BELVEDERE PHASE 5
H&H Calculations
BELVEDERE PHASE 5
Tax Map Parcel 62-16D
July 1st, 2022
LOCATION: liEALTH
Albemarle, Virginia
S
DEVELOPER: 0 DUSTIN E.GREENE
New Belvedere, Inc A
610 West Rio Road Lic.No.55833
Charlottesville, Virginia 22901 '14 ' Tv I
PREPARED BY: S(VONAL ENA()
Dustin Greene, PE
Roudabush, Gale &Associates
999 Second Street SE
Charlottesville, VA 22902
INDEX
Executive Summary 2
Drainage Area Summaries, Tc's and Calculations 3
VRRM Spreadsheet 4
Letter of Availability 5
Post-developed Hydrographs 6-9
Routed Dry Pond 10-13
BELVEDERE PHASE 5
Executive Summary:
The purpose of this amendment is to show that the private storm sewer system for lots 245-
254 was not constructed in accordance with the approved plans. The backs of the townhouses and
yards are no longer draining to the retention basin as shown on sheet 3 of VSMP amendment#3 of
belvedere phase IIB (WPO201600071). The rears of these lots now drain to the fire road dry pond
as shown on sheet A18.2 of this VSMP (WPO202000034) submittal. Changes to the outlet
structure ensure that the regulated storms are below the approved, post-developed flows, thus
satisfying water quantity requirements. Per conversation with county engineer 6/7/22 0.18 lbs/yr of
nutrient credits will be used to offset the phosphorous removal that would have been generated
from the drainage going to the retention pond. The original nutrient purchase of 9.68 lbs of
phosphorous per year and the remaining 0.18 lbs do not exceed the 10 lbs/yr of phosphorous that
would trigger onsite compliance strategies along with offsite requirements.
BELVEDERE PHASE 5
PRE-DEVELOPED POA#2
AREA=2.68 AC
CN = 65
Tc= 9.9min
POST-DEVELOPED SITE OUTFALL#2
AREA= 2.74 AC
CN =69
Tc= 9.9min
UPDATED POST-DEVELOPED SITE OUTFALL#2
AREA= 3.04 AC
MANAGED TURF =2.64 AC (CN 65)
IMPERVIOUS = 0.40 AC (CN 98)
CN =69
Tc= 9.9 min
Project Name: BELVEDERE PHASE 5 CLEAR ALL data input cells
Date: 6/9/2022 constant values
BMP Design Specifications List: 2013 Draft Stds&Specs calculation cells
final results
Site Information
Post-Development Project (Treatment Volume and Loads)
Land Cover (acres)
A Soils B Soils C Soils D Soils Totals
Forest/Open Space(acres)--undisturbed,
protected forest/open space or reforested land 0.00
Managed Turf(acres)--disturbed,graded for
yards or other turf to be mowed/managed 0.20 0.20
Impervious Cover(acres) 0.10 0.10
0.30
Constants Runoff Coefficients(Rv)
Annual Rainfall(inches) 43 A Soils B Soils C Soils D Soils
Target Rainfall Event(inches) 1.00 Forest/Open Space 0.02 0.03 0.04 0.05
Total Phosphorus(TP)EMC(mg/L) 0.26 Managed Turf 0.15 0.20 0.22 0.25
Total Nitrogen(TN)EMC(mg/L) 1.86 Impervious Cover 0.95 0.95 0.95 0.95
Target TP Load(lb/acre/yr) 0.41
Pj(unitless correction factor) 0.90
Post-Development Requirement for Site Area
TP Load Reduction Required(Ib/yr) 0.18
Rivanna River Nutrient Credit Bank Certificate No.James-039
June 24, 2022
Dustin Greene, PE
Roudabush, Gale &Associates, Inc
dgreene(a,ro udabush.com
Re: Purchaser: New Belvedere, Inc.
Project Name: Belvedere Phase 5 —(WPO-2020-00034)
6th Order HUC: 020802040203
Nutrient Credits: .18
Dear Dustin,
This letter is to confirm the availability to your project(referenced above) of authorized Nutrient
Credits sufficient to meet the your above referenced estimated requirements of Nutrient Credits
at our Rivanna River nutrient offset credit bank facility(the`Bank").The Bank has been registered
with the Virginia Department of Environmental Quality (DEQ). These Nutrient Credits are
generated and managed under the terms of the Reduction Implementation Plan for the Bank dated
November 2017, which was authorized by (DEQ)on September 5, 2018.
The Bank has been authorized to provide Nutrient Credits for use in the James River watershed.
