HomeMy WebLinkAboutWPO202200029 Calculations 2022-07-11MONTICELLO CONTEMPLATIVE SITE
COUNTY OF ALBEMARLE, VIRGINIA
DESIGN CALCULATIONS & NARRATIVE
REF. WP02022000xx
JULY 19 2022
•
TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
Prepared by: Kimberly Roeser, PE
Timmons Group
608 Preston Ave, Suite 200
Charlottesville, VA 22903
434.327.1685
Kimberly A Roeser 7
be. No. 63054 a
111 11Z G?�
Table of Contents
Section Title
Project Narrative
2 LD 229 — Storm Sewer Design Computations
LD 204 — Storm Inlet Design Computations
4 LD 347 — Hydraulic Grade Line Computations
Virginia Runoff Reduction Method Worksheet Summary
Proiect Narrative:
This project includes the construction of a new walking path, as well as associated
landscaping. The limits of disturbance totals 0.39 acres.
Stormwater ManaEement:
Water Quality
In the pre -developed condition, the site is an undeveloped area (0.39 acres managed turf).
In the proposed condition, there will be 0.11 acres of impervious cover and 0.28 acres of
managed turf. Per the Virginia Runoff Reduction Spreadsheet, this development will
require that 0.21 lbs. of phosphorus be removed per year. Nutrient credits will be
purchased to meet stormwater quality requirements.
Water Quantity
In existing condition, the entire site drains towards the southwest. In the developed
condition, the runoff from the disturbed area will maintain the existing drainage pattern
and drain towards the southwest as sheet flow. A level spreader is provided at the point of
concentrated discharge to return runoff to sheet flow. Therefore, this project fulfills the
requirements of section 9VAC25-970-66 Section D.
LD229
STORM SEWER DESIGN COMPUTATIONS
STORM FREQUENCY 70
PROJECT: Monticello Contemplative Site
LOCATION:
COUNTY: Albemarle
Designed by:
Checked by:
UNITS ENGLISN
PIPE
NO
FROM POMT
TO POINT
DRAM.
AREA
"A"
Acre
(3)
RUNOFF
COEFF,
"C"
(4)
CA
TOTAL
INLET
TIME
Minutes
(9)
RAM
FALL
1n
(8)
RUNOFF
Q
CPS
(9)
INVERTELEVATIONS
LENGTH
of Pipe
Ft
(12)
SLOPE
Ft/Ft.
(13)
SIZE
(Dia. Or
SpaNRise)
In.
(14)
SHAPE
Capacity
CPS
(15)
Friction
Slope
FUFt.
VEL
V.
PUS.
(16)
FLAW
UME
Min
(19)
REMARKS
(I8)
INCRE-ACCUM-
MENT
(5)
ULATED
(6)
ADDTL
CA
UPPER
END
(10)
LOWER
END
(11)
REFERENCE
(I)
STA.
REFERENCE
(2)
STA.
IH
112
110
042/
0450
0.192
0.192
0.000
6000
6230
1.197
830628
830"0
18778
0010
120W
Circular
3858
0001
4.343
0On
109
110
108
0009
0.850
0NO,
0-1"
0.000
6-012
6209
1235
830338
830.130
20988
0-010
12000
Circular
3858
0001
44381
00/9
109
108
106
0000
O.OW
0.000
0.199
0-000
6151
6186
1231
830030
829-690
A1 366
0-010
12000
Cimular
3858
0001
44376
0.13/
105
106
102
0000
O.OW
0000
0.199
0-000
6288
6146
Im
829569
829160
40942
0-010
12000
Cimuar
3-858
0001
4369
0.156
103
1M
102
0588
0450
0265
0265
0-000
6-000
6230
1"a
829657
829J60
24.868
0-020
120W
Cimular
545I
0002
6098
0068
101
102
100
0000
0000
OOco
oa64
0000
6445
6.102
2829
829055
828.800
8SI2
0030
12000
Cimuar
6683
0005
8.193
RRn
FORM LO 201 STORMWATER INLET COMPUTATIONS SHEET 1 OF
ROU PROJECT Mon lb come plal eSlle DESIGNER: KAM DATE 711aOM
CHECKED: UNITSAGUSH
INLETSOFT BY ENSOFTEC DATE711I
LD347 PROJECT: Monticello Contemplative Site DESIGNED BY:
HYDRAULIC GRADE LINE ANALYSIS
Checked:
INCIDENCE PROBABILITY 10 Year
INLET
OR
JUNCTION
INLET
STATION
OUTLET
WATER
SURFACE
ElEV
DIA
PIPE
Do
(In)
DESIGN
DISCH.
