HomeMy WebLinkAboutSDP202200032 Plan - Approved 2022-07-12SITE DEVELOPMENT PLAN
LEGEND
OWNER
Ja-Zan Limited Partnership
EXISTING
NEW
DESCRIPTION
P.O. Box9035
Charlottesville, VA 22911
BOUNDARIES
DEVELOPER
BENCHMARK
Centennial American Properties
SITE PROPERTY LINE
935 South Main Street, Suite 201
ADJACENT PROPERTY LINE
Greenville, SC 29601
PLAN PREPARATION
BUILDING SETBACK
PARKING SETBACK
Shimp Engineering, P.C.
912 East High Street
SITE TEXT
Charlottesville, VA 22902
10
10
PARKING COUNT
(434) 227-5140
TOPOGRAPHY
ZONING
INDEX CONTOUR
Planned Development Shopping Center, Entrance Corridor (Overlay)
ZMA2020-00009 (amendment to ZMA88-16) approved on December 2, 2020, amending the allowable square footage for the
- - - - - -
INTERVAL CONTOUR
subject property to a maximum of 110,000 square feet.
311.5 x
�1n
SPOT ELEVATION
MAGISTERIAL DISTRICT
311.5 TC xI
TOP OF CURB ELEVATION
Rivanna
311.5 TW xI
TOP OF WALL ELEVATION
SOURCE OF TITLE
311.5 BW x1-
BOTTOM OF WALL ELEVATION
DB 1169 PG 347
........ -
STREAM
SETBACKS
STREAM BUFFER
Front Minimum: 10' from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside of the
100 YEAR FLOODPLAIN
right-of-way; for off-street parking or loading spaces, 10' from any public street right-of-way
BUILDING
Front Maximum: 30' from the right-of-way or the exterior edge of the sidewalk if the sidewalk is outside of the
right-of-way; none, on any lot, including a corner lot, abutting a principal arterial highway or
BUILDING
interstate
RETAINING WALL
Side & Rear Minimum: If the abutting lot is zoned residential, rural areas, or the Monticello Historic district: (i) no portion of
any structure, excluding signs, shall be located closer than 50 feet from the district boundary; and
STAIRS
(ii) no off-street parking or loading space shall be located closer than 20 feet to the district boundary
EDGE OF PAVEMENT
If the abutting lot is zoned commercial or industrial, any primary structure shall be constructed and
ROAD CENTERLINE
separated in accordance with the current edition of the Building Code.
FRONT OF CURB
Side & Rear Maximum: None
BACK OF CURB
SOURCE OF BOUNDARY AND TOPOGRAPHY
vao
CG-12 TRUNCATED DOME
Boundary & topographic survey provided by Meridian Planning Group LLC
SIDEWALK
FLOODZONE
BIKE PARKING
According to FEMA Flood Insurance Rate Map, effective date February 4, 2005 (Community Panel 51003C0145D), this property
HANDICAP ACCESSIBLE AISLE
is not located within a Zone AE 100-year floodplain.
!�
l�
HANDICAP PARKING
RESERVOIR WATERSHED
MATERIAL
This site is within the Powell Creek Watershed.
CONCRETE
This site is not within a watershed of a public water supply.
RIPRAP
WATER & SANITARY SERVICES
�����
----- ----- ----- ----- -----
ASPHALT
Site is served by ACSA public water and sewer.
EC-2 MATTING
GENERAL CONSTRUCTION NOTES
EC-3 MATTING
1. Prior to any construction within any existing right-of-way, including connection to any existing road, a permit shall be obtained
WETLAND
from the Virginia Department of Transit (VDOT). This plan as drawn may not accurately reflect the requirements of the
TREELINE
permit.Where any discrepancies occur the requirements of the permit shall govern.
2. All materials and construction methods shall conform to the current specifications and standards of VDOT unless otherwise
X
X
FENCE
noted.
UTILITY
3. Erosion and siltation control measures shall be provided in accordance with the approved erosion control plan and shall be
installed prior to any clearing, grading or other construction.