These credits are transferable to those entities regulated under DEQ's Storm Water Management
program in accordance with VA Code 62.1-44.15:27.
The sale price for .18 pounds of phosphorous is $2,700.00.This pricing is valid through July 30,
2022.
Hotel Street C• .ttal, LLC, Bank Sponsor
By Its M• .4 ger
•
Thomas • ►es Ross II
540-687 0 71
TJRos ei lawfirm.com
Rivanna River Nutrient Offset Trading Bank,31 Garrett Street,Warrenton,Virginia 20186
6
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®2019 by Autodesk, Inc.v2020 Tuesday,06/28/2022
Hyd. No. 65
Post Dev to POA#2
Hydrograph type = SCS Runoff Peak discharge = 2.686 cfs
Storm frequency = 1 yrs Time to peak = 12.03 hrs
Time interval = 2 min Hyd. volume = 7,743 cuft
Drainage area = 3.040 ac Curve number = 69
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 9.90 min
Total precip. = 3.02 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Post Dev to POA#2
Q (cfs) Hyd. No. 65 -- 1 Year Q (cfs)
3.00 3.00
2.00 2.00
1.00 1.00
0.00 -- ' \- 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Hyd No. 65 Time (hrs)
7
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®2019 by Autodesk, Inc.v2020 Tuesday,06/28/2022
Hyd. No. 65
Post Dev to POA#2
Hydrograph type = SCS Runoff Peak discharge = 4.367 cfs
Storm frequency = 2 yrs Time to peak = 12.03 hrs
Time interval = 2 min Hyd. volume = 11,893 cuft
Drainage area = 3.040 ac Curve number = 69
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 9.90 min
Total precip. = 3.65 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Post Dev to POA#2
o (cfs) Hyd. No. 65 --2 Year Q (cfs)
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
1.00 1.00
0.00 — 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Hyd No. 65 Time (hrs)
8
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®2019 by Autodesk, Inc.v2020 Tuesday,06/28/2022
Hyd. No. 65
Post Dev to POA#2
Hydrograph type = SCS Runoff Peak discharge = 10.19 cfs
Storm frequency = 10 yrs Time to peak = 12.03 hrs
Time interval = 2 min Hyd. volume = 26,667 cuft
Drainage area = 3.040 ac Curve number = 69
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 9.90 min
Total precip. = 5.52 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Post Dev to POA#2
Q (cfs) Hyd. No. 65-- 10 Year Q (cfs)
12.00 12.00
10.00 10.00
8.00 8.00
6.00 6.00
4.00 4.00
2.00 2.00
0.00 -- S. - 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hyd No. 65
9
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®2019 by Autodesk, Inc v2020 Tuesday,06/28/2022
Hyd. No. 65
Post Dev to POA#2
Hydrograph type = SCS Runoff Peak discharge = 23.11 cfs
Storm frequency = 100 yrs Time to peak = 12.00 hrs
Time interval = 2 min Hyd. volume = 60,002 cuft
Drainage area = 3.040 ac Curve number = 69
Basin Slope = 0.0 % Hydraulic length = 0 ft
Tc method = User Time of conc. (Tc) = 9.90 min
Total precip. = 9.07 in Distribution = Type II
Storm duration = 24 hrs Shape factor = 484
Post Dev to POA#2
Q (cfs) Hyd. No. 65-- 100 Year Q (cfs)
24.00 24.00
20.00 20.00
16.00 16.00
12.00 12.00
8.00 8.00
4.00 4.00
0.00 — 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Hyd No. 65 Time (hrs)
10
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®2019 by Autodesk, Inc.v2020 Tuesday,06/28/2022
Hyd. No. 66
AB Fire Road Basin
Hydrograph type = Reservoir Peak discharge = 0.761 cfs
Storm frequency = 1 yrs Time to peak = 12.27 hrs
Time interval = 2 min Hyd. volume = 7,735 cuft
Inflow hyd. No. = 65 - Post Dev to POA#2 Max. Elevation = 427.40 ft
Reservoir name = Fire road basin AB Max. Storage = 1,937 cuft
Storage Indication method used.