Go
(CFS)
LENGTH
PIPE
LO
(ED
FRICTION
SLOPE. SW
(FT/M
FRICTION
LOSS
Hf
(ED
JUNCTION LOSS
FINAL
H
(Ft)
Inkt
Waled
su a
E.H.
RM
Ek
Coom
V.
Ho
(R)
OI
N
OM
N'32g
HI
Ante
HA
HI
1.3
HI
OE
HI
102
$29.6
12
2.83
8.51
0.54%
0.05
8.17
0.26
1.65
6.1
10.05
0.58
0.2
89.59
0.21
0.67
0
TRUE
0.38
829.98
832.06
OK -2.08
106
829.98
12
1.22
40.94
0.10%
0.04
4.37
0.07
1.23
4.38
5.39
0.3
0.1
12.11
0.D4
0.22
0
TRUE
0.15
830.13
833.77
OK -3.64
108
830.47
12
1.23
36.02
0.10%
0.04
4.38
0.07
1.24
4.38
5.41
0.3
0.1
67.57
0.18
0.36
0
TRUE
0.22
830.69
834.44
OK -3.75
110
830.93
12
1.24
20.79
0.10%
0.02
4.38
0.07
1.2
4.34
5.2
0.29
0.1
68.04
0.18
0.36
0
TRUE
0.2
831.13
835.35
OK 4.22
112
831.24
12
1.2
18.78
0.10%
0.02
4.34
0.07
0
0
0
0
0
0
0
0.07
0.1
TRUE
0.07
831.31
834.68
OK -3.37
104
831.T
12
1.65
24.87
0.18%
0.05
6.1
0.14
0
0
0
0
0
0
0
0.14
0.19
TRUE
0.14
831.91
833.37
OK -1.45
DEQ Virginia Runoff Reduction Method Re -Development Compliance Spreadsheet - Version 3.0
02011 BMP Standards and Specifications 02013 Draft BMP Standards and Specifications
data input cells
Project Name: MONTICELLO CONTEMPLATIVE SITE
Date: 5/27/2022 constant values
Linear Development Project? No calculation cells
Site Information
Post -Development Project (Treatment Volume and Loads)
Enter Total Disturbed Area (acres) ->
D.39
Check.,
BMP Design Specifications List.
2013 Draft
Stds & Specs
Maximum reduction required.
Lineorproject? No
The site's net increase in impervious cover (acres) is:
Land cover areas entered correctly?
Post -Development
'®
Total disturbed area entered? ./
Pre-ReDevelopment Land Cover (acres)
A sails BSoils CSoils
Dsoils
Totals
Forest/Open Space (acres) -- undisturbed
forest/open space
OAO
Managed Tort (acres) -- disturbed, graded for
yards or other turf to be mowmed/anaged
0.39
0.39
Impervious Cover (acres)
ON
0.00
0.39
Post -Development Land Cover (acres)
A Soils
BSoils
CSoils
Dsoils
Totals
Forest/Open Space (acres) -- undisturbed,
protected forest/open space or reforested land
0.00
Managed Tud (acres) -- disturbed, graded for
yards cur other turf to be mowed/managed
0.28
0.28
Impervious Cover (acres)
0.11
0.11
Area Check
OR.
