROL DC pC 30 15 7.5 0 30 1 "= 30' F LU z EE W W W U z u W z WF S �0w WC7gU—UO �zWwU ju zrCD—oofo ~ wax w2 -J>zUWcnC r=n��a'In z< zcn�CW zaQa~C 0 J z U) Of z U0 Z) W C Q �U)a< o O U w H Fn REVISIONS REV DATE COMMENT 1 05/18/22 COUNTY COMMENTS 2 07/01/22 COUNTY COMMENETS Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: RTY DATE: 10/7/2021 CAD I.D.: OBP - 0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES PROPOSED LOCATION: SEMINOLE TRAIL AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 ALBEMARLE COUNTY, VA BOHLERI 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com IT OF!/ z V N YA R y .p Lic. No. 0402056625 ���ONAL SHEET TITLE: EROSION AND SEDIMENT CONTROL PLAN PHASE 11 SHEET NUMBER: C-611 REVISION 2 - 07/01/22 IMATCHLINE — SHEET / \ _ \ ' l i ; /l ��,-_i"/i'il/ / ' l i i l l / `•� __ __________ If IIf I i I �� ` Tom♦ �� -_mac<-- 1 If I I RB a��E1 is ♦ 777 IIf I� ---_____ - - - ff ' ` \ ' - g0 P� / FO G \-------------------- - - --- / - -- , , v , \ O i / / 1 mm ��A \ \\ \ __ _ 490 If _el OMMONWYEALT RG/AHA' - 1 , / / 1 ( ` - \\`\2063'' 65 / - _ ----- --- -- ----------i"- '/ S <o\ TMP.• 046If / If ;' \ PUD I If ,_ / `,♦,` `♦,` III ,, o \ � `,\ IU -- _ _---' / / _---- _ _ - / PS__ _"--- Z W IN If If C-20 If If 1, all -- ---- - A C=0.65 i i i ' I ♦ `\ \ 1 1 `� `\ `\'1 O x / / I Is I Is P `' v, '` '1 / TERIAL$ P$ \ ` \ '�� t 1 TORAGE I / / `fir } 1 1 ; 1 '1 1 ii lii`\ `� \ \ \ T \` R IP \ 1\ I I 1 1 1 '1 II II ` '1 I A `V `\ ` \ 'V 1 ' / �i, / Q T , II III \ \ \ ` \ ',/ �V 1 V I P$ I SOAPS, DETERGENTS, SOLVEN \ Il nll \ \ \ \ I`; o n SF \ ulal \ \ t AND WASTE WATER OF ' `♦ '` ON TR CTI NAREAAMENITIES P / i `, iilli iill ` \ \ \ `♦d _ 1�' I IP C-41 - c v I `\g , I � I ' VEHICLE FUELIN / ,II IIII \ \ \ \ \ ,1 1 ,.. _ \ \ \ 1 p 1 1l p NTAIN 1 1 \\ Illlpllll \ \ \ \ `\ \ \ \I 1 I'il,ill�liil Oy ONTAINMENT ♦ . ' IIII \ ♦" .♦ , In `\`\'` C40 •/ STAGING AREA, RAIN I GAUGE.$ PORTABLE J TOILETS II ``\ \\ \\ \` \\ \`\` \ \` ♦ \ - I IP , 1 OQ / I IIII 4j I I I` A A A, A 11 ``\♦ V w I 1 aS ' 1 \ \ ` CONCRE WASHOUT III 1 A�A� AREA 1 0.04 AC Is - C—o.88 RR �I,II„ is 1'lllll I 1\ C 40 � � I II TP I j `,'`1 I I II II pl 0.09 AC If � , , /'" %'- / / /-- -' _-'' '-'' _-' / -1 � ``_- 1,\ is IIII 111'1 1', 11 C-0.83 — J If / ' / SF -'.I 11 11 , i--460 / % , ' I Iil 1� ------ ---- 0.11 AC jl ��_ , -------'l i( I I' III 1 1 — �� __ 4) - ____ — , ,. - \ III ,II ,1 11 II 1 I I I , TP , _____ _ 11 II ? / 11 II I1 I _ '11 IL��� - __________ T f ' �' �' / _ - — _ J l I i it , I ) 1 j1 11 -- -- N is / --- / -- :: - - ,I / I I I 111'''''1 1 1 1 1I 1 -- , , : I F20 , I ' ---- J / , I' ----------- - , -------------- i---------------------- i i I 5 r � � � � P � ' ("� -19 _- --- � --___' _-.-,�--%// i I _aRIYF INLET /� ..�/M �470 , ET i '��yy IP I� - --'� a10 O TM If If If EX-F2TP , , . 1 If If 1 1 \ SF 1 EDESTRIAN 501 CONNECTION TO CEMETERY 00\ A'--- ----- — ----- PS pI I t /T 495 EX-F2 489 \ - — 111♦ C=0.75 \ 489 / ' ' � ' � � � 5 :✓ EX 20 S�lN ESMT EX. 8" SANITARY tl EX MH COCAT/ON PER A5-901CT A 64 ' PROVIDED 91" ABUSH1 CAGE & ASSOC, INC TITLED- ASHCAN WNHOUSES AS 8111LT WATER` /NE AND SANITARY SEWER" i \ /I , I DATED 10/28 94 REY/SED 01/09/1995\ AU PA $ C=0.88 1 W HATCH LEGEND MANAGED SLOPES PRESERVED SLOPES PRESERVED SLOPE FIELD -VERIFIED <25%PER SLOPE PERCENTAGE EXHIBIT AS —II MH = 472.50 1N = 46381 OUT = 46371 EX A5-10 Mf R/Af = 46709 VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES NO. TITLE KEY SYMBOL 3.01 [SAFETY FENCE SAF TEMPORARY STONE CONSTRUCTION ENTRANCE %-11I ® PI_I_I_= 1 STORMDRAIN ffA INLET PROTECTION OUTLET PROTECTION TEMPORARY NG TREE • .. • • U r OAF VA ®��ilm0 TIT 0 Is 1 1 1 1 0 Nz_ LL w w z ou zW0w KWw�jW CD�wuo it ~wax w� -j>zWwcnC � mejQ mQ z < Z U)M W zFH �z< U ZJ��2rn O.O oZ)w� Q �z�a< o OLU REVISIONS REV DATE COMMENT 1 05/18/22 COUNTY COMMENTS 2 07/01/22 COUNTY COMMENETS Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: RTY DATE: 10/7/2021 CAD I.D.: OBP - 0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES PROPOSED LOCATION: SEMINOLE TRAIL AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 ALBEMARLE COUNTY, VA BOHLERI 9100 ARBORETUM PKII SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com TH OFl. Z V N YA R y .p Lic. No. 0402056625 07/01/2022 SHEET TITLE: EROSION AND SEDIMENT CONTROL PHASE PLAN ►► SHEET NUMBER: C-612 REVISION 2 - 07/01/22 PS - - 501 - _500 anti SF _ O '-' " A_62 _/ 5 TP A 63.1 ; 9 C=0.85 p96 p° j J _ 4 p9� -------------- - C=0.65 C=0.85 PS --- STM STM 489 II 1111 , L•JL J' C=0.75 \ 490 --- -- \ ,I 1 -- 489 O / Y; A- 64 N S6M4 C=0.88 Cfl , I 41 I I II I I I i� 1✓�i� yp, �� 41'h i II � 1'1 112 R10 ,. W 1 1 1 1 , 1 / D-30 1 I II — UJID Ali C=0.80 1 C=0.65 1 1 1 I PS � I ', I :�3Ve 1 i• 1, 1 I 1 I I I I�.•1� 1 I PS _ ;S 1 IP STM B-40 I .. �: '•:: `. .f k • Y. "... is -,- T1-..f13� 6" � � ... - e.. .. •��� ' 480 1 477 1 474 - 1 • - 80 1 \ 470 I I 485 _� 1 '\ 11' ` '\ \ li 468 485 1 \ \ I \ I YY� �1 • 01 ;;tom - ,q �.3 1 1 O A-50 7 AC C=0.90 C-611 i\U` A-40 C=0.90 LAND5� N, i�NQ THL�y'AP/,-I/A`,z0r7L�s� 16,�0 w507 '`TM�• '',0�6c�0i00�dQ-02BA(J rli�SIQE/lYT/ALf'�_, \� 11 \ 1 , , I SF I ' ` / Qb \ -I �O / \ / \` ---- \`-- \ '------ \ ---- ------ ----------------------- - --- /-_=-- O``, HATCH LEGEND ----------------- ` MANAGED SLOPES 1 , 1 l ' PRESERVED SLOPES it l % it PRESERVED5%PER SLOPEESLOP PEAGE EXHIBIT r / / r , / LAN/.1 N/F VIRGINIA UNIFORM CODING SYSTEM ""FRANCE.S BREEDEiV`YgR/CKHEAD ,�NL� �' ;' j ', W/LLARQ-HOWARD 6;�ICKHEAD FOR EROSION AND SEDIMENT CONTROL PRACTICES FAMILY 7k- UST, E7 AL I II W.B. 126'IPG 7f9 I NO. TITLE KEY SYMBOL T&O..