-0-
-0-
UTILITY POLE
4. All slopes and disturbed areas are to be fertilized, seeded and mulched.
GUY WIRE
5. The illbllp i21hitl
. e maximum allowable slope s :orzona:vertil Where reasonably . ere reasonaobtainable,lesser slopes of 3:1 or better are to be
( ) Ylp
(1)
acheived.
OHIJ
-OHIJ
OVERHEAD UTILITY
6. Paved, rip -rap or stabilization mat lined ditch may be required when in the opinion of the County Engineer or designee it is
UNDERGROUND UTILITY
deemed necessary in order to stabilize a drainage channel.
uGu
uGu
7. All traffic control signs shall conform with the Virginia Manual for Uniform Traffic Control Devices.
STORM
8. Unless otherwise noted all concrete pipe shall be reinforced concrete pipe - Class III.
STORM MANHOLE
9. All excavation for underground pipe installation must comply with OSHA Standards for the Construction Industry (29 CFR Part
1926)
L°
�°
DROP INLET
GENERAL WATER & SEWER NOTES
STORM SEWER
1. Work shall be subject to inspection by Albemarle County Service Authority inspectors. The Contractor will be responsible for notifying the
ROOF DRAIN
proper service authority officials at the start of the work.
SANITARY
2. The location of existing utilities across the line of the proposed work are not necessarily shown on the plans and where shown, are only
approximately correct. The contractors shall on his own initiative locate all underground lines and structures as necessary.
SANITARY MANHOLE
3. All materials and construction shall comply with the current edition of the general water and sewer construction specifications as adopted by
the Albemarle County Service Authority.
SANITARY SEWER MAIN
4. Datum for all elevations shown in National Geodetic Survey.
SANITARY SEWER LATERAL
5. The contractor shall be responsible for notifying "MISS UTILITY" (1-800-552-7001).
S
S
6. All water and sewer pipes shall have a minimum of 3.5 feet of cover measured from the top of pipe, over the centerline of pipe. This includes
WATER
all fire hydrant lines, service laterals and water lines, etc.
7. All water and sewer appurtenances are to be located outside of roadside ditches.
W
W/
WATER LINE
8. Valves on deadend lines shall be rodded to provided adequate restraint for the valve during a future extension of the line.
0
0
WATER METER
9. Trees are not permitted in the ACSA easement.
10. The contractor shall be responsible to comply with the no -lead regulation regarding brass fittings effective January 4, 2014 (Senate Bill 3874
0
WATER METER VAULT
which amends the Safe Drinking Water Act).
11. All public water and sewer facilities shall be dedicated to the Albemarle County Service Authority.
Mt
FIRE HYDRANT
12. Backflow prevention is required for all connections to the water main.
A
A
FIRE DEPARTMENT CONNECTION
GAS
GAS
GAS
GAS LINE
EASEMENTS
CONSTRUCTION
GRADING
ACCESS
SIGHT DISTANCE
UTILITY
STORMWATER FACILITY MAINTENANCE
STORMWATER ACCESS
DRAINAGE
SANITARY
-
- ' -
WATERLINE
GASLINE
NOTE:
1. THE SIZE OF THE
SYMBOLS MAY VARY
FROM WHAT IS SHOWN.
FOREST LAKES SELF -STORAGE
EXISTING USE
Open
PROPOSED USE
Self -Storage
LAND USE SCHEDULE
EXISTING
Area
%
Building
0 SF
0.0%
Pavement
5,770 SF
57.1%
Sidewalk
0 SF
0.0%
Open Space
143641SF
96.1%
Total=
149,411 SF
(3.43 ac.)
PROPOSED
Area
%
Building
35,227 SF
23.6%
Pavement
36,248 SF
24.3%
Sidewalk
4,737 SF
3.2%
Open Space
73,199 SF
48.9%
Total=
149,411 SF
(3.43 ac.)
BUILDING HEIGHT
35'
PARKING SCHEDULE
Self -Storage: Light warehousing is an unscheduled use. No more than two employees will be present at any given time. The
proposed parking is provided to accommodate the trip generation given below.
13 spaces provided
SIGNS
All signs and pavement shall conform with the latest edition of the MUTCD Guidelines.