OR.
OR.
OR.
0.39
Constants
Runoff Coefficients Rv
Annual Randall (inches)
43
ASoils
BSoils
CSoils
Dsoils
Target Rainfall Event (inches)
IN
Forest/Open Space
0.02
0.03
0.04
0.05
Total Phosphorus (TP) EMC(mg/L)
0.26
Managed Turf
0.15
0.20
0.22
0.25
Total Nitrogen (TN) EMC Img/L)
1.86
Impervious Cover
0.95
0.95
0.95
0.95
Target TP Load (lb/acre/W)
0.41
Pj(unitless correction factor)
0.90
mul TI:r=
LAND
COVER
SUMMARY POST
DEVELOPMENT
Land Cover Summary -Pre
Land Cover Summary-Post(Final)
Land Cover Summary -Post
Laird Cover Summnry-Post
Pre-ReDevelopment
Listed
Adjusted'
Post Renee. & New ImperviousPOSt-R•Developmen[
Pont -Development New Impervious
Forest/Open Space
Forest/Open Space
Forest/Open Space Cover (acres)
0.00
0.00
0
0 .00
Cover (acres)
Coast (a.)
Weighted Rv(farest)
OAO
ON
Weighted Rv(forest)
ON
Weighted Faltered)
0.00
%Forest
0%
0%
%Forest
0%
%Forest
0%
Managed Turf Cover (acres)
0.39
0.28
Managed Turf Cover
028
Managed Tud Cover
028
(acres)
(acres)
Weighted Rv(turf)
0.20
0.20
Weighted Far (turf)
0.20
Weighted Rv(turq
0.20
%Managed Turf
100%
IN%
%Managed Turf
72%
%Managed Tuff
100%
Impervious Cover (acres)
ON
ON
Impervious Cover (acres)
0.11
Re
(acres) s
000
New Impervious Cover 0.11
Cove
Cover (acres)
(acres)
Rv(impervious)
0.95
0.95
Rv(im"mious)
0.95
Rv(impervious)
0.95
Rv(impervious) 0.95
%Impervious
096
0%
%Impervious
28%
%Impervious
0%
Total She Area lames)
0.39
0.28
Final Are Area (acres)
0.39
Total genes. $he Mea
0.28
Site Be
0.20
0.20
Final Post D. Site Re
0.41
Renee Site Rv
0.20
Treatment Volume and
Nutrient Load
Treatment
Volume and
Post-ReDevelopment
Nutrient Load
amen
Pre-Rellevelo t Treatment Volume
Final Post -Development
Pont -Development
(acre-k)
IONS
0.0047
Treatment Volume
(acre-k)
0.0134
Treatment Volume
(acre-ft)
0.0047
Treatment Volume
(acre-k)
0.0087
amen
Pre-Rellevelo t Treatment Volume
Final Port -Development
Post-ReDevelopment
Post -Development
(cubic feet)
283
203
Treatment Volume
583
Treatment Volume
203
Treatment Volume(nrbic
379
(cubic feet)
(cubicfeet)
feet)
Pre-ReDevelopment TP Load
Final Post.
Post-ReDevelopment
Post -Development TP bad
(lb/yr)
0.18
0.13
Developmen[TP Load
0.37
Load (TP)
0.13
(lb/yr) 0.24
(Ib/yr)
(IbIW)"
Pre-Renevelopmen[ TP Load per acre
Final Poo -Development TP
PoSPRenevelopment TP
pmer,Tyr)
OA6
0.46
Load per acre
D.9a
Load me acre
D.4B
pb/we/nl
(lb/acre/,)
Baseline TP Load (lb/yr)
Max. Reduction Required
(0.41 lbs/acre/yr applied to pre -redevelopment area excluding pervious
0.11
(Below Pre-
10%
land proposed for new impervious cover)
ReDevelopment bad)
'Adjusted Land CoveSumma r
% ry.