• 04600—dQ-00—�pg,14 ; ZOIIING. R1 (EET I ;AS//A U Tp SIN6� E FAM14Y R69yDEN{�/AL 1 1 ; ;r 3.01 SAFETY FENCE SAF SF I I I — i i I; i i ; TEMPORARY STONE 3'02 CONSTRUCTION ENTRANCE �!C SILT FENCE II II II II I II II - co CO II II II II II II I W W W II II II II II O (31 O ', '1 ` \ STORM DRAIN II II II II II II O N N 'i 11 ',` \ 3.07 INLET PROTECTION Ip II II II I m rn '1 \ \ ``I B10 j I 308 CULVERT INLET PROTECTION Clp III II I II II I I I 'I II I II I I I' I'I I'I PS II II i II 3.18 OUTLET PROTECTION Op C=0.88 ii it II II II I II II U II II II ``II , I II II II II II II ' O :33:1] TEMPORARY SEEDING TS TS II II II II II II \ � 1 1 II II II II II I / , II II II II II I J I / } II II II II II I II I \ / II II II III IC " ', \ 3.32 PERMANENT SEEDING ps PS II II II II II II q II II II U II II II I, II \ II II ' � I qT5 RD DUMPSTER \ ' \ 1, 45 1 "IRO P/PE FOUNO� SF 0..5' A 04E_fRAOE 0 ✓ \ X X B-20 0.38 AC C=0.88 I I 960 I 1 , ' 1 i 1 I TREE PRESERVATION Tp TP AND PROTECTION E DUST CONTROL 30 15 7.5 0 30 1 "= 30' F z EE W W W 0 Z F D Wz W0,9w 1zWwIW5u Z_rCO�p�o ~ W>13W 2W r=nZ�<Q(Z9< zcn�WZFH �zQQQ~C Z J W U) D_ U O 0 LU Q �Zcno_< o- O O W I— Fn REVISIONS REV DATE COMMENT 1 05/18/22 COUNTY COMMENTS 2 07/01/22 COUNTY COMMENETS Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: RTY DATE: 10/7/2021 CAD I.D.: OBP - 0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES PROPOSED LOCATION: SEMINOLE TRAIL AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 ALBEMARLE COUNTY, VA BOHLERI 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com TH d z V N YA R y .p Lic. No. 0402056625 � ���ONAL SHEET TITLE: EROSION AND SEDIMENT CONTROL PHASE PLAN ►► SHEET NUMBER: C-613 REVISION 2 - 07/01/22 i \---------------- I I j I I I I I ; 1 I I I 1 \ 1 � I III I �I � I I 1, , I '\ \ ------------ _-------------- - - - - - - - - - - - - - - - - - i--- _" _ ____ p_ _ _ __ __ ------------------- '1 \ 1 1 1 I 11 11 1 1 HATCH LEGEND MANAGED SLOPES PRESERVED SLOPES PRESERVED SLOPE FIELD -VERIFIED <25%PER SLOPE PERCENTAGE EXHIBIT 41L - U.S. RTE. OS VIRGINIA UNIFORM CODING SYSTEM FOR EROSION AND SEDIMENT CONTROL PRACTICES NO. I TITLE KEY SYMBOL R SAFETY FENCE SAF TEMPORARY STONE tR CONSTRUCTION ENTRANCE 3.05 SILT FENCE 3.07 STORM DRAIN INLET PROTECTION IP 3.08 CULVERT INLET PROTECTION CIP R OUTLET PROTECTION OP R TEMPORARY SEEDING TS TS R PERMANENT SEEDING PS PS R TREE AND PROTECTION ION TP TP R DUST CONTROL DC pC W W r= V W W mi x O m z W W W Z F S W C7 U Z W H g W O Z W W 2 j W Zr<E0Ez FWa= wz J>ZU Wcn0 zcn�wzFl- 0zaaaE0 Q J 0 0 U) W Z Z as J o a of J F U W H REVISIONS REV ; DATE I COMMENT 1 ; 05/18/22 1 COUNTY COMMENTS I 2 ; 07/01/22 1 COUNTY COMMENETS I 15 Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: RTY DATE: 10/7/2021 CAD I.D.: OBP - 0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES PROPOSED LOCATION: SEMINOLE TRAIL AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 ALBEMARLE COUNTY, VA BOHLERI 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com TH RTAN YAUZ•iER Lic. No. 0402056625 07/01 /2022 SHEET TITLE: EROSION AND SEDIMENT CONTROL PHASE PLAN ►► SHEET NUMBER: C-614 I 30 15 7.5 0 30 N � O N N O o a 1 „= 30' REVISION 2 - 07/01/22 W n EROSION CONTROL MINIMUM STANDARDS MS-1: PERMANENT OR TEMPORARY SOIL STABILIZATION SHALL BE APPLIED TO DENUDED AREAS WITHIN SEVEN (7) DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. TEMPORARY SOIL STABILIZATION SHALL BE APPLIED WITHIN SEVEN (7) DAYS TO DENUDED AREAS THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 30 DAYS. PERMANENT STABILIZATION SHALL BE APPLIED TO AREAS THAT ARE TO BE LEFT DORMANT FOR MORE THAN ONE (1) YEAR. ACTION: SEE EROSION AND SEDIMENT CONTROL NARRATIVE SECTION X. PERMANENT STABILIZATION. MS-2: DURING CONSTRUCTION OF THE PROJECT SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE APPLICANT RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. ACTION: STOCKPILES SHALL COMPLY WITH MS-2 BY PROVIDING SILT FENCING AROUND THE BASE OF THE STOCKPILE. TEMPORARY SOIL STABILIZATION MEASURES NOTED IN MS-1 ABOVE SHALL COMPLY. MS-3: A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE STABILIZED. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. ACTION: SEE EROSION AND SEDIMENT CONTROL NARRATIVE, SECTION X. PERMANENT STABILIZATION. MS-4: SEDIMENT BASINS AND TRAPS PERIMETER DIKES SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES PLACE. ACTION: SEE EROSION AND SEDIMENT CONTROL NARRATIVE, SECTION Vill. SEQUENCE OF CONSTRUCTION, PHASE I. MS-5: STABILIZATION MEASURES SHALL BE APPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES, AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. ACTION: EARTHEN STRUCTURES SHALL BE STABILIZED USING TEMPORARY SOIL STABILIZATION MEASURES AS NOTED IN MS-1 ABOVE SHALL APPLY. MS-6: SEDIMENT TRAPS AND SEDIMENT BASINS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP OR BASIN. a. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. b. SURFACE RUNOFF FROM DISTURBED AREAS THAT IS COMPRISED OF FLOW FROM DRAINAGE AREAS GREATER THAN OR EQUAL TO THREE ACRES SHALL BE CONTROLLED BY A SEDIMENT BASIN. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT BASIN SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA. THE OUTFALL SYSTEM SHALL, AT A MINIMUM, MAINTAIN THE STRUCTURAL INTEGRITY OF THE BASIN DURING A TWENTY-FIVE YEAR STORM OF 24-HOUR DURATION. RUNOFF COEFFICIENTS USED IN RUNOFF CALCULATIONS SHALL CORRESPOND TO A BARE EARTH CONDITION OR THOSE CONDITIONS EXPECTED TO EXIST WHILE THE SEDIMENT BASIN IS UTILIZED. ACTION: THE BASINS AND TRAPS HAVE BEEN DESIGNED TO ACCOUNT FOR THE ENTIRE DRAINAGE AREA CONTRIBUTING TO THEM. THE APPROPRIATE SIZING AND STORM CRITERIA HAVE BEEN USED IN THE DESIGNS. MS-7: CUT AND FILL SLOPES SHALL BE ASSIGNED AND CONSTRUCTED IN A MANNER THAT WILL MINIMIZE EROSION. SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE (1) YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. ACTION: THE CONTRACTOR SHALL STABILIZE THE ULTIMATE CUT AND FILL SLOPES AS FINAL GRADES ARE REACHED. MS-8: CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL, FLUME OR SLOPE DRAIN STRUCTURE. ACTION: CONCENTRATED RUNOFF WILL BE CONTAINED WITH AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL. MS-9: WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION SHALL BE PROVIDED. ACTION: ADEQUATE DRAINAGE AND PROTECTION WILL BE PROVIDED. MS-10: ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FIRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. ACTION: ALL STORM SEWER INLETS WILL BE PROTECTED DURING CONSTRUCTION. MS-11: BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PIPES ARE MADE OPERATIONAL, ADEQUATE OUTLET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. ACTION: ACKNOWLEDGED. MS-12: WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NON -ERODIBLE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN FILL MAY BE USED FOR THESE STRUCTURES IF ARMORED BY NON -ERODIBLE COVER MATERIALS. ACTION: NOT APPLICABLE. MS-13: WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX (6) MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NON -ERODIBLE MATERIALS SHALL BE PROVIDED. ACTION: NOT APPLICABLE. MS-14: ALL APPLICABLE FEDERAL, STATE, AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. ACTION: NOTAPPLICABLE. MS-15: THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. ACTION: NOT APPLICABLE. MS-16: UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA: a. NO MORE THAN 500 LINEAR FEET OF TRENCH SHALL BE OPENED AT ONE TIME. b. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFFSITE PROPERTY. d. MATERIAL USED FOR BACKFILLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABILIZATION. e. RE -STABILIZATION SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. f. APPLICABLE SAFETY REGULATIONS SHALL BE COMPLIED WITH. ACTION: INSTALLATION OF UNDERGROUND UTILITY LINES SHALL COMPLY WITH MS-16. MS-17: WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. THIS PROVISION SHALL APPLY TO INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO LARGER LAND -DISTURBING ACTIVITIES. ACTION: A CONSTRUCTION ENTRANCE WITH WASHRACK HAS BEEN PROVIDED. MS-18: ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. ACTION: SEE EROSION AND SEDIMENT CONTROL NARRATIVE, SECTION VIII. SEQUENCE OF CONSTRUCTION, PHASE It. MS-19: PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SITES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF FOR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE FOLLOWING STANDARDS AND CRITERIA: a. CONCENTRATED STORMWATER RUNOFF LEAVING A DEVELOPMENT SITE SHALL BE DISCHARGED DIRECTLY INTO AN ADEQUATE NATURAL OR MAN-MADE RECEIVING CHANNEL, PIPE OR STORM SEWER SYSTEM. FOR THOSE SITES WHERE RUNOFF IS DISCHARGED INTO A PIPE OR PIPE SYSTEM, DOWNSTREAM STABILITY ANALYSES AT THE OUTFALL OF THE PIPE OR PIPE SYSTEM SHALL BE PERFORMED. b. ADEQUACY OF ALL CHANNELS AND PIPES SHALL BE VERIFIED IN THE FOLLOWING MANNER: (1) THE APPLICANT SHALL DEMONSTRATE THAT THE TOTAL DRAINAGE AREA TO THE POINT OF ANALYSIS WITHIN THE CHANNEL IS ONE HUNDRED TIMES GREATER THAN THE CONTRIBUTING DRAINAGE AREA OF THE PROJECT IN QUESTION; OR (2) (a) NATURAL CHANNELS SHALL BE ANALYZED BY THE USE OF A TWO (2) YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP CHANNEL BANKS NOR CAUSE EROSION OF CHANNEL BED OR BANKS; AND (b) ALL PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS SHALL BE ANALYZED BY THE USE OF A TEN (I 0) YEAR STORM TO VERIFY THAT STORMWATER WILL NOT OVERTOP ITS BANKS BY THE USE OF A TWO (2) YEAR STORM TO DEMONSTRATE THAT STORMWATER WILL NOT CAUSE EROSION OF CHANNEL BED OR BANKS; AND (C) PIPES AND STORM SEWER SYSTEMS SHALL BE ANALYZED BY THE USE OF A TEN (10) YEAR STORM TO VERIFY THAT STORMWATER WILL BE CONTAINED WITHIN THE PIPE OR SYSTEM. C.IF EXISTING NATURAL RECEIVING CHANNELS OR PREVIOUSLY CONSTRUCTED MAN-MADE CHANNELS OR PIPES ARE NOT ADEQUATE, THE APPLICANT SHALL: (1) IMPROVE THE CHANNEL TO A CONDITION WHERE A TEN (10) YEAR STORM WILL NOT OVERTOP THE BANKS AND A TWO (2) YEAR STORM WILL NOT CAUSE EROSION TO THE CHANNEL BED OR BANKS; OR (2) IMPROVE THE PIPE OR PIPE SYSTEM TO A CONDITION WHERE THE TEN (10) YEAR STORM IS CONTAINED WITHIN THE APPURTENANCES;OR 3 DEVELOP A SITE DESIGN THAT WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TWO 2 YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A NATURAL CHANNEL OR WILL NOT CAUSE THE PRE -DEVELOPMENT PEAK RUNOFF RATE FROM A TEN (1 0) YEAR STORM TO INCREASE WHEN RUNOFF OUTFALLS INTO A MAN-MADE CHANNEL; OR (4) PROVIDE A COMBINATION OF CHANNEL IMPROVEMENT, STORMWATER DETENTION OR OTHER MEASURE WHICH IS SATISFACTORY TO THE PLAN -APPROVING AUTHORITY TO PREVENT DOWNSTREAM EROSION. d. THE APPLICANT SHALL PROVIDE EVIDENCE OF PERMISSION TO MAKE THE IMPROVEMENTS. e. ALL HYDROLOGIC ANALYSES SHALL BE CASED ON THE EXISTING WATERSHED CHARACTERISTICS AND THE ULTIMATE DEVELOPMENT OF THE SUBJECT PROJECT. f. IF THE APPLICANT CHOOSES AN OPTION THAT INCLUDES STORMWATER DETENTION HE SHALL OBTAIN APPROVAL FROM THE LOCALITY OF A PLAN FOR MAINTENANCE OF THE DETENTION FACILITIES. THE PLAN SHALL SET FORTH THE MAINTENANCE REQUIREMENTS OF THE FACILITY AND THE PERSON RESPONSIBLE FOR PERFORMING THE MAINTENANCE. g. OUTFALL FROM A DETENTION FACILITY SHALL BE DISCHARGED TO A RECEIVING CHANNEL, AND ENERGY DISSIPATERS SHALL BE PLACED AT THE OUTFALL OF ALL DETENTION FACILITIES AS NECESSARY TO PROVIDE A STABILIZED TRANSITION FROM THE FACILITY TO THE RECEIVING CHANNEL. IT. ALL ON -SITE CHANNELS MUST BE VERIFIED TO BE ADEQUATE. i. INCREASED VOLUMES OF SHEET FLOWS THAT MAY CAUSE EROSION OR SEDIMENTATION ON ADJACENT PROPERTY SHALL BE DIVERTED TO A STABLE OUTLET, ADEQUATE CHANNEL, PIPE OR PIPE SYSTEM, OR TO A DETENTION FACILITY. j. IN APPLYING THESE STORMWATER RUNOFF CRITERIA, INDIVIDUAL LOTS OR PARCELS IN A RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT SHALL NOT BE CONSIDERED TO BE SEPARATE DEVELOPMENT PROJECTS. INSTEAD THE DEVELOPMENT, AS A WHOLE, SHALL BE CONSIDERED TO BE A SINGLE DEVELOPMENT PROJECT. HYDROLOGIC PARAMETERS THAT REFLECT THE ULTIMATE DEVELOPMENT CONDITION SHALL BE USED IN ALL ENGINEERING CALCULATIONS. k. ALL MEASURES USED TO PROTECT PROPERTIES AND WATERWAYS SHALL BE EMPLOYED IN A MANNER WHICH MINIMIZES IMPACTS ON THE PHYSICAL, CHEMICAL AND BIOLOGICAL INTEGRITY OF RIVERS, STREAMS AND OTHER WATERS OF THE STATE. ACTION: IT IS THE OPINION OF THE ENGINEER THAT THE EXISTING STORM SEWER IS ADEQUATE TO CONVEY STORMWATER FOR THIS SITE. I. PROJECT DESCRIPTION: THE SUBJECT SITE IS LOCATED ALONG US ROUTE 29 SEMINOLE TRAIL ROAD AND ASHWOOD BOULEVARD THE TOTAL DISTURBED AREA FOR THE WORK PROPOSED WITH THIS PLAN IS 18.78 ACRES. THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT FOUR (4) APARTMENT BUILDINGS AND SIX (6) STRIPS OF TOWNHOMES, AS WELL AS AMENITY AREAS AND ASSOCIATE PARKING. TO SERVICE THE PROPOSED DEVELOPMENT THIS PLAN WILL ALSO INCLUDE THE INSTALLATION OF SANITARY SEWER, WATER LINES, AND STORM INFRASTRUCTURE THAT WILL SERVE THE PROPOSED PARKING AREAS. THERE WILL ALSO BE TWO (2) UNDERGROUND DETENTION SYSTEMS WITH AN ISOLATOR ROW PRETREATMENT STRUCTURE CONSTRUCTED WITH THIS PLAN. THE TOTAL PROJECT IS ANTICIPATED TO TAKE EIGHTEEN (18) MONTHS TO COMPLETE. II. EXISTING SITE CONDITIONS: THE EXISTING SITE CONSISTS OF ABOUT 4.04 ACRES OF IMPERVIOUS AREA WITH SEVERAL TRAILERS AND GRAVEL LOTS SURROUNDED BY DEVELOPED GRASSED AREA. THE REMAINDER OF THE SITE CONSIST OF MOSTLY WOODED AREAS. EXISTING GRADES ON SITE ARE MOSTLY BETWEEN 0 AND 50 % WITH SEVERAL AREAS OF PRESERVED STEEP SLOPES AS INDICATED ON THE PLANS. THE TWO PROPOSED PARCELS WITHIN THIS PLAN DO NOT CONTAIN AREAS OF THE 100-YEAR FLOODPLAIN, AND