A sign permit must be issued in accordance with the Albemarle County Sign Regulations prior to placement of any signs on -site.
Contractor shall provide handicap signs as shown on plan.
GENERAL NOTES
1. The information and data shown or indicated with respect to the existing underground utilities at or contiguous to the site are
based on information and data furnished to the owner and engineer by the owners of such underground facilities or others.
The owner or engineer shall not be responsible for the accuracy or completeness of such information or data. The
contractor shall have full responsibility for confirming the accuracy of the data, for locating all underground utilities, for
coordination of the work with owners of such underground utilities during construction, for the safety and protection thereof
and repairing any damage thereto resulting from the work. All of these conditions shall be met at no additional cost to the
owner. The contractor shall contact "Miss Utilities" of Virginia at 1-800-552-7001 prior to the start of work.
2. When working adjacent to existing structures, poles, etc., the contractor shall use whatever methods that are necessary to
protect structures from damage. Replacement of damaged structures shall be at the contractor's expense.
3. The contractor shall be responsible for protecting all existing site structures from damage and coordinating work so that the
owner can make necessary arrangements to modify/protect existing structures from damages.
4. The contractor shall be responsible for notifying all utility owners, adjacent land owners whose property may be impacted
and the Virginia Department of Transportation prior to completing an off -site work.
9 P P P P 9 Y
5. Contractor shall notify and coordinate all work involving existing utilities with utility owners, at least 72 hours prior to the start
of construction.
6. Contractor shall immediately report any discrepancies between existing conditions and contract documents to the owner
and engineer.
7. Contractor shall submit for the approval of the owner submittals of all specified materials listed in the plans, to include shop
drawings, manufacturer's specifications and laboratory reports. the owner's approval of submittals will be general and will
not relieve the the contractor from the responsibility of adherence to the contract and for any error that may exist.
8. All bare areas shall be scarified, limed, fertilized, seeded and mulched.
9. All trees, saplings, brush, etc. shall be removed from within the right of way and the drainage easements.
10. Visibility of all mechanical equipment from the Entrance Corridor shall be eliminated.
11. Retaining walls require separate building permits.
12. All water, sewer, and fire lines require NEW inspection and testing procedures. ACSA performs any testing and inspections
of the public sewer and water main(s). The Albemarle County Building Inspections Department (ACBID) does a visual
inspection and witnesses the testing of the building drain, water service pipe, and the sprinkler lead-in connection. The
developer/contractor is responsible to retain a Special Inspector as outlined in the updated Albemarle County Policy for Site
Utilities to perform the visual inspection and testing of all utilities not covered by ACSA or ACBID. This includes building
sewers, water, and fire line branches between the main and the meter(s)/building(s). The Special Inspector's report must be
submitted and approved by the Albemarle County Engineering Department prior to a Certificate of Occupancy being issued.
13. Accessible parking spaces, access aisles, and accessible route shall be installed in accordance with ICC ANSI At 17.1-09.
14. Where the flood level rims of plumbing fixtures are below the elevation of the manhole cover of the next upstream manhole
in the public sewer, the fixtures shall be protected by a backwater valve installed in the building drain, branch of the building
drain or horizontal branch serving such fixtures. Plumbing fixtures having flood level rims above the elevation of the
manhole cover of the next upstream manhole in the public sewer shall not discharge through a backwater valve."
15. All roof drains shall discharge in a manner not to cause a public nuisance and not over sidewalks.
16. Buildings or structures built before January 1, 1985 must have an asbestos survey performed in order to apply for a
demolition permit. Asbestos removal permits are required if positive for such from Albemarle County and VDOLI. Contact
VDOLI for their additional requirements and permits for demolition projects and 540-562-3580x131.
ITE TRIP GENERATION
AM
PM
Daily
Use Description
ITE
Oty
In
Out
Total
In
Out
Total
Total
Mini -Warehouse
151
105,760 SF
6
5
11
8
10
18
160
GFA
County File Number Pending
TAX MAP 46, PARCEL 134-3
ALBEMARLE COUNTY, VIRGINIA
VICINITY MAPSCALE:1"=1000'
*4%p
®TW Bible FeRo'•u I I
4
�au,el r,l (�
Baptist Cbu¢n �F
M[,oASm
msuumbntsemz
W
ti
St,bldpe S.I.
