HomeMy WebLinkAboutWPO202100064 Bond Estimates 2022-05-12Project Name: DS Tavern Water Protection Ordinance Amendment #1 to WP0202100064 WPO file number: WP0202100064 TM P(s): 05900-00-00-015AO Date Estimate Completed: 5/12/2022 Stormwater Management Bond Estimate( Mitigation Plan) Item Item No. Unit Unit Cost Cost Number installed permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame top (not inlet) 0 ea $500.00 $0.00 drop inlet or grate 0 ea $3,500.00 $0.00 manhole structure (per ft. rise) 0 ft $450.00 $0.00 pipe, rcp, cmp (15 to 48") 0.0 in d 0 ES-1,2 0 EC-1 0.0 ft $0.00 $0.00 aggregate base or drainage stone 0.0 in d 0.0 ft L 0.0 ft W 0.0 ton $35.00 $0.00 earthwork for trap/basin height of dam at toe 0 ft cut at high side 0 ft height of fill at face 0 ft cut at face 0 ft length of dam 0 ft length of cut 0 ft top width 0 ft width of cut 0 ft (area above transitio 0 sf (area below transitio 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transit i 0 ft (depth below transit 0 ft (area below transitio 0 sf (area above transitir 0 sf (total fill volume) 0.0 CY (total fill volume) 0.0 cy length of spillway 0 ft (TOAL CY estimate; 0 cy $13.00 $0.00 width of spillway 0 ft (spillway stone tons: 0 tons $50.00 $0.00 structures for basin riser height Oft riser diameter 0 in (riser unit price) $0.00 $0.00 barrel length 0 ft base plate or fdn $200.00 $0 barrel diameter 0 in (barrel cr -e) $0.00 $0.00 barrel collars $200.00 $0 baffle length 0 ft $50.00 $0 REF. PLAN SHEET L101, Landscape Calculations and Notes - Mitigation REF. PLAN SHEET 1-502, DS Tavern plant schedule trees ( 8 canopy+ 31 understory; only 23 required for Mitigation) 23 ea $275.00 $6,325.00 shrubs (152, L502: 25 required for Mitigation, 1-101) 25 ea $50.00 $1,250.00 seedlings 0 ea $5.00 $0.00 underdrain (LF) 0 ft $5.00 $0.00 biofilter soil mix (CY) 0 cy $45.00 $0.00 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 5/12/2022 Project Name: DS Tavern Water Protection Ordinance Amendment #1 to WP0202100064 WPO file number: WP0202100064 TM P(s): 05900-00-00-015AO Date Estimate Completed: 5/12/2022 Stormwater Management Bond Estimate ( Mitigation Plan) Item Item No. Unit Unit Cost Cost Number installed maintenance access road (LF) 0 ft $50.00 $0.00 rip -rap, placed depth 0 ft length 0.0 ft width 0.0 (tons) 0 $60.00 $0.00 survey and layout (price per 0.1 mi.) acres 0 basins 0 $0.00 mobilization - revised from $2,500 to $1,000 since SWIM facility construction differs from Landscape mobilization $1,000.00 as -built drawings (per facility) 0 ea $2,000.00 $0.00 materials testing (per facility) 0 ea $2,000.00 $0.00 compaction testing (per dam) 0 ea $3,000.00 $0.00 manufactured facilities (attach manufacturer's or contractor's price as a base) $0.00 cost sum $8,575.00 contingency $857.50 Total $9,440 5/12/2022