NO WETLANDS OR STREAM CORRIDORS ARE IDENTIFIED. III. ADJACENT PROPERTY: THE SITE IS BORDERED TO THE NORTH BY SEMINOLE TRAIL, ROUTE 29 TO THE EAST BY SINGLE FAMILY RESIDENTIAL PARCELS, TO THE SOUTH BY THE FOREST LAKES RESIDENTIAL DEVELOPMENT, AND TO THE WEST BY ASHWOOD BOULEVARD. IV_ OFFSITE AREAS: THE PROPOSED PROJECT HAS BEEN DESIGNED TO MINIMIZE THE IMPORT AND/OR EXPORT OF DIRT FOR THE SITE. HOWEVER, IT IS ANTICIPATED THAT THERE WILL BE EXCESS FILL NEEDED TO BE TRANSPORTED ON SITE DURING CONSTRUCTION.THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING ANY DISTURBANCE OFFSITE AND FOR ANY REQUIRED PLANS AND PERMITS THAT MAY BE REQUIRED. V. SOILS: A STUDY WILL BE PREPARED AT A FUTURE DATE. PER THE USGS WEB SOIL SURVEY, THE SOILS OF THE SUBJECT SITE ARE ENTIRELY HSG B. VI. CRITICALAREAS: THERE ARE SEVERAL EXISTING CRITICAL AREAS ON THE SITE INCLUDING AREAS OF PRESERVED SLOPES. APPROPRIATE MEASURES HAVE BEEN BUT INTO PLACE TO MINIMIZE THE IMPACT TO ALL CRITICAL AREAS THAT ARE IN CLOSE PROXIMITY TO THE PROPOSED PROJECT AREA ASSOCIATED WITH THIS PLAN. VII. EROSION AND SEDIMENT CONTROL MEASURES: UNLESS OTHERWISE NOTED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (VESCH). THE MINIMUM STANDARDS OF VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WAIVED OR APPROVED BY A VARIANCE. SPECIFIC EROSION AND SEDIMENT CONTROL MEASURES UTILIZED IN THIS PROJECT INCLUDE THE FOLLOWING: 1. SAFETY FENCE -3.01 • A PROTECTIVE BARRIER INSTALLED TO PREVENT ACCESS TO AN EROSION CONTROL MEASURE. SAFETY FENCE SHALL BE INSTALLED AROUND THE LIMITS OF DISTURBANCE TO PREVENT PEDESTRIAN TRAFFIC ON SITE 2. TEMPORARY STONE CONSTRUCTION ENTRANCE - 3.02 • A STABILIZED STONE PAN WITH A FILER FABRIC UNDERLINER LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS ON A CONSTRUCTION SITE 3. SILT FENCE - 3.05 • A PROTECTIVE BARRIER TO INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONSTRUCTION OPERATIONS IN ORDER TO PREVENT SEDIMENT FROM LEAVING THE SITE. 4. SUPER SILT FENCE - N/A • REINFORCED SILT FENCE TO INTERCEPT AND DETAIN SMALL AMOUNTS OF SEDIMENT FROM DISTURBED AREAS DURING CONSTRUCTION OPERATIONS IN ORDER TO PRESENT SEDIMENT FROM LEAVING THE SITE. 5. STORM DRAIN INLET PROTECTION - 3.07 • A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR CURB INLET. 6. CULVERT INLET PROTECTION - 3.08 • A SEDIMENT FILTER LOCATED AT THE INLET TO STORM SEWER CULVERTS. 7. TEMPORARY DIVERSION DIKE -3.09 • A TEMPORARY RIDGE OF COMPACTED SOIL CONSTRUCTED AT THE TOP OR BASE OF A SLOPING DISTURBED AREA. 8. TEMPORARY SEDIMENT TRAP - 3.13 • A TEMPORARY PONDING AREA FORMED BY CONSTRUCTING AN EARTHEN EMBANKMENT WITH A STONE OUTLET. 9. TEMPORARY SEDIMENT BASIN - 3.14 • A TEMPORARY BARRIER OR DAM WITH CONTROLLED STORMWATER RELEASE STRUCTURE FORMED BY CONSTRUCTING AN EMBANKMENT OF COMPACTED SOIL ACROSS A DRAINAGEWAY. 10. TEMPORARY SLOPE DRAIN - 3.15 • A FLEXIBLE TUBING OR CONDUIT EXTENDING FROM THE TOP TO THE BOTTOM OF A CUT OR FILL SLOPE. 11. OUTLET PROTECTION - 3.18 • STRUCTURALLY LINED APRONS OR OTHER ACCEPTABLE ENERGY DISSIPATING DEVICES PLACED AT 12. TOPSOILING-3.30 • METHODS OF PRESERVING AND USING THE SURFACE LAYER OF UNDISTURBED SOIL, OFTEN ENRICHED IN ORGANIC MATTER, IN ORDER TO OBTAIN A MORE DESIRABLE PLANTING AND GROWTH MEDIUM. 13. TEMPORARY SEEDING -3.31 • THE ESTABLISHMENT OF A TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS BY SEEDING WITH APPROPRIATE RAPIDLY GROWING ANNUAL PLANTS. 14. PERMANENT SEEDING - 3.32 • THE ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER ON DISTURBED AREAS BY PLANTING SEED. 15. SOIL STABILIZATION BLANKETS & MATTING - 3.36 • THE INSTALLATION OF A PROTECTIVE COVERING (BLANKET) OR A SOIL STABILIZATION MAT ON A PREPARED PLANTING AREA OF A STEEP SLOPE, CHANNEL OR SHORELINE 16. TREE PRESERVATION & PROTECTION - 3.38 • PROTECTION OF DESIRABLE TREES FROM MECHANICAL AND OTHER INJURY DURING LAND DISTURBING AND CONSTRUCTION ACTIVITY. 17. DUST CONTROL - 3.39 • REDUCING SURFACE AND AIR MOVEMENTS OF DUST DURING LAND DISTURBING, DEMOLITION AND CONSTRUCTION ACTIVITIES. ALL MATERIALS INDICATED ON THESE PLANS SHALL CONFORM TO THE SPECIFICATIONS AND INSTALLATION GUIDELINES SET FORTH IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (LATEST EDITION), AND THE DETAILS AND SPECIFICATIONS SHOWN HEREIN. VIII. SEQUENCE OF CONSTRUCTION: PHASE IA SEQUENCE OF CONSTRUCTION 1. OBTAIN ALL REQUIRED PERMITS. 2. ATTEND PRE -CONSTRUCTION MEETING. 3. CONTRACTOR SHALL CONTACT JURISDICTION AT LEAST 1 WEEK PRIOR TO COMMENCING CONSTRUCTION. 4. CONTRACTOR SHALL STAKE AND FLAG LIMITS OF DISTURBANCE. 5. CONTRACTOR TO USE THE EXISTING ENTRANCE ON SITE AS CONSTRUCTION ENTRANCES PRIOR TO GRADING AND INSTALLING THE PROPOSED CONSTRUCTION ENTRANCE ALONG ASHWOOD BLVD. 6. DEMO ALL FEATURES NEEDED TO INSTALL ALL PERIMETER CONTROLS. 7. PERFORM GRADING SHOWN IN PHASE IA TO INSTALL THE CONSTRUCTION ENTRANCES PRIOR TO THE START OF ANY MASS EARTH MOVING ACTIVITIES. 8. CONTRACTOR TO GRADE AND INSTALL ALL SEDIMENT TRAPS AND SEDIMENT BASINS AS SHOWN IN PHASE OF THE EROSION AND SEDIMENT CONTROL PLAN. 9. CONTRACTOR TO PROVIDE TEMPORARY SEEDING AND DUST CONTROL OF ALL DISTURBED AREAS AS NEEDED. NOTE: • INITIAL DISTURBANCE SHALL BE LIMITED TO ONLY THE DISTURBANCE NECESSARY TO INSTALL INITIAL PERIMETER CONTROL AND MEASURES. • CONTRACTOR SHALL NOT COMMENCE PHASE IB OF THE EROSION AND SEDIMENT CONTROL PLAN PRIOR TO THE COUNTY EROSION AND SEDIMENT CONTROL INSPECTORS APPROVAL AND COMPLETION OF ALL PHASE IA CONSTRUCTION. PHASE IB SEQUENCE OF CONSTRUCTION 1. CONTRACTOR TO BEGIN MASS EARTHWORK OPERATION TO REACH PROPOSED PAD ELEVATIONS. AS THE EARTHWORK OPERATION IS BEING PERFORMED CONTRACTOR TO ENSURE THAT ALL TEMPORARY DIVERSIONS ARE MAINTAINED TO KEEP RUNOFF DIRECTED TO THE EROSION AND SEDIMENT CONTROL MEASURES SHOWN IN PHASE IB OF THE EROSION AND SEDIMENT CONTROL PLAN. 2. CONTRACTOR SHALL GRADE AND BUILD THE SO( TOWNHOMES PROPOSED WITHIN SB-1 LAST SO THAT SB-1 CAN REMAIN IN USE UNTIL THE SITE ADJACENT AND UPHILL OF THE SEDIMENT BASIN IS PERMANENTLY STABILIZED. 3. ONCE SITE IS STABILIZED AND STORM DRAINAGE NETWORK IS INSTALLED AND IN USE, CONTRACTOR TO MUSK OUT SEDIMENT BASIN AND OVEREXCAVATE TO UNSATURATED SOIL. CONTRACTOR TO BEGIN WALL CONSTRUCTION TO BRING REST OF SITE UP TO GRADE AND FINALIZE TOWNHOME PADS. 4. CONTRACTOR SHALL KEEP ST-1 ST-2 ST-3A ST-4 AND SBA OPERATING UNTIL SITE IMMEDIATELY ADJACENT AND UPHILL OF THE SEDIMENT TRAPS IS PERMANENTLY STABILIZED. 