�
enuwnea.lne neport
ell
BonaG.•• 3n
Tpr...
sav�.ao
dmna Teele19
.] l y " .yi OrII FCh
Aua�
ia.
SHEETINDEX
C1 COVER
C2 EXISTING CONDITIONS
C3 SITE PLAN
C4 GRADING & UTILITY PLAN
C5 LANDSCAPE PLAN
APPROVED
by the Albemarle County
Community Development Department
Date JuIv 12.2022
File # SDP202200032
Application Type Initial Site Plan
Lead Reviewer: Mariah Gleason
APPROVALS
ROUTE 29
SITE
wa
e
EIcnoiJ
NI ui unncc
0 0
P• Rpwerwa,n
�r Fe
c
•� .aPm.,b.Wh
\NnmomQ
twg by®
v SfOnH Sfttl POUufR
;MSPo
wmsperingv
wopas Sprt.:am K3
.bnRa � �aa
Brue R,Uq
Radiant so,e.,
7
IMAGE PROVIDED BY GOOGLE MAPS
SHIMP
EN GI EERI G� LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
�ALTH OA
O HT.qTFh1iJV141MP 9
45183
w�
T. 6
SITE DEVELOPMENT PLAN
FOREST LAKES
SELF -STORAGE
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
Current Development Planner Date 2022.05.16
REVISION:
Current Development Engineer Date 2022.07.06
Fire Official Date
Building Official Date
FILE NO.
Albemare County Service Authority Date 20.023
Virginia Department of Transportation Date COVER
Architectural Review Board Date
C 1
TMP 46134-10
N/F FERMIUM, LLC
DB 2377 PG 249
DB 1169 PG 340 (PLAT) s
,�0 „�0X
G, 4Y
�o PO 011 Q�A3
o° y
r
TOP=526.71
4" PVC IN=522.86
4" PVC OUT=522.76
SSMH
TOP=525.43
8" PVC IN=521.48
8" PVC OUT=521.38
TOP-521.16
8" PVC IN=507.11
8" Pvc OUT=507.01
N/F GEORGE R. & MARY R. MERCER
- DB 3522 PG 181
N, DB 3522 PG 194 (PLAT)
20' ACCESS EASEMENT
DB 1064 PG 533
DB 1071 PG 491 _
DB 1126 PG 178 - \\ /40' ACCESS EASEMENT /
DB 1169 PG 340 & 347 DB 1323 PG 404
- \ / 35' SLOPE &
16' CONSTRUCTION EASEMENT
DB 3526 PG 183
� 45' & VARIABLE
STORM & SANITARY SEWER EASEMENT
DB 1064 PG 533
DB 1169 PG 340 & 347
/
TMP 46B4-2
N/F SSo, LLC
DB 4859 PG 358
DB 4872 PG 153 (PLAT)
SSM W
TO
P=530.16
/4 PVC IN=51021
4" PVC OUT=510.11
TMP 46B4-4
N/F JA-ZAN LIMITED PARTNERSHIP
f DB 1144 PG 382
SS807 \
S,�\ 30ZS8
APPROX. LOCATION OF EXISTING 8" WATERLINE, PROPERTY OF RWSA
AS SHOWN AT DB 1071 PG 491
\ VARIABLE WIDTH STORM SEWER
EASEMENT
\ DB 1281 PG 342
I I�
_ _/ \ WV
SHIMP
ENGINEERING
LAND PLANNING - PROJECT MANAGEMENT
SSMH
/ TOP=522.39
8" PVC I1\1=507.54 912 E. HIGH ST. 434.227.5140
\ / 8" PVC OUT=507.44
\ � I CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
\ I
� 1
NLTH pp
/ O
SSMH 45183
Jus�H11P a
U, TOP=522.47
8" PVC IN=509.42
\ \ 8" PVC OUT=509.32
i , �_`vlylo AL
SITE DEVELOPMENT PLAN
FOREST LAKES
�,\-����y
SELF-STO RAG E
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2022.05.16
REVISION:
2022.07.06
_
SDMH GRATE
TOP=512.71
210420014 24" RCP IN=507.56
14.795 24" RCP OUT=507.46
FILE NO.