AB Fire Road Basin
Q (cfs) Hyd. No. 66-- 1 Year Q (cfs)
3.00 3.00
2.00 2.00
1.00 1.00
0.00 - `- 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hyd No. 66 Hyd No. 65 Total storage used = 1,937 cuft
• Pond Report 11
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®2019 by Autodesk, Inc.v2020 Tuesday,06/28/2022
Pond No. 19 - Fire road basin AB
Pond Data
Contours-User-defined contour areas.Average end area method used for volume calculation.Begining Elevation=426.50 ft
Stage/Storage Table
Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft)
0.00 426.50 120 0 0
0 50 427.00 2,607 682 682
1.50 428.00 3,711 3,159 3,841
3.50 430.00 5,084 8,795 12,636
5 50 432 00 6,559 11,643 24,279
7.50 434 00 8,275 14,834 39,113
9 50 436.00 10,296 18,571 57,684
11 50 438.00 12,656 22,952 80,636
13.50 440.00 15,799 28,455 109,091
Culvert/Orifice Structures Weir Structures
[A] [B] [C] [PrfRsr] [A] [B] [C] [D]
Rise(in) = 15.00 6 00 0 00 0 00 Crest Len(ft) = 12.57 0.00 0 00 0.00
Span(in) = 15.00 6.00 0 00 0.00 Crest El.(ft) = 432.50 0.00 0.00 0.00
No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3 33 3 33
Invert El.(ft) = 426.10 426.50 0.00 0.00 Weir Type = 1 --- --- ---
Length(ft) = 186.47 0.70 0.00 0.00 Multi-Stage = Yes No No No
Slope(%) = 11.79 0.00 0.00 n/a
N-Value = .012 013 .013 n/a
Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area)
Multi-Stage = n/a Yes No No TW Elev.(ft) = 0.00
Note.Culvert/Onfice outflows are analyzed under inlet Qc)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s)
Stage(ft) Stage/ Discharge Elev(ft)
14.00 440 50
12.00 438.50
10.00 436.50
8.00 434.50
6.00 432.50
4.00 430.50
2.00 428 50
0.00 426.50
0.00 2 00 4 00 6.00 8.00 10 00 12.00 14.00 16.00 18.00 20.00 22.00
Total Q Discharge(cfs)
12
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®2019 by Autodesk,Inc v2020 Tuesday,06/28/2022
Hyd. No. 66
AB Fire Road Basin
Hydrograph type = Reservoir Peak discharge = 1.017 cfs
Storm frequency = 2 yrs Time to peak = 12.27 hrs
Time interval = 2 min Hyd. volume = 11,884 cuft
Inflow hyd. No. = 65 - Post Dev to POA#2 Max. Elevation = 427.91 ft
Reservoir name = Fire road basin AB Max. Storage = 3,552 cuft
Storage Indication method used.
AB Fire Road Basin
0 (cfs) Hyd. No. 66--2 Year 0 (cfs)
5.00 5.00
4.00 4.00
3.00 3.00
2.00 2.00
1.00 1.00
0.00 — N.------- 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hyd No. 66 Hyd No. 65 Total storage used = 3,552 cuft
13
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®2019 by Autodesk, Inc.v2020 Tuesday,06/28/2022
Hyd. No. 66
AB Fire Road Basin
Hydrograph type = Reservoir Peak discharge = 1.550 cfs
Storm frequency = 10 yrs Time to peak = 12.43 hrs
Time interval = 2 min Hyd. volume = 26,659 cuft
Inflow hyd. No. = 65 - Post Dev to POA#2 Max. Elevation = 429.44 ft
Reservoir name = Fire road basin AB Max. Storage = 10,162 cuft
Storage Indication method used.
AB Fire Road Basin
Q (cfs) Hyd. No. 66 -- 10 Year Q (cfs)
12.00 12.00
10.00 10.00
8.00 - 8.00
6.00 6.00
4.00 4.00
2.00 2.00
0.00 - 0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hyd No. 66 Hyd No. 65 Total storage used = 10,162 cuft
14
Hydrograph Report
Hydraflow Hydrographs Extension for Autodesk®Civil 3D®2019 by Autodesk,Inc v2020 Tuesday,06/28/2022
Hyd. No. 66
AB Fire Road Basin
Hydrograph type = Reservoir Peak discharge = 2.223 cfs
Storm frequency = 100 yrs Time to peak = 12.63 hrs
Time interval = 2 min Hyd. volume = 59,993 cult
Inflow hyd. No. = 65 - Post Dev to POA#2 Max. Elevation = 432.37 ft
Reservoir name = Fire road basin AB Max. Storage = 27,047 cult
Storage Indication method used
AB Fire Road Basin
Q (cfs) Hyd. No. 66 -- 100 Year Q (cfs)
24.00 24.00
20.00 20.00
16.00 16.00
•
12.00 12.00
8.00 8.00
4.00 4.00
0.00
0.00
0 2 4 6 8 10 12 14 16 18 20 22 24 26
Time (hrs)
Hyd No. 66 Hyd No. 65 Total storage used = 27,047 cuft