5. CONTRACTOR TO BEGIN INSTALLATION OF ADS SYSTEM 1. 5.1. STORMTECH MC-7200 CHAMBERS SHALL NOT BE INSTALLED UNTIL THE MANUFACTURER'S REPRESENTATIVE HAS COMPLETED A PRE -CONSTRUCTION MEETING WITH THE INSTALLERS OR PRIOR TO UPSLOPE STABILIZATION. 5.2. STORMTECH MC-7200 CHAMBERS SHALL BE INSTALLED IN ACCORDANCE WITH THE "STORMTECH MC-7200 CONSTRUCTION GUIDE". 5.3. CHAMBERS ARE NOT TO BE BACKFILLED WITH A DOZER OR EXCAVATOR SITUATED OVER THE CHAMBERS STORMTECH RECOMMENDS 3 BACKFILL METHODS: 5.3.1. STONESHOOTER LOCATED OFF THE CHAMBER BED. 5.3.2. BACKFILL AS ROWS ARE BUILT USING AN EXCAVATOR ON THE FOUNDATION STONE OR SUBGRADE. 5.3.3. BACKFILL FROM OUTSIDE THE EXCAVATION USING A LONG BOOM HOE OR EXCAVATOR. 5.4. THE FOUNDATION STONE SHALL BE LEVELED AND COMPACTED PRIOR TO PLACING CHAMBERS. 5.5. JOINTS BETWEEN CHAMBERS SHALL BE PROPERLY SEATED PRIOR TO PLACING STONE. 5.6. MAINTAIN MINIMUM - 9" (230 MM) SPACING BETWEEN THE CHAMBER ROWS. 5.7. INLET AND OUTLET MANIFOLDS MUST BE INSERTED A MINIMUM OF 12" (300 MM) INTO CHAMBER END CAPS. 5.8. EMBEDMENT STONE SURROUNDING CHAMBERS MUST BE A CLEAN, CRUSHED, ANGULAR STONE MEETING THE AASHTO M43 DESIGNATION OF #3 OR #4. 5.9. STONE SHALL BE BROUGHT UP EVENLY AROUND CHAMBERS SO AS NOT TO DISTORT THE CHAMBER SHAPE. STONE DEPTHS SHOULD NEVER DIFFER BY MORE THAN 12" (300 MM) BETWEEN ADJACENT CHAMBER ROWS. 5.10. STONE MUST BE PLACED ON THE TOP CENTER OF THE CHAMBER TO ANCHOR THE CHAMBERS IN PLACE AND PRESERVE ROW SPACING. 5.11. THE CONTRACTOR MUST REPORT ANY DISCREPANCIES WITH CHAMBER FOUNDATION MATERIAL BEARING CAPACITIES TO THE SITE DESIGN ENGINEER 5.12. ADS RECOMMENDS THE USE OF "FLEXSTORM CATCH IT' INSERTS DURING CONSTRUCTION FOR ALL INLETS TO PROTECT THE SUBSURFACE STORMWATER MANAGEMENT SYSTEM FROM CONSTRUCTION SITE RUNOFF SEE SHEET C-908 AND C-909 FOR MORE INFORMATION REGARDING THE ADS STORMTECH SYSTEMS. NOTE: THE COUNTY E&S INSPECTOR SHALL APPROVE PREVIOUS PHASE PRIOR TO THE NEXT PHASE COMMENCING. PHASE II SEQUENCE OF CONSTRUCTION 1. CONTRACTOR TO INSTALL REMAINING UTILITIES ON SITE INCLUDING PROPOSED WATERLINE, SANITARY MAIN, AND STORM SEWER. 2. CONTRACTOR TO INSTALL STORM INLET PROTECTION IMMEDIATELY AFTER PROPOSED STORM INLETS ARE INSTALLED. 3. CONTRACTOR TO BEGIN CONSTRUCTION OF THE PROPOSED BUILDINGS. 4. CONTRACTOR TO CONSTRUCT THE REMAINING CURB AND GUTTER FOR THE PARKING AREAS. 5. CONTRACTOR TO INSTALL THE PROPOSED ISOLATOR ROW. 6. CONTRACTOR TO BASE PAVE THE PARKING AREAS. 7. CONTRACTOR TO BEGIN INSTALLATION OF ADS SYSTEM 2. 7.1. FOLLOW SYSTEM 1 INSTALLATION NOTES IN PHASE IB SEQUENCE ABOVE. SEE SHEET C-908 AND C-909 FOR MORE INFORMATION REGARDING THE ADS STORMTECH SYSTEMS. 8. CONTRACTOR TO INSTALL ALL PROPOSED SIDEWALKS. 9. CONTRACTOR TO PERMANENTLY SEED ALL DISTURBED AREAS AS SOON AS FINAL GRADE IS MET. 10. CONTRACTOR SHALL KEEP ST-1, ST-2, ST-3A, ST4, AND SB-1 OPERATING UNTIL SITE IMMEDIATELY ADJACENT AND UPHILL OF THE SEDIMENT TRAPS IS PERMANENTLY STABILIZED. 11. CONTRACTOR TO BUILD WALLS AND SIX (6) TOWNHOMES IN THE SOUTHEAST CORNER OF THE SITE ONCE SYSTEM 1 IS FULLY OPERATING AND SITE IMMEDIATELY ADJACENT AND UPHILL IS PERMANENTLY STABILIZED. NOTE: THE COUNTY E&S INSPECTOR SHALL APPROVE PREVIOUS PHASE PRIOR TO THE NEXT PHASE COMMENCING IX. MAINTENANCE PROGRAM: 1. SAFETY FENCE - 3.01 SAFETY FENCE SHALL BE CHECKED REGULARLY FOR WEATHER -RELATED OR OTHER DAMAGE. ANY NECESSARY REPAIRS MUST BE MADE IMMEDIATELY. CARE SHOULD BE TAKEN TO SECURE ALL ACCESS POINTS (GATES) AT THE END OF EACH WORKING DAY. ALL LOCKING DEVICES MUST BE REPAIRED OR REPLACED AS NECESSARY. 2. TEMPORARY STONE CONSTRUCTION ENTRANCE - 3.02 THE ENTRANCE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS -OF -WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH ADDITIONAL STONE OR THE WASHING AND REWORKING OF EXISTING STONE AS CONDITIONS DEMAND AND REPAIR AND/OR CLEANOUT OF ANY STRUCTURES USED TO TRAP SEDIMENT. ALL MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY. THE USE OF WATER TRUCKS TO REMOVE MATERIAL DROPPED, WASHED, OR TRACKED ONTO ROADWAYS WILL NOT BE PERMITTED UNDER ANY CIRCUMSTANCES. 5. SILT FENCE - 3.05 SILT FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. . CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCES RESULTING FROM END RUNS AND UNDERCUTTING. . SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY- . SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN THE LEVEL OF DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIERS. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED. 6. SUPER SILT FENCE - N/A SILT FENCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. . CLOSE ATTENTION SHALL BE PAID TO THE REPAIR OF DAMAGED SILT FENCES RESULTING FROM END RUNS AND UNDERCUTTING. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC SHALL BE REPLACED PROMPTLY. SEDIMENT DEPOSITS SHOULD BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED WHEN THE LEVEL OF DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIERS. . ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER REQUIRED SHALL BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED. 8. STORM DRAIN INLET PROTECTION - 3.07 . THE STRUCTURE SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NEEDED. SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF THE DESIGN DEPTH OF THE TRAP. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE. . STRUCTURES SHALL BE REMOVED AND THE AREA STABILIZED WHEN THE REMAINING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. 9. CULVERT INLET PROTECTION - 3.08 . THE STRUCTURE SHALL BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NEEDED. . AGGREGATE SHALL BE REPLACED OR CLEANED WHEN INSPECTION REVEALS THAT CLOGGED VOIDS ARE CAUSING PONDING PROBLEMS WHICH INTERFERE WITH ON -SITE CONSTRUCTION. SEDIMENT SHALL BE REMOVED AND THE IMPOUNDMENT RESTORED TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH. REMOVED SEDIMENT SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE AND CAUSE SEDIMENTATION PROBLEMS. . TEMPORARY STRUCTURES SHALL BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED. 10. TEMPORARY DIVERSION DIKE -3.09 • THE MEASURE SHALL BE INSPECTED AFTER EVERY STORM AND REPAIRS MADE TO THE DIKE, FLOW CHANNEL, OUTLET OR SEDIMENT TRAPPING FACILITY, AS NECESSARY. ONCE EVERY TWO WEEKS, WHETHER A STORM EVENT HAS OCCURRED OR NOT, THE MEASURE SHALL BE INSPECTED AND REPAIRS MADE IF NEEDED. DAMAGES CAUSED BY CONSTRUCTION TRAFFIC OR OTHER ACTIVITY MUST BE REPAIRED BEFORE THE END OF EACH WORKING DAY. 14. TEMPORARY SEDIMENT TRAP - 3.13 • SEDIMENT SHALL BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE HALF THE DESIGN VOLUME OF THE WET STORAGE. SEDIMENT REMOVAL FROM THE BASIN SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE AND CAUSE SEDIMENTATION PROBLEMS. • FILTER STONE SHALL BE REGULARLY CHECKED TO ENSURE THAT FILTRATION PERFORMANCE IS MAINTAINED. STONE CHOKED WITH SEDIMENT SHALL BE REMOVED AND CLEANED OR REPLACED. • THE STRUCTURE SHOULD BE CHECKED REGULARLY TO ENSURE THAT IT IS STRUCTURALLY SOUND AND HAS NOT BEEN DAMAGED BY EROSION OR CONSTRUCTION EQUIPMENT. THE HEIGHT OF THE STONE OUTLET SHOULD BE CHECKED TO ENSURE THAT ITS CENTER IS AT LEAST 1 FOOT BELOW THE TOP OF THE EMBANKMENT. 