20.023
VARIABLE EASE STOR SEWER
EASEMENT
_
Fiber Optic Marker BOX
EXISTING
CONDITIONS
DB 1281 PG 342
15' VEPCO EASEMENT ,K
DB 1084 PG 186
15' TELEPHONE EASEMENT 30 0 30 60 90
DB 1113 PG 396
/
Scale: 1"=30'
Cn
N/F GEORGE R. & MARY R. MERCER
- DB 3522 PG 181
N, DB 3522 PG 194 (PLAT)
20' ACCESS EASEMENT
DB 106PG /
DB 1071 491 PG 491 _
DB 1126 PG 178 - \\ /40' ACCESS EASEMENT /
DB 1169 PG 340 & 347 DB 1323 PG 404
- \ / 35' SLOPE &
16' CONSTRUCTION EASEMENT
DB 3526 PG 183
TMP 32-36F 30' ACCESS EASEMENT /
"DO NOT ENTER" SIGN AT N/F SJS LIMITED COMPANY 200 DB 1064 PG 533\
ROUTE 29 ENTRANCE DB 1478 PG 261 DB 1071 PG 491
DB 1064 PG 533 (PLAT) DB 1126 PG 178` _
DB 1169 PG 340 & 347
IF
TMP 46134-10
N/F FERMIUM, LLC
DB 2377 PG 249
DB 1169 PG 340 (PLAT)
i
� 45' & VARIABLE
STORM & SANITARY SEWER EASEMENT
DB 1064 PG 533
DB 1169 PG 340 & 347
TMP 46B4-2
N/F SSo, LLC
DB 4859 PG 358
DB 4872 PG 153 (PLAT)
TMP 46B4-4
N/F JA-ZAN LIMITED PARTNERSHIP
DB 1144 PG 382
SF OF OUTDOOR
AREA
VARIABLE WIDTH STORM
EASEMENT
DB 1281 PG 342
SHIMP
ENGINEERING
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
�O
10 �I
U JusOS
x11P a
45183
K�'VS'IONAL E���
SITE DEVELOPMENT PLAN
FOREST LAKES
SELF -STORAGE
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2022.05.16
REVISION:
2022.07.06
911111IN►[6l
20.023
VARIABLE WIDTH STOR SEWER
EASEMENT SITE PLAN
DB 1281 PG 342
15' VEPCO EASEMENT ,K
DB 1084 PG 186
15' TELEPHONE EASEMENT 30 0 30 60 90
DB 1113 PG 396
/ Scale: 1 "=30' C 3
\ \\ IMH 52-1 - '
NSF GEORGE R. & MARY R. MERCER /
DB 3522 PGC 81
� DB 3522 PG 194 (PLAT)
i
SHIMP
ENGINEERINGh
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
�O
U JUsx11P a
t: 45183
'�- 14�
a,S IONAL
SITE DEVELOPMENT PLAN
FOREST LAKES
SELF -STORAGE
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2022.05.16
REVISION:
2022.07.06
91ma►[f7
4111 1191
GRADING &UTILITY PLAN
so
C4
IMP
N/F GEORGE R. & MARY R. MERCER
DB 3522 PGC 181 '
N, DB 3522 PG 194 (PLAT)
�Q, /
TMP 32-36F
N/F SJS LIMITED COMPANY 200 /
DB 1478 PG 261
— — — — DB 1064 PG 533 (PLAT)
Or TMP ��� 2 2 \\ \ \\
/ \ \ TMP 46B4-4
N/F JA—ZAN LIMITED PARTNERSHIP
LP / .� / \ f DB 1144 PG 382
LP
LP / Qr
sj� Zs
TMP 46134-10
N/F FERMIUM. LLC — v v \ / \ / // //��; :
Zs
DB 2377 PG 249 2
IDS 1169 PG 340 (PLAT)
\IF
Or
N
21�
Or
t _
/ TMP 46B4-2 Or
/ N/F SSQ, LC ��F — — — / \ V p
DB 4859 PG 358
DB 4872 PG 153 (PLAT)Sj
�-
Or
/
LANDSCAPE SCHEDULE
Plant
Min.