TP Load Reduction
TP Load Reduction
Pre ReDevelopment land rover minus pervious land coverer resL/open spare or monagetl
Required for
0.01
Required for New
0.19
turf/ ocreagepmposedfornewimpervious cover
Redeveloped Area
Redeveloped
Area (lb/yr)
(Ib/yr)
Adjusted total acreage is consistent wilt Post-ReDevelopment acreage (minus acreage of
new impervious rover).
Column I shows load redu ntlon requnement for new impervious cover (hosed on new
developmentloadlimiq 0.41 Ihs/acre/year).
Post -Development Requirement for
TP Load Reduction Required (16/yr)
0.21
Nitrogen Loads (Informational Purposes
Only)
Final Pos -Development TN bad
Pre-ReDevelopment TN Wad(lb/yr)
1.27
IPoaL-ReDevelopment&Newlmpervious)
2.62
Ib/yr)
Site ulta(Water Quality Compliance)
Area LM1x
amlay
w nlay
nMe
or
uyyMe
or
aMa TwaMwitt VMumelR°I
RunoR MJuaim Volume and TP By P'aWRe Area
mlx'I
wmO
ne l�xMl
u%u l�xMl
TotalP Ihlns
mao0Yn1
am ONnI
reenOYnl-
eml�xMt
Total MWogan lau lrl rm4un Puryme[I
maolVvrl
MO I�xMI
mm ObM
Virginia Runoff Reduction Method Workshest
DEC, Virginia Runoff Reduction Method Re -Development Compliance Spreadsheet - Version 3.0
LIMP Design Specifications List: 2013 Draft Stds & Specs
Site Summary
Project Title: MONTICELLO CONTEMPLATIVE SITE
Date: 44708 Total Rainfall (in): 43
Total Disturbed Acreage: 0.39
Site Land Cover Summary
Pre-ReDevelopment Land Cover (acres)
Asoils
BSolls
CSolls
DSolis
Totals
%of Total
Forest/Open (acres)
0.00
0.00
0.00
0.00
0.00
0
Managed Turf(acres)
0.00
1 0.39
0.00
0.00
0.39
100
Impervious Cover (acres)
0.00
0.00
0.00
0.00
0.00
0
0.39
100
Post-ReDevelopment Land Cover (acres)
Asoils
BSoils
CSolls
DSoils
Totals
%of Total
Forest/Open (acres)
0.00
0.00
0.00
0.00
0.00
0
Managed Turf(acres)
1 0.00
0.28
0.00
0.00
0.28
72
Impervious Cover (acres)
0.00
0.11
0.00
0.00
0.11
28
0.39
100
Site Tv and Land Cover Nutrient Loads
Final Port -Development
Post-
post-
Adjusted Pre-
(Post-ReDevelopment
ReDevelopmem
Developmentm
ReDevelopment
ervious
& New I p )
(New Impervious)
Site Rv
0.41
0.20
0.95
0.20
Treatment Volume(ft)
583
203
379
203
TP Load(lb/yr)
0.37
0.13
0.24
0.13
Total TP Load Reduction Required (lb/yr) 0.21 0.01 0.19
Final Post-Developmem Load
(Post-ReDevelopment & New Impervious)
Pre-
ReDevelopment
TN Load (Ib/yr)
2.62
1.27
Pre,
ReDevelopment
Final Post -Development
TP Load per acre
TP Load per acre
:S1
(Ib/acre/yr)
(Ih/acre/yr)
0.46
0.94
Summary Print
Virginia Runoff Reduction Method] Woftheet
Site Compliance Summary
Maximum% Reduction Required Below 10%
Pre-ReDevelopment Load]
Total Runoff Volume Reduction (k')
0
Total TP Load Reduction Achieved (lb/yr)
0.00
Total TN Load Reduction Achieved (lb/yr)
0.00
Remaining Post Development TP Load
0.37
(lb/yr)
Remaining TP Load Reduction (lb/yr)
0.21
Required
Summary Print