15. TEMPORARY SEDIMENT BASIN - 3.14 • THE BASIN EMBANKMENT SHOULD BE CHECKED REGULARLY TO ENSURE THAT IT IS STRUCTURALLY SOUNDS AND HAS NOT BEEN DAMAGED BY EROSION OR CONSTRUCTION EQUIPMENT. • THE EMERGENCY SPILLWAY SHOULD BE CHECKED REGULARLY TO ENSURE THAT ITS LINING IS WELL ESTABLISHED AND EROSION -RESISTANT. • THE BASIN SHOULD BE CHECKED AFTER EACH RUNOFF -PRODUCING RAINFALL FOR SEDIMENT CLEANOUT. WHEN THE SEDIMENT REACHES THE CLEAN -OUT LEVEL, IT SHALL BE REMOVED AND PROPERLY DISPOSED OF. 16. TEMPORARY SLOPE DRAIN - 3.15 THE SLOPE DRAIN STRUCTURE SHALL BE INSPECTED WEEKLY AND AFTER EVERY STORM, AND REPAIRS MADE IF NECESSARY. THE CONTRACTOR SHOULD AVOID THE PLACEMENT OF ANY MATERIAL ON AND PREVENT CONSTRUCTION TRAFFIC ACROSS THE SLOPE DRAIN. 20. ROCK CHECK DAMS- 3.20 • CHECK DAMS SHOULD BE CHECKED FOR SEDIMENT ACCUMULATION AFTER EACH RUNOFF -PRODUCING STORM EVENT. SEDIMENT SHOULD BE REMOVED WHEN IT REACHES ONE HALF OF THE ORIGINAL HEIGHT OF THE MEASURE. • REGULAR INSPECTIONS SHOULD BE MADE TO INSURE THAT THE CENTER OF THE DAM IS LOWER THAN THE EDGES. EROSION CAUSED BY HIGH FLOWS AROUND THE EDGES OF THE DAM SHOULD BE CORRECTED IMMEDIATELY. 31. SOIL STABILIZATION BLANKETS & MATTING - 3.36 . ALL SOIL STABILIZATION BLANKETS AND MATTING SHOULD BE INSPECTED PERIODICALLY FOLLOWING INSTALLATION, PARTICULARLY AFTER RAINSTORMS TO CHECK FOR EROSION AND UNDERMINING. ANY DISLOCATION OR FAILURE SHOULD BE REPAIRED IMMEDIATELY. IF WASHOUTS OR BREAKAGE OCCURS, REINSTALL THE MATERIAL AFTER REPAIRING DAMAGE TO THE SLOPE OR DITCH. CONTINUE TO MONITOR THESE AREAS UNTIL WHICH TIME THEY BECOME PERMANENTLY STABILIZED; AT THAT TIME AN ANNUAL INSPECTION SHOULD BE ADEQUATE. X. STABILIZATION: TEMPORARY SEEDING WILL BE PROVIDED IN ACCORDANCE TO VESCH REQUIREMENTS THROUGHOUT CONSTRUCTION. FINAL SEEDING AND SODDING INSTALLATION PER THE SPECIFICATIONS PROVIDED ON SHEET C-617 WILL OCCUR ONCE THE SITE HAS BEEN FINAL GRADED AND THE IMPROVEMENTS ARE COMPLETE. XI. STORMWATER RUNOFF CONSIDERATIONS: REFER TO SHEETS C-901 TO C-908 FOR STORMWATER RUNOFF CONSIDERATIONS. XII. CALCULATIONS: REFER TO SHEETS C-901 TO C-909 FOR STORMWATER RUNOFF CONSIDERATIONS. XIII. OTHER IMPORTANT NOTES: 1. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLANS SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 2. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NOT SHOWN HEREON THAT ARE DEEMED NECESSARY BY THE APPROVING AUTHORITY AND/OR SITE INSPECTOR. 4. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING AND GRADING. 5. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING MUD FROM TRUCKS AND/OR OTHER EQUIPMENT PRIOR TO ENTERING THE PUBLIC RIGHT-OF-WAY. WATER TRUCKS SHALL BE UTILIZED IN THE EVENT THAT A PUBLIC WATER SOURCE IS NOT AVAILABLE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAR THE STREETS AND TAKE WHATEVER MEASURES NECESSARY TO ENSURE THAT THE STREETS ARE MAINTAINED IN A CLEAN AND DUST -FREE CONDITION AT ALL TIMES. 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO PERFORM THE WORK IN SUCH A MANNER AS TO PREVENT THE WASHING OF ANY TOPSOIL OR DEBRIS ONTO ADJACENT PROPERTIES. 7. THE CONTRACTOR SHALL ENSURE THAT ALL DEWATERING OPERATIONS ON THE SITE PASS THROUGH AN APPROVED EROSION AND SEDIMENT CONTROL DEVICE SUCH AS SILT FENCING, SEDIMENT TRAPS, OR SEDIMENT FILTER BAGS. EROSION AND SEDIMENT CONTROL NOTES 1. UNLESS OTHERWISE NOTED, ALL VEGETATIVE AND EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK (LATEST EDITION). 2. FOR ADDITIONAL DETAILS AND SPECIFICATIONS NOT SHOWN HEREON, REFER TO THE LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 3. ALL EROSION CONTROL MEASURES SHALL BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING AND GRADING. 4. ALL AREAS TO BE PAVED MAYBE STABILIZED BY INSTALLATION OF BASE AND SUBBASE MATERIALS INSTEAD OF TEMPORARY VEGETATION COVER. 5. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON -SITE AT ALL TIMES. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES AS NECESSARY TO PREVENT POSSIBLE FUTURE OFF -SITE CONTAMINATION. 7. THE CONTRACTOR SHALL INSPECT ALL EROSION AND SEDIMENT CONTROL DEVICES DAILY. ANY DAMAGED CONTROLS SHALL BE REPAIRED OR REPLACED BY THE CLOSE OF EACH WORKING DAY. 8. THE CONTRACTOR MUST NOTIFY THE LANDSCAPING SUPERVISOR PRIOR TO THE INSTALLATION OF ANY TREE PROTECTION OR PLANT MATERIAL. 9. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN THOSE INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 10. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING MUD FROM TRUCKS AND/OR OTHER EQUIPMENT PRIOR TO ENTERING THE PUBLIC RIGHT-OF-WAY. IT IS THE CONTRACTORS RESPONSIBILITY TO TAKE MEASURES NECESSARY TO ENSURE THAT ADJACENT STREETS ARE MAINTAINED IN A CLEAN AND DUST -FREE CONDITION AT ALL TIMES. 11.THE CONTRACTOR SHALL ENSURE THAT ALL DEWATERING OPERATIONS ON THE SITE PASS THROUGH AN APPROVED EROSION AND SEDIMENT CONTROL DEVICE SUCH AS SILT FENCING, SEDIMENT TRAPS, OR SEDIMENT FILTER BAGS. 12. THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING SITE WORK IN SUCH A MANNER AS TO PREVENT THE WASHING OF ANY TOPSOIL OR DEBRIS ONTO THE ADJACENT PROPERTIES. 13. ALL STORM AND SANITARY SEWER LINES, NOT IN STREETS, SHALL BE SEEDED AND MULCHED WITHIN 14 DAYS AFTER BACKFILL. 14. ELECTRICAL POWER, GAS SUPPLY, AND TELEPHONE TRENCHES SHALL BE COMPACTED, SEEDED, AND MULCHED WITHIN 14 DAYS AFTER BACKFILL. 15. AT THE COMPLETION OF CONSTRUCTION AND PRIOR TO ANY BOND RELEASE, ALL TEMPORARY SEDIMENT CONTROLS SHALL BE REMOVED AND ALL DENUDED AREAS STABILIZED. 