Total
Canopy
Total
Symbol
Planting Type
Botanical Name
Common Name
Cal./Height
Quantity
Height(ft)
SF
Canopy
in 10 Yrs
SF
0 p
Large Deciduous Tree
Quercus polustris
Pin Oak
2.5"
10
31
370
3700
•
3r
Large Deciduous Tree
Quercus robur
English Oak
2.5"
10
31
329
3290
Large Deciduous Tree
Zelkova serrato
"Village
"Village Green"
1.5"
5
32
452
2260
Green"
Zelkova
JW n
Large Deciduous Tree
Betula nigra "Heritage"
"Herita e" River
9
10-12' Ht.
3
25
397
1191
tm
Birch
OSj
Medium Deciduous Tree
Sophora japonica
'Regent"
"Regent"
Scholartree
2.5"
7
28
394
2758
Viburnum
Semi —Ever 9 reen Shrub
rh tido h lum
Y P
"Alleghany"
24" Ht.
37
10
64
2368
' Alleghany"
Viburnum
TOTAL
SF:
15567
DRY DATE TION POND
/
LANDSCAPING REQUIRED:
SITE REQUIREMENT (SEC. 32.7.9.8): 10% CANOPY REQUIRED.
m
SITE AREA: 3.426 AC (149,237 SF)
/
ti J � Q
149,237 SF x 10% = 14,924 SIF
CANOPY REQUIRED: 14,924 SF
CANOPY PROVIDED: 15,567 SF
INTERIOR ROAD TREES: LARGE SHADE TREES (2.5" CAL.) — 40' O.C. mJ
LL
PARALLEL TO WORTH CROSSING (370 LF)
i
REQUIRED: (370/40) = 9 LARGE SHADE TREES m�
)
PROVIDED: 9 LARGE SHADE TREES
INTERIOR PEDESTRIAN WAYS: MEDIUM SHADE TREES (2.5" CAL.) - 25' O.C.
PROVIDED: 4 LARGE SHADE TREES
ZMA2020-09 OUTDOOR SEATING AREA: 1 LARGE SHADE TREE PER 500 SF,
4,000 SF SEATING AREA
\\
REQUIRED: (4000/500) = 8 LARGE SHADE TREES
\
PROVIDED: 8 LARGE SHADE TREES
<\ \ V\
i%
SHRUBS PROVIDED ADJACENT TO PARKING LOT TO MINIMIZE IMPACT ON
ENTRANCE CORRIDOR
I \
NOTES:
\ \
1. All site plantings of trees and shrubs shall be allowed to reach, and
I \
y
be maintained at, mature height; the topping of trees is prohibited.
Shrubs and trees shall be minimally and only to support the
\ \
pruned
QP
overall health of the plant.
\
2. All landscaping and screening shall be maintained in a healthy
\
'
condition by the current owner or property owners' association and
replaced when necessary. Replacement material shall comply with the
J'
approved landscape plan.
3. All new planting shown on the plan will be completed after building
and road construction to avoid tree planting damage.
4. All disturbed slopes 3:1 or steeper to have low maintenance ground
cover.
5. Any existing tree proposed to remain shall be replaced in kind if
negatively impacted by improvements associated with this project.
30 0
/ ScalW
I
SHIMP
ENGINEERING
LAND PLANNING - PROJECT MANAGEMENT
912 E. HIGH ST. 434.227.5140
CHARLOTTESVILLE VA, 22902 JUSTIN@SHIMP-ENGINEERING.COM
�O
U JUsx11P a
Lk 45183
4�
K'VS'JONAL
SITE DEVELOPMENT PLAN
FOREST LAKES
SELF -STORAGE
ALBEMARLE COUNTY, VIRGINIA
SUBMISSION:
2022.05.16
REVISION:
2022.07.06
FILE NO.
20.023
LANDSCAPE PLAN
.K
30 60 90
C5