16. WORK WITHIN THE RIGHT-OF-WAY SHALL BE PERFORMED IN A MANNER SO AS TO LIMIT THE DISTURBANCE TO PUBLIC TRAFFIC INCLUDING PEDESTRIAN AND BICYCLE ACCESS. ALBEMARLE COUNTY GENERAL CONSTRUCTION NOTES FOR EROSION AND SEDIMENT CONTROL PLANS: 1. THE PLAN APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. 2. ALL EROSION AND SEDIMENT CONTROL MEASURES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. 3. ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING. 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO, OFF -SITE BORROW OR WASTE AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED. 8. DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. 9. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES PERIODICALLY AND AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. 10. ALL FILL MATERIAL TO BE TAKEN FROM AN APPROVED DESIGNATED BORROW AREA. 11.ALL WASTE MATERIALS SHALL BE TAKEN TO AN APPROVED WASTE AREA. EARTH FILL SHALL BE INERT MATERIALS ONLY, FREE OF ROOTS, STUMPS, WOOD, RUBBISH, AND OTHER DEBRIS. 12. BORROW OR WASTE AREAS ARE TO BE RECLAIMED WITHIN 7 DAYS OF COMPLETION PER ZONING ORDINANCE SECTION 5.1.28. 13. ALL INERT MATERIALS SHALL BE TRANSPORTED IN COMPLIANCE WITH SECTION 13-301 OF THE CODE OF ALBEMARLE. 14.BORROW, FILL OR WASTE ACTIVITY INVOLVING INDUSTRIAL -TYPE POWER EQUIPMENT SHALL BE LIMITED TO THE HOURS OF 7:OOAM TO 9:OOPM. 15. BORROW, FILL OR WASTE ACTIVITY SHALL BE CONDUCTED IN A SAFE MANNER THAN MAINTAINS LATERAL SUPPORT, OR ORDER TO MINIMIZE ANY HAZARD TO PERSONS, PHYSICAL DAMAGE TO ADJACENT LAND AND IMPROVEMENTS, AND DAMAGE TO ANY PUBLIC STREET BECAUSE OF SLIDES, SINKING, OR COLLAPSE. 16.THE DEVELOPER SHALL RESERVE THE RIGHT TO INSTALL, MAINTAIN, REMOVE OR CONVERT TO PERMANENT STORMWATER MANAGEMENT FACILITIES WHERE APPLICABLE ALL EROSION CONTROL MEASURES REQUIRED BY THIS PLAN REGARDLESS OF THE SALE OF ANY LOT, UNIT, BUILDING OR OTHER PORTION OF THE PROPERTY. 17.TEMPORARY STABILIZATION SHALL BE TEMPORARY SEEDING AND MULCHING. SEEDING IS TO BE AT 75 LBS/ACRE, AND IN THE MONTHS OF SEPTEMBER TO FEBRUARY TO CONSIST A 50/50 MIX OF ANNUAL RYEGRASS AND CEREAL WINTER RYE, OR IN MARCH AND APRIL TO CONSIST OF ANNUAL RYE, OR MAY THROUGH AUGUST TO CONSIST OF GERMAN MILLET. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 18.PERMANENT STABILIZATION SHALL BE LIME AND FERTILIZER, PERMANENT SEEDING, AND MULCH. AGRICULTURAL GRADE LIMESTONE SHALL BE APPLIED AT 1000LBS/ACRE AND CONSIST OF 10-20-10 NUTRIENT MIX. PERMANENT SEEDING SHALL BE APPLIED AT 180LBS/ACRE AND CONSIST OF 95% KENTUCKY 31 OR TALL FESCUE AND 0-5% PERENNIAL RYEGRASS OR KENTUCKY BLUEGRASS. STRAW MULCH IS TO BE APPLIED AT 80LBS/100SF. ALTERNATIVES ARE SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 19.MAINTENANCE: ALL MEASURES ARE TO BE INSPECTED WEEKLY AND AFTER EACH RAINFALL. ANY DAMAGE OR CLOGGING TO STRUCTURAL MEASURES IS TO BE REPAIRED IMMEDIATELY. SILT TRAPS ARE TO BE CLEANED WHEN 50% OF THE WET STORAGE VOLUME IS FILLED WITH SEDIMENT. ALL SEEDED AREAS ARE TO BE RESEEDED WHEN NECESSARY TO ACHIEVE A GOOD STAND OF GRASS. SILT FENCE AND DIVERSION DYKES WHICH ARE COLLECTING SEDIMENT TO HALF THEIR HEIGHT MUST BE CLEANED AND REPAIRED IMMEDIATELY. 20.ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE REMOVED WITHIN 30 DAYS OF FINAL SITE STABILIZATION, WHEN MEASURES ARE NO LONGER NEEDED, SUBJECT TO APPROVAL BY THE COUNTY EROSION CONTROL INSPECTOR. 21.THIS PLAN SHALL BE VOID IF THE OWNER DOES NOT OBTAIN A PERMIT WITHIN 1 YEAR OF THE DATE OF APPROVAL. (WATER PROTECTION ORDINANCE SECTION 17-204G.) 22-PERMANENT VEGETATION SHALL BE INSTALLED ON ALL DENUDED AREAS WITHIN NINE (9) MONTHS AFTER THE DATE THE LAND DISTURBING ACTIVITY COMMENCED. (WATER PROTECTION ORDINANCE SECTION 17-207B.) W mej x O Im 0 Z EE W w w rn Z F of W C7 Z � Z V7 U Z W - W H �ZL�jJWfn jW z�CJ~p�U Fwa= wz W D>ZU tn0 z 7 M a Q z a (nMLLI ZH~ °zaaa~o H 0 a c9 U J (n a Of It Z U) W Z 5;a J Ir U W H fn REVISIONS REV I DATE I COMMENT cimmoeY 1 05/18/22 COUNTY COMMENTS PCM RTY 2 1 07/01/22 1 COUNTY COMMENETS PCM • Know what's below. Call before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: RTf DATE: 10/7/2021 CAD I.D.: ODS-O PROJECT VIRGINIA STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES PROPOSED LOCATION: SEMINOLE TRAIL AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 ALBEMARLE COUNTY, VA BOHLER// 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com TH RYANYAUGER Lic. No. 0402056625 07/01 /2022 SHEET TITLE: EROSION NOTES SHEET NUMBER: C-615 REVISION 2 - 07/01/22 0 SAFETY FENCE 3PL .1T1 PERSPECTIVE VIEW M 4 v� 3-° %1 Ij WIRE FABRIC 'J LINE POST I'I BRACING 1= 10' GROUND LINE CONCRETE FOOTING PERSPECTIVE VIEW PLASTIC FENCE SOURCE: CONWED PLASTICS, VDOT ROAD AND BRIDGE BLOCK1 GRAVEL I'1' INLET SEDIMENT CONCRETEWIRE SCREEN BLOCK MEN GRAVEL FILTER WIRE SCREEN i rJr4j . 1 N4w�� i sr '���a��..-.•sir � �, ��,� .,. •�r�'r1;T�jt��trs %��vr��jrr�%''' FILTERED WATER OVERFLOW RUNOFF WATER WITH SEDIMENT ROP INLET WTH GATE SEDIMENT SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY FLOWS ARE EXPECTED AND WHERE AN OVERFLOW CAPACITY IS NECESSARY TO PREVENT EXCESSIVE PONDING AROUND THE STRUCTURE. * GRAVEL SHALL BE VDOT 13, 1357 OR 15 COARSE AGGREGATE. SOURCE: VA DSWC PIPE OUTLET CONDITIONS PLATE 318-1 A A ado de PIPE OUTLET TO FLAT AREA WITH NO DEFINED CHANNEL PLAN VIEW La - d SECTION A -A FILTER CLOTF KEY IN 6"-9"; RECOMMENDED FOR ENTIRE PERIMETER A A 3d c(MIN.) da �— PIPE OUTLET TO WELL DEFINED CHANNEL PLAN VIEW 1 La d SECTION A -A FILTER CLOTH KEY IN CIA"; RECOMMENDED NOTES: FOR ENTIRE PERIMETER 1. APRON UNING MAY BE RIPRAP, GROUTED RIPRAP, GABION BASKET, OR CONCRETE. 2. to IS THE LENGTH OF THE RIPRAP APRON AS CALCULATED USING PLATES 3.18-3 AND 118-4. 3. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER, BUT NOT LESS THAN 6 INCHES. SOURCE: VA. DSWC PERSPECTIVE VIEW METAL FENCE VA DSWC STONE CONSTRUCTION ENTRANCE PLATE 2-1 75' MIN, EXISTING Al 3 PAVEMENT 1 5:1 FILTER CLOTH A MOUNTABLE BERM 6" MIN. (OPTIONAL) SIDE ELEVATION EXISTI G GROUND 5 MIN 10' MIN. ®r-WASeHRACK 12' MIN EXISTING PAVEMENT MIN. VDOT 11 COURSE POSITIVE DRAINAGE 10 AGGREGATE Ea TO SEDIMENT TRAPPING DEVICE ' MUST EXTEND FULL WIDTH OF INGRESS AND EGRESS PLAN VIEW OPERATION 2' MIN. 043� MIN. MIN. FILTER CLO H SECTION A -A REINFORCED CONCRETE M, SPACE SECTION B-B SOURCE: ADAPTED FROM 1983 MARYLAND STANDARDS FOR SOIL EROSION AND SEDIMENT CONTR04 AND VA. DSWC GRAVEL CURB INLET SEDIMENT 3 PLATE FILTER GRAVEL FILTER 14^ RUNOFF WATER WIRE MESH WITH SEDIMENT � IY/ FILTERED WATER B I � — e •a a a— _ SEDIMENT CONCRETE GUTTER IHI I12a `PCURB INLET SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE PONDING IN FRONT OF THE STRUCTURE IS NOT LIKELY TO CAUSE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. * GRAVEL SHALL BE VDOT 13, 1357 OR 5 COARSE AGGREGATE. SOURCE: VA DSWC FENCING AND ARMORING PLAE 338T2 DRIP SNOW BOAR[ METHODS OF TREE FENCING NCE TRIANGULAR BOARD FENCE CORRECT TRUNK ARMORING SOURCE: VA DSWC CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) 3 STE2 I. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. 6'WY. IIII new It — III 3. STAPLE FILTER MATERIAL 4. BACKFILL AND COMPACT TO STAKES AND EXTEND THE EXCAVATED SOIL. y. IT INTO THE TRENCH. IIII• SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) SOURCE: ADAPTED FROM INSTALLATION OF STRAW AND FABRIC FILTER BARRIERS FOR SEDIMENT CONTROL,VA, DSWC, SHERWOOD AND WYANT BLOCK & GRAVEL CURB INLET 3 o T $ SEDIMENT FILTER - CURB INLET O 1 � WIRE SCREEN CONCRETE BLOCK GRAVEL FILTER 7 RUNOFF WATER WITH OVERFLOW FILTERED WATER SEDIMEN F - f7lfsa SEDIMENT - y WIRE SCRREEN ' �• 2° X 4' WOOD STUD CURB INLET SPECIAL APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE AT CURB INLETS WHERE AN OVERFLOW CAPABILITY IS NECESSARY TO PREVENT EXCESSIVE PENDING IN FRONT OF THE STRUCTURE. Is GRAVEL SHALL BE VDOT 13, 1357 OR 15 COARSE AGGREGATE SOURCE: VA DSWC TABLE 331-B ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS "QUICK REFERENCE FOR ALL REGIONS" Rate Planting Dates Species I s. a re Sept. 1 - Feb. 15 50/50 Mix of Annual Ryegrass (Lolium multi-florum) & 50- 100 Cereal (Winter) Rye (Secale cereale) Feb. 16 - Apr. 30 Annual Ryegrass 60 - 100 (L.olium multi-florum) May 1 - Aug 31 German Millet 50 Source: Va. DSWC (Setaria italics) SILT FENCE DROP INLET 3 p TE1 PROTECTION 2 X 4° WOOD FRAME DROP INLET T/ WITH GRATE 1.5, MAX. � . � _—lUl FRAME CL �. 3' MIN. GATHER EXCESS U �^- AT CORNERS V PERSPECTIVE VIEWS STAKE FABRIC ��1' MIN. A -II - I ELEVATION OF STAKE AND FABRIC ORIENTATION DETAIL A SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION 15 APPLICABLE WHERE THE INLET DRAINS A RELATIVELY FLAT AREA (SLOPE NO GREATER THAN 5%) WHERE THE INLET SHEET OR OVERLAND FLOWS (NOT EXCEEDING 1 C.F.S.) ARE TYPICAL. THE METHOD SHALL NOT APPLY TO INLETS RECEIVING CONCENTRATED FLOWS, SUCH AS IN STREET OR HIGHWAY MEDIANS. SOURCE: N,C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, 1988 SILT FENCE CULVERT INLET PLTE 308-1 PROTECTION �NDwaLL TOE OF FILL _EF '�ULVERT IR TOE OF FILL SILT FENC o DISTANCE IS 6' MINIMUM IF FLOW IS L FLOW TOWARD EMBANKMENT *OPTIONAL STONE COMBINATION FLOW -��Zgk 2.5' - VDOT 13, 1357, 15, 156 OR 157/ CUSS I RIPRAP COARSE AGGREGATE TO REPLACE SILT FENCE IN "HORSESHOE' WHEN HIGH VELOCITY OF FLOW IS EXPECTED SOURCE: ADAPTED from VDOT Standard Sheets and Va. DSWC 1992 339 STD & SPEC 3.39 DUST CONTROL pc Definition Reducing surface and air movement of dust during land disturbing, demolition and construction activities. To prevent surface and air movement of dust from exposed soil surfaces and reduce the presence of airborne substances which may present health hazards, traffic safety problems or harm animal or plant life. Conditions Where Practice Applies In areas subject to surface and air movement of dust where on -site and off -site damage is likely to occur if preventive measures are not taken. BI - 414 GRAVEL AND WIRE MESH DROP 30 T2 INLET SEDIMENT FILTER FILTERED WATER SPECIFIC APPLICATION THIS METHOD OF INLET PROTECTION IS APPLICABLE WHERE HEAVY CONCENTRATED FLOWS ARE EXPECTED BUT NOT WHERE PONDING AROUND THE STRUCTURE MIGHT CAUSE EXCESSIVE INCONVENIENCE OR DAMAGE TO ADJACENT STRUCTURES AND UNPROTECTED AREAS. * GRAVEL SHALL BE VDOT 13, 1357 OR 15 COARSE AGGREGATE. SOURCE: VA DSWC TEMPORARY DIVERSION DIKE SOURCE: VA. DSWC Comnacted Soil TABLE 3.31-A LIMING REQUIREMENTS FOR TEMPORARY SITES Recommended Application pH Test of Agricultural Limestone below 4.2 3 tons per acre 4.2 to 5.2 2 tons per acre 5.2 to 6 1 ton per acre TABLE 3.31-C TEMPORARY SEEDING PLANT MATERIALS, SEEDING RATES, AND DATES PLATE 3 09-1 SEEDING RATE NORTH' SOUTH' PLANT SPECIES 3n sn 8n5 7JI5 511 9/1 CHARACTERISTICS Alto 1000 ftr to W to to to ID 4/30 8/15 1111 4130 9/1 11115 OATS 3 bu. (up to IOD lbs., 2 lbs. X - - X - - Use sprang varieties (e.g., Noble). (Averu sativ) not less than 50 lbs.) RYE• 2 bu. (up to 110 lbs., 2.5 1hs. X - X X - X Use for late fall seedlings, winter (Secide cenale) not less than 50 lbs.) cover. Tolerates cold and low eariture. GERMAN MILLET SO lbs. approx. 1 Ib. - X - - X - Warm -season annual. Dies al first Setan Judica frost. May be added to summer mixes. ANNUAL RYEGRASS° 60 the. I'h lbs. X - X X - X May be added in mates. Will (Wlium multi-EOmmi mow out of most stands. WEEPING 15 lbs. 5'h ors. - X - - X - Warm -season perennial. May LOVEGRASS bunch. Tolerates hot, dry slopes (Eramen curvula and acid, infertile soils. May be added to rates. KOREAN 25 lbs. all I'h X X - X X - warm season annual legume. LESPEEI lbs. Tolerates acid soils. May be Lef wgdm Ai ulacea I I added to mixes. * Northern Piedmont and Mountain region. See Plates 3.22-1 and 3.22-2. b Southern Piedmont and Coastal Plain. e May be used as a cover crop with spring seeding. d May be used as a cover crop with fall seeding. X May be planted between these dates. - May 601 be planted between these dates. � g t w Z s W W Z F W W W Z U Z W H C9 W W� i W ~wax U wz J>ZC3w VJp MIJrn7MQQZQ ` Op<aZ~O 0 Q U U CL& ZJOm IYm < Q 0zZ)aQ J D- Q of J F € O O W wCO � H O REVISIONS REV DATE COMMENT oRa1 c--K, 1 05/18/22 COUNTY COMMENTS PC R 2 07/01/22 COUNTY COMMENETS 4 Know what's below. Fall before you dig. ALWAYS CALL 811 It's fast. It's free. It's the law. NOT APPROVED FOR CONSTRUCTION THIS DRAWING IS INTENDED FOR MUNICIPAL ANwOR AGENCY REVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTION DOCUMENT UNLESS INDICATED OTHERWISE. PROJECT No.: V192076 DRAWN BY: MEG / PM CHECKED BY: PITY DATE: 1017/2021 CAD I.D.: ODS-0 PROJECT: VIRGINIA STORMWATER MANAGEMENT PLAN FOR RST RESIDENCES PROPOSED LOCATION: SEMINOLE TRAIL AND ASHWOOD BLVD. CHARLOTTESVILLE, VA22911 ALBEMARLE COUNTY, VA BOHLERI 9100 ARBORETUM PKWY, SUITE 360 RICHMOND, VIRGINIA23236 Phone: (804)893-8200 VA@BohlerEng.com ..a -ACTH nt ol RTAN YALTGER Lic. No. 0402056625 V� 07/01/2022 SHEET TITLE: EROSION DETAILS SHEET NUMBER: C-616 REVISION 2 - 07/01/22